The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Identify water storage system requirements.
|
|
Plans, specifications and any special instructions are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with collection and storage of roof water, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements for company operations are identified and adhered to. Completed |
Evidence:
|
Site's annual rainfall is determined from meteorological or other relevant data. Completed |
Evidence:
|
Roof catchment area is determined from plans or site inspection. Completed |
Evidence:
|
Water consumption requirements for the installation are determined. Completed |
Evidence:
|
Total water storage requirements for the installation are determined. Completed |
Evidence:
|
Criteria for storage tanks, gutters, downpipes and other system components are determined in accordance with relevant Australian standard and other information. Completed |
Evidence:
|
Plan and prepare for installation.
|
|
Required materials are identified, ordered and collected in accordance with workplace procedures. Completed |
Evidence:
|
Work is planned in conjunction with others involved in or affected by the work. Completed |
Evidence:
|
Materials are checked for compliance with docket and order form and for acceptable condition, and faults are reported. Completed |
Evidence:
|
Work area and materials are prepared to support efficient installation. Completed |
Evidence:
|
Sustainability principles and concepts are applied to work preparation and application. Completed |
Evidence:
|
Install storage system.
|
|
Set out complies with design drawings or instructions. Completed |
Evidence:
|
Preparatory work, including installation of tank stand or standing, is carried out to specification without damage to surrounding structures or existing services. Completed |
Evidence:
|
System is installed in accordance with job specification and statutory and regulatory authority's requirements. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Documentation is completed in accordance with workplace requirements. Completed |
Evidence:
|