Evidence Guide: CPPBDN4006 - Import and transpose information from external sources into digital building design drawings

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPPBDN4006 - Import and transpose information from external sources into digital building design drawings

What evidence can you provide to prove your understanding of each of the following citeria?

Confirm accuracy and compliance of externally-sourced drawings.

  1. Land survey drawings are checked for accuracy according to workplace requirements.
  2. Structural engineering drawings are checked for accuracy and compliance according to workplace requirements.
  3. Drawings and reports from engineers are checked for accuracy and compliance according to workplace requirements.
  4. Drawings, reports and drawing notations from consultants are checked for accuracy and compliance according to workplace requirements.
  5. Inaccuracies and non-compliance issues relating to drawings and drawing notations are reported to, and discussed with, architect or building designer.
  6. Architect’s or building designer’s observations on externally-sourced drawings are noted.
  7. Amended drawings are requested, noted details of amendments required are provided, and amended drawings are obtained from relevant engineers or consultants according to workplace requirements.
Land survey drawings are checked for accuracy according to workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Structural engineering drawings are checked for accuracy and compliance according to workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drawings and reports from engineers are checked for accuracy and compliance according to workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drawings, reports and drawing notations from consultants are checked for accuracy and compliance according to workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inaccuracies and non-compliance issues relating to drawings and drawing notations are reported to, and discussed with, architect or building designer.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Architect’s or building designer’s observations on externally-sourced drawings are noted.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Amended drawings are requested, noted details of amendments required are provided, and amended drawings are obtained from relevant engineers or consultants according to workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Import drawings from external sources into digital building design files.

  1. Compatibility of digital drawings from external sources for importing into digital building design files is determined and confirmed with architect or building designer.
  2. Building design software and work instructions relating to the importing of drawings from external sources are interpreted to determine options to be applied for different building design projects.
  3. Method for importing drawings is applied according to work instructions.
  4. Import options are applied to incoming files according to work instructions.
  5. Files depicting materials and scenery are imported to enhance presentation and conceptual drawings, as required.
  6. Digital building design files are re-named and saved according to workplace requirements.
  7. Files are checked for integrity, submitted to architect or building designer for approval, and amendments made as directed.
Compatibility of digital drawings from external sources for importing into digital building design files is determined and confirmed with architect or building designer.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Building design software and work instructions relating to the importing of drawings from external sources are interpreted to determine options to be applied for different building design projects.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Method for importing drawings is applied according to work instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Import options are applied to incoming files according to work instructions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Files depicting materials and scenery are imported to enhance presentation and conceptual drawings, as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Digital building design files are re-named and saved according to workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Files are checked for integrity, submitted to architect or building designer for approval, and amendments made as directed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Transpose information from externally-sourced drawings into digital building design files.

  1. Work instructions for transposing information from externally-sourced drawings into digital building design files are interpreted and confirmed with architect or building designer.
  2. Information is added to drawings according to work instructions and checked for accuracy and completeness of transposition according to workplace requirements.
  3. Details of externally-sourced documents are added to the list of supporting documents in the drawing set.
  4. Digital building design files are re-named and saved according to workplace requirements.
  5. Files are checked for integrity, submitted to architect or building designer for approval, and amendments made as directed.
Work instructions for transposing information from externally-sourced drawings into digital building design files are interpreted and confirmed with architect or building designer.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Information is added to drawings according to work instructions and checked for accuracy and completeness of transposition according to workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Details of externally-sourced documents are added to the list of supporting documents in the drawing set.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Digital building design files are re-named and saved according to workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Files are checked for integrity, submitted to architect or building designer for approval, and amendments made as directed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Confirm accuracy and compliance of externally-sourced drawings.

1.1.

Land survey drawings are checked for accuracy according to workplace requirements.

1.2.

Structural engineering drawings are checked for accuracy and compliance according to workplace requirements.

1.3.

Drawings and reports from engineers are checked for accuracy and compliance according to workplace requirements.

1.4.

Drawings, reports and drawing notations from consultants are checked for accuracy and compliance according to workplace requirements.

1.5.

Inaccuracies and non-compliance issues relating to drawings and drawing notations are reported to, and discussed with, architect or building designer.

1.6.

Architect’s or building designer’s observations on externally-sourced drawings are noted.

