Evidence Guide: CPCPMS3015A - Install and test ducting systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCPMS3015A - Install and test ducting systems

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for work.

  1. Plans and specifications are obtained.
  2. Safety (OHS) requirements associated with installing and testing ducting systems, and workplace environmental requirements, are adhered to throughout the work.
  3. Quality assurance requirements are identified and adhered to in accordance with workplace requirements.
  4. Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements.
  5. Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
  6. Work area is prepared to support efficient installation and testing of ducting systems.
Plans and specifications are obtained.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety (OHS) requirements associated with installing and testing ducting systems, and workplace environmental requirements, are adhered to throughout the work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality assurance requirements are identified and adhered to in accordance with workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment, including personal protective equipment, are selected and checked for serviceability.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is prepared to support efficient installation and testing of ducting systems.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify system requirements.

  1. Quantity and type of ducting system materials, including in-duct equipment, are calculated from plans, specifications and relevant information.
  2. Allowances for fabrication or assembly are determined and transferred.
  3. Materials are identified, ordered and collected in accordance with workplace procedures.
  4. Materials and equipment are checked for compliance with standards, docket and order form, and acceptable condition and faults are reported.
Quantity and type of ducting system materials, including in-duct equipment, are calculated from plans, specifications and relevant information.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Allowances for fabrication or assembly are determined and transferred.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials are identified, ordered and collected in accordance with workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials and equipment are checked for compliance with standards, docket and order form, and acceptable condition and faults are reported.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and insulate duct system.

  1. System is set out to comply with plans and specifications.
  2. Duct supports and fixings are positioned to comply with plans, specifications and manufacturer recommendations.
  3. Duct work is installed in accordance with plans and specifications.
  4. Circumferential joints are assembled and sealed in accordance with plans, specifications and manufacturer recommendations.
  5. Duct system is installed in specified location, without damage or distortion to surrounding environment or other services and in accordance with standards.
  6. Insulation materials are fixed in accordance with plans and specifications.
  7. Insulation materials are installed in specified location without damage to surrounding environment and in accordance with plans, specifications, standards and manufacturer recommendations.
  8. Diffusers and terminal devices are installed in accordance with plans and specifications and with no damage to ceiling or finished surfaces.
System is set out to comply with plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Duct supports and fixings are positioned to comply with plans, specifications and manufacturer recommendations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Duct work is installed in accordance with plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Circumferential joints are assembled and sealed in accordance with plans, specifications and manufacturer recommendations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Duct system is installed in specified location, without damage or distortion to surrounding environment or other services and in accordance with standards.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Insulation materials are fixed in accordance with plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Insulation materials are installed in specified location without damage to surrounding environment and in accordance with plans, specifications, standards and manufacturer recommendations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Diffusers and terminal devices are installed in accordance with plans and specifications and with no damage to ceiling or finished surfaces.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test duct work system.

  1. Test requirements are determined from plans and specifications.
  2. Appropriate test equipment is selected for specified tests.
  3. Duct system is tested under pressure in accordance with instructions and workplace procedures.
  4. Leak sources are identified and repaired using specified procedures and materials, to ensure correct flow operation.
  5. Details of test data are recorded in format required by the specification.
Test requirements are determined from plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate test equipment is selected for specified tests.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Duct system is tested under pressure in accordance with instructions and workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Leak sources are identified and repaired using specified procedures and materials, to ensure correct flow operation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Details of test data are recorded in format required by the specification.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up.

  1. Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures.
  2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures.
  3. Documentation is completed in accordance with workplace requirements.
Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is completed in accordance with workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of:

locating, interpreting and applying relevant information, standards and specifications to install and test small ducting systems

applying safety requirements throughout the work sequence, including the use of personal protective clothing and equipment

as a minimum the ability to, given the plans and specifications, install, insulate, test and balance from a plenum box or chamber a supply of heated air to three outlet grills; the installation shall incorporate hard and flexible duct work, including one transition piece and dampeners, ensuring:

correct identification of requirements and details of proposed installation

correct selection and use of appropriate processes, tools and equipment

completing all work to specification

compliance with regulations, standards and organisational quality procedures and processes

communicating and working effectively and safely with others.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

an induction procedure and requirement

realistic tasks or simulated tasks covering the minimum task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe working practices and addressing hazards and emergencies

material safety data sheets

research resources, including industry related systems information.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.

