The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Drawings and specifications are obtained and confirmed by site inspection. Completed |
Evidence:
|
Safety (OHS) requirements associated with installing composite roof systems, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements. Completed |
Evidence:
|
Tools and equipment, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support efficient installation of the composite roof system. Completed |
Evidence:
|
Select composite roof system.
|
|
Composite roof system is identified for installation, including shape and type of roofing and materials required. Completed |
Evidence:
|
Quantity and type of materials and/or fittings required are calculated from design drawings and specifications in compliance with local authorities' requirements and relevant information. Completed |
Evidence:
|
Sustainability principles and concepts are applied to work preparation and application. Completed |
Evidence:
|
Manufacture roofing materials.
|
|
Materials are marked out from drawings and/or patterns to fabricate roof coverings and components. Completed |
Evidence:
|
Roof components are fabricated in accordance with plans and specifications. Completed |
Evidence:
|
Prepare for installation.
|
|
Quantity and type of manufactured roof covering and fittings required are calculated from design drawings and specifications in compliance with relevant Australian standards and regulatory requirements. Completed |
Evidence:
|
Proposed sealant, fixing materials, and roofing and flashing materials are selected and checked for compatibility. Completed |
Evidence:
|
Materials and equipment are identified, ordered and collected in accordance with workplace procedures. Completed |
Evidence:
|
Materials and equipment are checked for compliance with docket and order form and for acceptable condition, and faults are reported. Completed |
Evidence:
|
Install roof covering and components.
|
|
Safety mesh and thermal insulation are fixed in accordance with relevant Australian standards, job plans and specifications, and manufacturer requirements. Completed |
Evidence:
|
Required rainwater goods are installed in accordance with relevant Australian standards, plans and specifications. Completed |
Evidence:
|
Sheets are marked and trimmed prior to fixing and cut edges are treated according to manufacturer specifications. Completed |
Evidence:
|
Sheets are fixed in compliance with relevant Australian standards and manufacturer specifications. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Documentation is completed in accordance with workplace requirements. Completed |
Evidence:
|