The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to use building design drawing software to set up project files.
|
|
Building design drawing software is installed and configured following relevant instructions. Completed |
Evidence:
|
Information to operate building design drawing software is accessed and interpreted to prepare for setting up project files. Completed |
Evidence:
|
Support for software installation and interpretation and application of software functions and operations is obtained as required. Completed |
Evidence:
|
Plan software drawing file requirements.
|
|
Project brief and designer’s notes are reviewed and scope and nature of building design project are identified. Completed |
Evidence:
|
Naming protocols for digital drawing files are determined according to project and workplace requirements and systems. Completed |
Evidence:
|
Types of drawings required by client, project and relevant authorities are determined in consultation with designer. Completed |
Evidence:
|
Title block information is confirmed with designer. Completed |
Evidence:
|
Checklist of drawing files required for project is prepared with file-naming protocols applied. Completed |
Evidence:
|
Folder name and location for digital project drawing files are confirmed with designer. Completed |
Evidence:
|
Set up project templates.
|
|
Building design drawing software support information is accessed to assist in adapting built-in templates to set up project template files. Completed |
Evidence:
|
Software support information is accessed to assist in creating original project template files. Completed |
Evidence:
|
Project template files are named according to file-naming protocols and saved in project folder in correct location. Completed |
Evidence:
|
Files are backed up according to workplace procedures. Completed |
Evidence:
|