The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Evaluate design parameters.
|
|
Scope of work is established for trade waste pre-treatment systems. Completed |
Evidence:
|
Design requirements are determined from plans, specifications and client briefs. Completed |
Evidence:
|
Statutory and regulatory requirements and Australian and New Zealand standards for the design of trade waste pre-treatment systems are analysed and applied. Completed |
Evidence:
|
Trade waste applications are analysed and a cost-benefit analysis is conducted, comparing a range of pipe materials and system designs. Completed |
Evidence:
|
Manufacturer requirements and trade and technical manuals are interpreted. Completed |
Evidence:
|
Additional research, including a desktop study, is conducted to outline design parameters. Completed |
Evidence:
|
Performance requirements are established. Completed |
Evidence:
|
Plan and detail system components.
|
|
Layout of pipework systems and type and location of fittings and valves are planned. Completed |
Evidence:
|
Solid removal systems are planned and detailed. Completed |
Evidence:
|
Grease and oil interceptors, neutralising chambers and wash-down areas are planned and detailed. Completed |
Evidence:
|
Diffused air flotation systems are planned and detailed. Completed |
Evidence:
|
Bacterial treatment processes and combination and specialised treatment processes are detailed for a range of commercial and industrial applications. Completed |
Evidence:
|
Stormwater diversion and first-flush systems are detailed. Completed |
Evidence:
|
System calculations are performed for a range of applications. Completed |
Evidence:
|
Pumpwell, pump and pump control requirements are sized and detailed. Completed |
Evidence:
|
Pipe fixings are designed for a range of applications. Completed |
Evidence:
|
Approved materials, jointing methods and installation requirements for trade waste pre-treatment systems are specified. Completed |
Evidence:
|
Design and size systems.
|
|
Trade waste pre-treatment systems are designed for a range of applications. Completed |
Evidence:
|
Trade waste pre-treatment systems are designed and sized using computer software packages. Completed |
Evidence:
|
Prepare documentation.
|
|
Plans are prepared for a range of trade waste pre-treatment systems. Completed |
Evidence:
|
Specification for a trade waste pre-treatment system is prepared. Completed |
Evidence:
|
Testing and commissioning schedule is prepared. Completed |
Evidence:
|
Operation and maintenance manual is produced. Completed |