The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Plans and specifications are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with installing split air conditioning, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements. Completed |
Evidence:
|
Tools and equipment, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support efficient installation of split air conditioning. Completed |
Evidence:
|
Identify installation requirements.
|
|
Quantity and type of material required for installation are determined from plans, specifications and relevant information. Completed |
Evidence:
|
Materials are identified, ordered and collected in accordance with workplace procedures. Completed |
Evidence:
|
Requirements for other services are identified and connection is planned in accordance with regulatory requirements. Completed |
Evidence:
|
Materials and equipment are checked for compliance with standards, docket and order form, and for acceptable condition and faults are reported. Completed |
Evidence:
|
Install and test system.
|
|
Installation is set out in compliance with plans and specifications. Completed |
Evidence:
|
Existing services are located and installation process is adjusted accordingly to avoid any disturbance. Completed |
Evidence:
|
Preparatory work is carried out to specifications without unnecessary damage to surrounding structures or environment. Completed |
Evidence:
|
Structural supports are installed in compliance with plans and specifications. Completed |
Evidence:
|
Ducting and control panels are installed in accordance with authorities' requirements, manufacturer recommendations, plans and specifications. Completed |
Evidence:
|
System is installed to manufacturer recommendations, plans and specifications. Completed |
Evidence:
|
Installation is tested in accordance with specifications, codes or standards for the application. Completed |
Evidence:
|
Test results are documented in required format. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Documentation is completed in accordance with workplace requirements. Completed |
Evidence:
|