The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Plans and specifications are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with setting out, installing and commissioning irrigation systems, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements. Completed |
Evidence:
|
Tools and equipment for setting out, installing and commissioning irrigation systems, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support efficient setting out, installation and commissioning of irrigation systems. Completed |
Evidence:
|
Identify installation requirements.
|
|
Irrigation system requirements are identified from plans, specifications and relevant information. Completed |
Evidence:
|
Underground cables, pipes and other existing services are located and allowed for. Completed |
Evidence:
|
Flow rate is correctly measured from water meter or other available source. Completed |
Evidence:
|
Water pressure (static head) is determined at source of supply. Completed |
Evidence:
|
Piping and system components are selected to comply with standards, plans and specifications. Completed |
Evidence:
|
Materials and equipment are identified, ordered and collected in accordance with workplace procedures. Completed |
Evidence:
|
Materials and equipment are checked for compliance with standards, docket and order form, and for acceptable condition. Completed |
Evidence:
|
Install and commission irrigation system.
|
|
Irrigation pipes are set out in accordance with plans, specifications and site requirements. Completed |
Evidence:
|
Pipe trenches are excavated in accordance with plans and specifications. Completed |
Evidence:
|
Pipe system is installed in accordance with plans, specifications, site requirements, manufacturer recommendations and standards. Completed |
Evidence:
|
Pipelines are flushed of air and foreign matter to installation standard. Completed |
Evidence:
|
Backflow prevention device is installed in accordance with standards. Completed |
Evidence:
|
Water emitters are installed and adjusted to produce required spray pattern. Completed |
Evidence:
|
Control valves are installed, operated and adjusted to achieve specified flow rate. Completed |
Evidence:
|
Installation is tested to comply with standards and authorities' requirements, and is adjusted. Completed |
Evidence:
|
Trenches are backfilled in accordance with plans and specifications and ground surface is reinstated. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Documentation is completed in accordance with workplace requirements. Completed |
Evidence:
|