The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Obtain authority to undertake work on Type B gas appliances.
|
|
Design specification for Type B gas appliance to be installed and commissioned is accessed, analysed, interpreted and confirmed through a detailed site inspection. Completed |
Evidence:
|
Design specification matters requiring clarification are resolved through liaison with designer and gas authorities. Completed |
Evidence:
|
Formal authority to proceed with installation and commissioning is obtained before commencing work, in accordance with regulatory and code of practice requirements. Completed |
Evidence:
|
Regulatory and code of practice recording and reporting requirements are satisfied at appropriate times throughout the work sequence. Completed |
Evidence:
|
Prepare for work.
|
|
Safety (OHS) requirements associated with the workplace environment and installing, commissioning and servicing Type B gas appliances are accessed, interpreted and followed throughout the work. Completed |
Evidence:
|
Gas system components, electrical or electronic components and controls, and other required installation materials are identified from the design specification and obtained for the work. Completed |
Evidence:
|
Component specifications and manufacturer servicing manuals are obtained for planned work activity. Completed |
Evidence:
|
Tasks are planned in conjunction with others involved in or affected by the work. Completed |
Evidence:
|
Tools and equipment, including personal protective equipment, are selected consistent with installation, commissioning and servicing needs and checked for serviceability, and any faults are rectified or reported. Completed |
Evidence:
|
Quality assurance requirements for the work sequences are identified and followed. Completed |
Evidence:
|
Work area is prepared to support efficient installation, commissioning and servicing of Type B gas appliance. Completed |
Evidence:
|
Gas system and electrical safety checks and isolation procedures are completed and recorded to manufacturer and other authority requirements before commencing work. Completed |
Evidence:
|
Install Type B gas appliances.
|
|
Appliance components, including valve trains, burners and associated pipework and flue systems, are installed in accordance with approved design specifications. Completed |
Evidence:
|
Ventilation systems are installed in accordance with approved design specifications. Completed |
Evidence:
|
Electrical components, including terminations, are installed in accordance with design specifications and regulatory requirements. Completed |
Evidence:
|
Electrical wiring and wiring enclosures are installed in accordance with design specifications and regulatory requirements. Completed |
Evidence:
|
Installations are visually inspected at each stage of the work to ensure compliance with specifications and absence of damaged or faulty equipment and materials. Completed |
Evidence:
|
Commission and test Type B gas appliances.
|
|
Testing and servicing equipment appropriate to the requirement is selected, checked and prepared for use. Completed |
Evidence:
|
Gas and electrical safety checks and isolation procedures, including purging, are completed and recorded to manufacturer and other authority requirements before testing and commissioning are commenced. Completed |
Evidence:
|
Operational parameters of individual components are tested and adjusted to conform to specifications. Completed |
Evidence:
|
Appliance operations are tested first without and then with fuel, adjustments are completed as necessary and results recorded in accordance with approving authority requirements. Completed |
Evidence:
|
Flue gases are analysed in accordance with recognised industry practice and other authority requirements. Completed |
Evidence:
|
Service Type B gas appliances.
|
|
Nature and possible cause of faults or out of specification performance are identified from defect reports or operational records. Completed |
Evidence:
|
Electrical and gas safety checks and isolation procedures are completed and recorded to manufacturer and other authority requirements before servicing work is commenced. Completed |
Evidence:
|
Plans and diagrams are read and correctly interpreted to identify potential gas system and electrical fault pathways and locations. Completed |
Evidence:
|
Appropriate testing techniques, procedures and equipment are selected and applied to diagnose system faults or discrepancies. Completed |
Evidence:
|
Cause of fault or out of specification performance is identified and confirmed. Completed |
Evidence:
|
Options for correction are thoroughly analysed and most appropriate corrective action is selected. Completed |
Evidence:
|
Repair, replacement or adjustment is made in accordance with manufacturer specifications or service manuals. Completed |
Evidence:
|
Appliance is assessed to ensure compliance with relevant standards and manufacturer specifications prior to recommissioning and returning to service. Completed |
Evidence:
|
Clean up work area.
|
|
Work area is cleared and materials disposed of or recycled in accordance with federal, state and territory legislation and workplace procedures. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, serviced and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Information is accessed and documentation completed in accordance with workplace requirements. Completed |
Evidence:
|