Required Skills and Knowledge

Required skills

Required skills for this unit are:

communication skills to:

access information

determine requirements

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

follow instructions

plan and sequence tasks with others

report faults

read and interpret:

documentation from a variety of sources

drawings and specifications

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

written skills to:

complete workplace documentation

document ducting system test

identifying and accurately reporting to appropriate personnel any faults in tools, equipment or materials

installing, insulating and testing ducting for ventilation, heating, cooling and exhaust systems, including in-duct equipment

numeracy skills to apply measurements and calculations

organisational skills, including the ability to plan and set out work

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to:

access and understand site-specific instructions in a variety of media

use mobile communication technology.

Required knowledge

Required knowledge for this unit is:

applicable Australian standards

application of flow rates, pressure and volume principles to testing procedures

characteristics of materials used in the system being tested

electrical and electronic principles and safety requirements

job safety analysis (JSA) and safe work method statements (SWMS)

levelling and alignment processes

OHS regulations relevant to the work activity

personal protective equipment requirements and use

processes of installing, insulating and testing ducting

SI system of measurement

statutory and authority requirements

system types and identification of system components

techniques for setting out, assembling, fixing and jointing duct work systems and components, including insulation and acoustic materials

types of repairs for detected leaks in the duct work system.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Safety (OHS) is to be in accordance with commonwealth, state and territory legislation and regulations and may include:

handling of materials

hazard control

personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including recognising and preventing hazards associated with:

hazardous materials and substances

service lines

surrounding structures and facilities

trip hazards

use of tools and equipment

work site visitors and the public

working at heights

working in proximity to others

use of firefighting equipment

use of first aid equipment

workplace environment and safety.

Environmental requirements are to cover:

clean-up protection

ozone protection

waste management.

Quality assurance requirements may include:

Environment Protection Authority (EPA)

internal company quality assurance policy and risk management strategy

International Standards Organisation

site safety plan

workplace operations and procedures.

Statutory and regulatory authorities include:

state or territory statutory authority

statutory gasfitting authority

statutory plumbing authority.

Tools and equipment may include:

hand and power tools

in-duct equipment, including:

fire dampers

noise attenuation fittings

volume control dampers

ladders

lifting and load shifting equipment, including:

chain blocks

elevated work platforms

forklifts

hand trolleys

hoists and jacks

rollers

scaffolds

measuring equipment

test equipment, including:

manometers

micro-manometers.

Ducting system materials:

include:

diffusers

ducting

fixings and supports

in-duct equipment

insulation

joints

plenum box and chamber

terminal devices

may be:

flexible

sheet metal

a combination.

Information may include:

charts and hand drawings

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions

material safety data sheets (MSDS)

memos

organisation work specifications and requirements

regulatory and legislative requirements, particularly those pertaining to:

building codes

OHS and environmental requirements

plumbing regulations

relevant Australian standards

safe work procedures relating to installing and testing ducting heaters

signage

verbal, written and graphical instructions

work bulletins

work schedules, plans and specifications.

Materials:

may include:

ducting:

fixings and supports

sheet metal:

flexible

combination

in-duct fittings:

plastic

sheet metal

insulation

insulation and acoustic materials may be:

acoustic and non-acoustic materials

externally insulated

fibreglass tissue factory bonded to the insulation

flexible aluminium laminate fabric

perforated double-sided aluminium foil factory bonded to the insulation

perforated zincanneal or other metal sheet fixed in the duct so that continuous insulation is obtained

resin-bonded mineral wool or glass fibre in faced or unfaced semi-rigid batt or board form, weight 20 to 100kg and m3

sheet materials

surface facings of PVC-coated fibreglass mesh factory bonded to the insulation

thermal and acoustic insulation for duct work and air handling equipment, handling air between 2 and 65°C

thermal insulation and sound absorption materials of resin-bonded mineral wool or glass fibre in unbound flexible blanket form, weight 20 to 65 kg and m3.

Fault reporting:

may be written or verbal

is to be in accordance with company's workplace procedures.

Diffusers and terminal devices include:

combined diffusers

control devices

cushion heads

grills

light fittings

outlets taken directly from duct and on flexible branch

pressure-reducing devices

registers

variable air volume (VAV) boxes.