The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Drawings and specifications are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with installing sewerage pump sets, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements. Completed |
Evidence:
|
Tools and equipment for installing sewerage pump sets, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support efficient installation of sewerage pump sets. Completed |
Evidence:
|
Identify installation requirements.
|
|
Location of pump is determined following site inspection. Completed |
Evidence:
|
Pump base requirements are determined from drawings and specifications and other relevant information. Completed |
Evidence:
|
Materials and equipment are identified, ordered and collected in accordance with workplace procedures. Completed |
Evidence:
|
Materials and equipment are checked for compliance with standards, docket and order form, and for acceptable condition. Completed |
Evidence:
|
Install sewerage pump equipment.
|
|
Pump is set out to comply with drawings, specifications, site requirements or job instructions, with consideration to the location of existing services. Completed |
Evidence:
|
Pumping equipment is installed in specified locations using recommended fixings. Completed |
Evidence:
|
Pipework and pump controls are connected in accordance with drawings, specifications, manufacturer requirements and standards. Completed |
Evidence:
|
Fuel tank fitting, alignment of shafts and couplings, and the use of mechanical joints comply with relevant specifications and manufacturer instructions. Completed |
Evidence:
|
Pumping equipment and related pipework are tested in accordance with standards and manufacturer recommendations, and test data is recorded in required format. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Documentation is completed in accordance with workplace requirements. Completed |
Evidence:
|