The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Evaluate design parameters.
|
|
Scope of work is established for steam distribution systems. Completed |
Evidence:
|
Design requirements are determined from plans, specifications and client brief. Completed |
Evidence:
|
Cost-benefit analysis is conducted comparing a range of materials and system designs. Completed |
Evidence:
|
Statutory and regulatory requirements and Australian and New Zealand standards for the design of steam distribution systems are analysed and applied. Completed |
Evidence:
|
Manufacturer requirements and trade and technical manuals are interpreted. Completed |
Evidence:
|
Additional research, including a desktop study, is conducted to outline design parameters. Completed |
Evidence:
|
Performance requirements are established. Completed |
Evidence:
|
Plan and detail system components.
|
|
Layout of pipework systems and type and location of fittings and valves are planned. Completed |
Evidence:
|
Pipe size calculations are performed for a range of applications. Completed |
Evidence:
|
Steam appliances are specified, steam consumption is calculated and boilers required are sized and specified. Completed |
Evidence:
|
Steam circuits are detailed and distribution pressures for a range of applications are specified. Completed |
Evidence:
|
Steam trap types and their operation are specified and detailed. Completed |
Evidence:
|
Steam injection systems are specified. Completed |
Evidence:
|
Insulation is specified. Completed |
Evidence:
|
Pipe fixings are designed for a range of applications. Completed |
Evidence:
|
Approved materials, jointing methods and all installation requirements for steam distribution systems are specified. Completed |
Evidence:
|
Design and size systems.
|
|
Steam distribution systems and steam circuits are designed for a range of applications. Completed |
Evidence:
|
Steam distribution systems are designed and sized using computer software packages. Completed |
Evidence:
|
Prepare documentation.
|
|
Plans are prepared for a range of steam distribution systems. Completed |
Evidence:
|
Specification for a steam distribution system is prepared. Completed |
Evidence:
|
Testing and commissioning schedule is prepared. Completed |
Evidence:
|
Operation and maintenance manual is produced. Completed |
Evidence:
|