The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Plans, specifications and any special instructions are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with fabricating and installing steel pressure piping, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements for company operations are identified and adhered to. Completed |
Evidence:
|
Work is planned in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements. Completed |
Evidence:
|
Tools and equipment are identified, selected and checked for serviceability. Completed |
Evidence:
|
Work area and materials are prepared to support efficient fabrication and installation of steel pressure piping. Completed |
Evidence:
|
Identify installation requirements.
|
|
Pipework configuration is identified from authorities' requirements, plans, specifications and relevant information. Completed |
Evidence:
|
Allowances for fabrication and/or assembly are determined and transferred. Completed |
Evidence:
|
Quantity and type of materials required are calculated from plans and specifications in accordance with regulatory authorities' and workplace requirements. Completed |
Evidence:
|
Materials are identified, ordered and collected in accordance with workplace procedures. Completed |
Evidence:
|
Materials are checked for compliance with docket and order form and for acceptable condition, and faults are reported. Completed |
Evidence:
|
Fabricate, install and test pipe system.
|
|
System is set out in compliance with design drawings or instructions. Completed |
Evidence:
|
Fixings and supports are installed to manufacturer requirements, job plans, specifications and workplace requirements. Completed |
Evidence:
|
Pipe system is fabricated and jointed in accordance with job plans, specifications and manufacturer requirements for mechanical type joints. Completed |
Evidence:
|
Pipe system is installed in specified location without damage or distortion to pipework or surrounding environment or other services. Completed |
Evidence:
|
Sustainability principles and concepts are applied throughout the installation. Completed |
Evidence:
|
Pipe system is tested and documented to comply with job specification, authorities' requirements, relevant Australian standards, codes of practice and workplace requirements. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification.. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Documentation is completed in accordance with workplace requirements. Completed |
Evidence:
|