The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Identify installation requirements.
|
|
Building plans and specifications and any special instructions are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with installation of LPG storage facilities, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements for company operations are identified and adhered to. Completed |
Evidence:
|
Gas load and design requirements are determined from plans, specifications, and job drawing or workplace instructions. Completed |
Evidence:
|
Storage capacity is calculated in compliance with regulatory authority and workplace requirements, ensuring adequacy to meet load details. Completed |
Evidence:
|
Regulator size and size of connections to cylinders are determined to meet capacity and load of the system in accordance with workplace requirements. Completed |
Evidence:
|
Appropriateness of selected location to provide required service is established in conformance to standards, design instruction and workplace requirements. Completed |
Evidence:
|
Quantity of cylinders and materials required is estimated from design instruction and selected to comply with standards and authorities' requirements. Completed |
Evidence:
|
Prepare for installation.
|
|
Materials and equipment are ordered and checked for compliance with docket and order form, and for acceptable condition. Completed |
Evidence:
|
Appropriate tools and equipment for installation of storage facility, including personal protective equipment, are identified, selected and checked for serviceability. Completed |
Evidence:
|
Appropriate testing apparatus is selected. Completed |
Evidence:
|
Work is planned in conjunction with others involved in or affected by the work. Completed |
Evidence:
|
Work area and materials are prepared to support efficient installation of system. Completed |
Evidence:
|
Install and test LPG storage system.
|
|
LPG cylinders and tank, piping, fittings and components are installed in conformance to standards and workplace requirements. Completed |
Evidence:
|
Regulator and associated pipework are installed in compliance with standards and workplace requirements. Completed |
Evidence:
|
Regulator is adjusted to provide flow pressure in conformance to standards and workplace requirements. Completed |
Evidence:
|
System is purged in accordance with standards. Completed |
Evidence:
|
System is tested in conformance to standards and workplace requirements. Completed |
Evidence:
|
Test equipment is removed and test data recorded in format required by regulatory authority and workplace requirements. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of or recycled in accordance with state or territory statutory and regulatory authority legislation and workplace procedures. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Information is accessed and documentation completed in accordance with workplace requirements. Completed |
Evidence:
|
Relevant authorities and supervisors are advised of job completion in conformance to regulatory and workplace requirements. Completed |
Evidence:
|