1.7.

Amended drawings are requested, noted details of amendments required are provided, and amended drawings are obtained from relevant engineers or consultants according to workplace requirements.

2.

Import drawings from external sources into digital building design files.

2.1.

Compatibility of digital drawings from external sources for importing into digital building design files is determined and confirmed with architect or building designer.

2.2.

Building design software and work instructions relating to the importing of drawings from external sources are interpreted to determine options to be applied for different building design projects.

2.3.

Method for importing drawings is applied according to work instructions.

2.4.

Import options are applied to incoming files according to work instructions.

2.5.

Files depicting materials and scenery are imported to enhance presentation and conceptual drawings, as required.

2.6.

Digital building design files are re-named and saved according to workplace requirements.

2.7.

Files are checked for integrity, submitted to architect or building designer for approval, and amendments made as directed.

3.

Transpose information from externally-sourced drawings into digital building design files.

3.1.

Work instructions for transposing information from externally-sourced drawings into digital building design files are interpreted and confirmed with architect or building designer.

3.2.

Information is added to drawings according to work instructions and checked for accuracy and completeness of transposition according to workplace requirements.

3.3.

Details of externally-sourced documents are added to the list of supporting documents in the drawing set.

3.4.

Digital building design files are re-named and saved according to workplace requirements.

3.5.

Files are checked for integrity, submitted to architect or building designer for approval, and amendments made as directed.

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Confirm accuracy and compliance of externally-sourced drawings.

1.1.

Land survey drawings are checked for accuracy according to workplace requirements.

1.2.

Structural engineering drawings are checked for accuracy and compliance according to workplace requirements.

1.3.

Drawings and reports from engineers are checked for accuracy and compliance according to workplace requirements.

1.4.

Drawings, reports and drawing notations from consultants are checked for accuracy and compliance according to workplace requirements.

1.5.

Inaccuracies and non-compliance issues relating to drawings and drawing notations are reported to, and discussed with, architect or building designer.

1.6.

Architect’s or building designer’s observations on externally-sourced drawings are noted.

1.7.

Amended drawings are requested, noted details of amendments required are provided, and amended drawings are obtained from relevant engineers or consultants according to workplace requirements.

2.

Import drawings from external sources into digital building design files.

2.1.

Compatibility of digital drawings from external sources for importing into digital building design files is determined and confirmed with architect or building designer.

2.2.

Building design software and work instructions relating to the importing of drawings from external sources are interpreted to determine options to be applied for different building design projects.

2.3.

Method for importing drawings is applied according to work instructions.

2.4.

Import options are applied to incoming files according to work instructions.

2.5.

Files depicting materials and scenery are imported to enhance presentation and conceptual drawings, as required.

2.6.

Digital building design files are re-named and saved according to workplace requirements.

2.7.

Files are checked for integrity, submitted to architect or building designer for approval, and amendments made as directed.

3.

Transpose information from externally-sourced drawings into digital building design files.

3.1.

Work instructions for transposing information from externally-sourced drawings into digital building design files are interpreted and confirmed with architect or building designer.

3.2.

Information is added to drawings according to work instructions and checked for accuracy and completeness of transposition according to workplace requirements.

3.3.

Details of externally-sourced documents are added to the list of supporting documents in the drawing set.

3.4.

Digital building design files are re-named and saved according to workplace requirements.

3.5.

Files are checked for integrity, submitted to architect or building designer for approval, and amendments made as directed.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Drawings must include at least one from each of the following:

consultant

engineer

land survey

structural engineering.

Workplace requirements must include:

building design project procedures, including:

communication protocols for liaising with external consultants

file naming, storing and saving systems and procedures

quality requirements

work health and safety requirements

roles and responsibilities of building project team, including extent and limitations of drafter’s role.

Compliance must include:

current Australian standards applicable to the building design

federal, state or territory, and local authority legislation and regulations applicable to the building design

National Construction Code.

Engineers must include one or more of the following:

electrical

fire safety

geotechnical

hydraulic

mechanical.

Consultants must include one or more of the following:

access

acoustic

arborist

bushfire

energy efficiency

flooding

lighting

traffic.

Building design software must include:

BIM-capable current industry-standard software.

Options to be applied must include:

colours

external references

layers

positioning

scale

views.