The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Determine the impact on fabrication plans of installation risks and constraints.
|
|
On-site health and safety risks relating to the installation of sprinkler systems are identified. Completed |
Evidence:
|
Constraints relating to access to on-site installation locations for sprinkler system pipes and components are identified. Completed |
Evidence:
|
Impact of installation risks and constraints on fabrication plans for fire sprinkler system pipes and components is considered and cost-effective and manageable solutions are determined. Completed |
Evidence:
|
Plan and specify pipes, fittings and components.
|
|
Current accurate drawingsand documentation are obtained and analysed, and measurements are taken on-site during construction if possible to confirm the accuracy of building dimensions. Completed |
Evidence:
|
The dimensions and design drawing locations of the selected fittings and components are checked and confirmed. Completed |
Evidence:
|
Fittings and components are planned and specified for ease and safety of installation and to provide cost-effective solutions. Completed |
Evidence:
|
Pipe lengths are calculated, specified and numbered on relevant drawings. Completed |
Evidence:
|
Produce fabrication documentation.
|
|
Appropriate pipe materials and features are confirmed and specified. Completed |
Evidence:
|
Supplier is consulted as necessary to discuss and negotiate efficient and cost-effective pipe fabrication options. Completed |
Evidence:
|
Individual pipe specifications are numbered and detailed on fabrication lists. Completed |
Evidence:
|
Drawings are supplied to support fabrication specifications, as required. Completed |
Evidence:
|