The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Drawings and specifications are obtained and confirmed by site inspection. Completed |
Evidence:
|
Safety (OHS) requirements associated with fabricating and installing roof drainage components, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements. Completed |
Evidence:
|
Tools and equipment, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support the fabrication and installation of roof drainage components. Completed |
Evidence:
|
Identify installation requirements.
|
|
Rainwater management system is identified as suitable for preventing rainwater penetration into building structure. Completed |
Evidence:
|
Roof drainage components required for installation are identified from drawings and specifications. Completed |
Evidence:
|
Fabrication patterns are drawn based on design and freehand sketch of roof drainage. Completed |
Evidence:
|
Quantity, type and sizing of drainage components, rainwater materials and accessories required are calculated from drawings and specifications in compliance with relevant Australian standards and local authorities' requirements and relevant information. Completed |
Evidence:
|
Box gutter support system is fabricated according to relevant Australian standard. Completed |
Evidence:
|
Materials are identified from drawings, specifications, patterns and/or calculations and ordered and collected in accordance with workplace procedures. Completed |
Evidence:
|
Materials and equipment are checked for compliance with docket and order form and for acceptable condition, and faults are reported. Completed |
Evidence:
|
Fabricate roof drainage components.
|
|
Method of fabrication, tools and machinery requirements are determined to suit job requirements. Completed |
Evidence:
|
Materials are marked out from drawings to fabricate roof drainage components. Completed |
Evidence:
|
Roof drainage components are fabricated in compliance with relevant Australian standards, drawings, specifications and site measurements. Completed |
Evidence:
|
Components are marked, packaged and prepared for delivery and installation in accordance with workplace procedures. Completed |
Evidence:
|
Set out and install roof drainage components.
|
|
Components are checked for compliance with docket and order form and for acceptable condition, and arranged in order of installation. Completed |
Evidence:
|
Roof drainage components are set out to comply with job specifications and site measurements. Completed |
Evidence:
|
Structural supports are installed in compliance with job specifications. Completed |
Evidence:
|
Roof drainage components are jointed in compliance with job specifications and relevant Australian standards. Completed |
Evidence:
|
Roof drainage system is installed in accordance with relevant Australian standards and job specifications. Completed |
Evidence:
|
Sustainability principles and concepts are applied throughout the installation Completed |
Evidence:
|
System is performance tested for satisfactory installation and remedied. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Documentation is completed in accordance with workplace requirements. Completed |
Evidence:
|