The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Site plans and specifications are obtained to establish location of the main. Completed |
Evidence:
|
Safety (OHS) requirements associated with installing of a water service, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work and statutory and regulatory authority requirements. Completed |
Evidence:
|
Tools and equipment for installing water services, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support efficient installation of water services. Completed |
Evidence:
|
Identify installation requirements.
|
|
Location of service is determined following site inspection. Completed |
Evidence:
|
Cables, conduits, pipes or other services are located and noted using relevant information. Completed |
Evidence:
|
Quantity and type of materials required are calculated or determined from plans and specifications. Completed |
Evidence:
|
Materials and equipment are identified, ordered and collected in accordance with workplace procedures. Completed |
Evidence:
|
Materials and equipment are checked for compliance with relevant Australian standards, docket and order form, and for acceptable condition. Completed |
Evidence:
|
Sustainability principles and concepts are applied to work preparation and application. Completed |
Evidence:
|
Install and test water services.
|
|
Pipelines and excavation areas are set out in accordance with plans and specifications. Completed |
Evidence:
|
Trenches are excavated in accordance with relevant Australian standards and regulatory authorities' requirements, and to required size. Completed |
Evidence:
|
Service control valve position is located. Completed |
Evidence:
|
Main is drilled and tapped in accordance with regulatory authorities' requirements and workplace procedures. Completed |
Evidence:
|
Service line is marked out at 90 o to the main in a straight line to the meter. Completed |
Evidence:
|
Selected process for installation of service pipe under roadway is undertaken in accordance with authorities' requirements. Completed |
Evidence:
|
Pipework is installed in accordance with job specification, authorities' requirements and design layout, including fitting designated service control valves. Completed |
Evidence:
|
Water meter is selected and installed in accordance with authorities' requirements, surrounding environment and climatic conditions, and in consideration of servicing or cleaning requirements. Completed |
Evidence:
|
Meter control valve is fitted at inlet in accordance with authorities' requirements. Completed |
Evidence:
|
Installation is tested for compliance with job specifications, relevant Australian standards and regulatory authorities' requirements. Completed |
Evidence:
|
Excavation is backfilled in accordance with specifications and authorities' requirements. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Documentation is completed in accordance with workplace requirements. Completed |