The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Information, plans and specifications are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with testing and commissioning air and water systems, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements. Completed |
Evidence:
|
Tools and equipment for testing and commissioning air and water systems, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support efficient testing and commissioning process. Completed |
Evidence:
|
Determine testing requirements.
|
|
Equipment is checked for safe operation and correct functioning. Completed |
Evidence:
|
Equipment performance data is checked against plans, specification requirements and other relevant information. Completed |
Evidence:
|
Instruments and associated equipment suitable for measuring quantities are selected in accordance with job specification. Completed |
Evidence:
|
Prepare system for balancing.
|
|
Dampers are set in the open or specified position and operational check of system-related fans and ducting is carried out in accordance with workplace procedures. Completed |
Evidence:
|
Automatic control devices are energised to provide maximum demand for airflow. Completed |
Evidence:
|
Piping system is checked for flow direction and leaks, and operational check of system and related pumps is carried out. Completed |
Evidence:
|
All manual and automatic valves are set in the specified position. Completed |
Evidence:
|
Balance, test and commission system.
|
|
Valves or throttling devices are adjusted to achieve specified water flow ratings. Completed |
Evidence:
|
Air volumes moved by system fans are measured. Completed |
Evidence:
|
Dampers and terminal devices are correctly adjusted to achieve specified airflow ratings. Completed |
Evidence:
|
Automatic controls and devices are set to specified settings. Completed |
Evidence:
|
Testing and balancing of system is carried out in accordance with job specification and/or manufacturer recommendations. Completed |
Evidence:
|
Test and monitored results are documented in format required by job specification and/or manufacturer. Completed |
Evidence:
|
Restore work area.
|
|
Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Documentation is completed in accordance with workplace requirements. Completed |
Evidence:
|