Evidence Guide: CPPBDN4010 - Prepare documentation for planning approval

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPPBDN4010 - Prepare documentation for planning approval

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and produce planning approval support documentation.

  1. Documentation requirements for planning approval applications are confirmed with relevant authorities.
  2. Design drawings required in applications for planning approval are confirmed with architect, building designer or relevant authorities.
  3. Compliance requirements for design drawings are confirmed with architect, building designer and relevant authorities.
  4. Timelines and methodologies for producing final design drawings are confirmed with architect or building designer.
  5. Drawings and documentation required from electrical, hydraulic, geotechnical, fire and mechanical engineers are specified and requested in consultation with architect or building designer.
  6. Drawings and documentation required from access, traffic, lighting, arborist, acoustic, energy efficiency and other relevant consultants are specified and requested in consultation with architect or building designer.
Documentation requirements for planning approval applications are confirmed with relevant authorities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design drawings required in applications for planning approval are confirmed with architect, building designer or relevant authorities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compliance requirements for design drawings are confirmed with architect, building designer and relevant authorities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timelines and methodologies for producing final design drawings are confirmed with architect or building designer.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drawings and documentation required from electrical, hydraulic, geotechnical, fire and mechanical engineers are specified and requested in consultation with architect or building designer.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drawings and documentation required from access, traffic, lighting, arborist, acoustic, energy efficiency and other relevant consultants are specified and requested in consultation with architect or building designer.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare and submit planning approval application.

  1. Design drawings are checked for planning approval compliance and required additions or changes are made.
  2. Drawings and documentation required from technical experts are obtained within required timeframes and checked for completeness and compliance.
  3. Documentation for planning approval application is prepared, checked for compliance with requirements, and confirmed with client.
  4. Completeness of planning approval application is confirmed in consultation with architect or building designer and submitted to relevant authority according to workplace procedures.
  5. Notifications and advertisements are arranged as required.
Design drawings are checked for planning approval compliance and required additions or changes are made.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drawings and documentation required from technical experts are obtained within required timeframes and checked for completeness and compliance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation for planning approval application is prepared, checked for compliance with requirements, and confirmed with client.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Completeness of planning approval application is confirmed in consultation with architect or building designer and submitted to relevant authority according to workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notifications and advertisements are arranged as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain feedback and amend documentation as required.

  1. Local authority, client and stakeholder feedback to planning application design drawings and documentation is obtained and discussed with architect or building designer to identify required amendments.
  2. Design drawings and documentation are amended as required, and client approval is obtained, documented and processed according to workplace procedures.
Local authority, client and stakeholder feedback to planning application design drawings and documentation is obtained and discussed with architect or building designer to identify required amendments.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design drawings and documentation are amended as required, and client approval is obtained, documented and processed according to workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Support and finalise the application through approval process.

  1. Progress of application through planning approval processes is monitored and requests for information are responded to according to workplace procedures.
  2. Requirements for changes to planning approval drawings and documentation are completed on time and in consultation with architect or building designer as requested.
  3. Planning approval is obtained and filed with final design project documentation according to workplace procedures.
  4. Client is notified of planning approval and any conditions, and copies of relevant documentation are provided according to workplace procedures.
Progress of application through planning approval processes is monitored and requests for information are responded to according to workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Requirements for changes to planning approval drawings and documentation are completed on time and in consultation with architect or building designer as requested.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Planning approval is obtained and filed with final design project documentation according to workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Client is notified of planning approval and any conditions, and copies of relevant documentation are provided according to workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Plan and produce planning approval support documentation.

1.1.

Documentation requirements for planning approval applications are confirmed with relevant authorities.

1.2.

Design drawings required in applications for planning approval are confirmed with architect, building designer or relevant authorities.

1.3.

Compliance requirements for design drawings are confirmed with architect, building designer and relevant authorities.

1.4.

Timelines and methodologies for producing final design drawings are confirmed with architect or building designer.

1.5.

Drawings and documentation required from electrical, hydraulic, geotechnical, fire and mechanical engineers are specified and requested in consultation with architect or building designer.

1.6.

Drawings and documentation required from access, traffic, lighting, arborist, acoustic, energy efficiency and other relevant consultants are specified and requested in consultation with architect or building designer.

2.

Prepare and submit planning approval application.

2.1.

Design drawings are checked for planning approval compliance and required additions or changes are made.

2.2.

Drawings and documentation required from technical experts are obtained within required timeframes and checked for completeness and compliance.

2.3.

Documentation for planning approval application is prepared, checked for compliance with requirements, and confirmed with client.

2.4.

Completeness of planning approval application is confirmed in consultation with architect or building designer and submitted to relevant authority according to workplace procedures.

2.5.

Notifications and advertisements are arranged as required.

3.

Obtain feedback and amend documentation as required.

3.1.

Local authority, client and stakeholder feedback to planning application design drawings and documentation is obtained and discussed with architect or building designer to identify required amendments.

3.2.

Design drawings and documentation are amended as required, and client approval is obtained, documented and processed according to workplace procedures.

4.

Support and finalise the application through approval process.

4.1.

Progress of application through planning approval processes is monitored and requests for information are responded to according to workplace procedures.

4.2.

Requirements for changes to planning approval drawings and documentation are completed on time and in consultation with architect or building designer as requested.

4.3.

Planning approval is obtained and filed with final design project documentation according to workplace procedures.

4.4.

Client is notified of planning approval and any conditions, and copies of relevant documentation are provided according to workplace procedures.

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Plan and produce planning approval support documentation.

1.1.

Documentation requirements for planning approval applications are confirmed with relevant authorities.

1.2.

Design drawings required in applications for planning approval are confirmed with architect, building designer or relevant authorities.

1.3.

Compliance requirements for design drawings are confirmed with architect, building designer and relevant authorities.

1.4.

Timelines and methodologies for producing final design drawings are confirmed with architect or building designer.

1.5.

Drawings and documentation required from electrical, hydraulic, geotechnical, fire and mechanical engineers are specified and requested in consultation with architect or building designer.

1.6.

Drawings and documentation required from access, traffic, lighting, arborist, acoustic, energy efficiency and other relevant consultants are specified and requested in consultation with architect or building designer.

2.

Prepare and submit planning approval application.

2.1.

Design drawings are checked for planning approval compliance and required additions or changes are made.

2.2.

Drawings and documentation required from technical experts are obtained within required timeframes and checked for completeness and compliance.

2.3.

Documentation for planning approval application is prepared, checked for compliance with requirements, and confirmed with client.

2.4.

Completeness of planning approval application is confirmed in consultation with architect or building designer and submitted to relevant authority according to workplace procedures.

2.5.

Notifications and advertisements are arranged as required.

3.

Obtain feedback and amend documentation as required.

3.1.

Local authority, client and stakeholder feedback to planning application design drawings and documentation is obtained and discussed with architect or building designer to identify required amendments.

3.2.

Design drawings and documentation are amended as required, and client approval is obtained, documented and processed according to workplace procedures.

4.

Support and finalise the application through approval process.

4.1.

Progress of application through planning approval processes is monitored and requests for information are responded to according to workplace procedures.

4.2.

Requirements for changes to planning approval drawings and documentation are completed on time and in consultation with architect or building designer as requested.

4.3.

Planning approval is obtained and filed with final design project documentation according to workplace procedures.

4.4.

Client is notified of planning approval and any conditions, and copies of relevant documentation are provided according to workplace procedures.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Design drawings must include:

drawings produced by building designers or technical experts

elevations:

contour

demolition

floor

framing

roof

sections

shadow drawings

site analyses

landscape designs

services layout.

Compliance requirements must include:

current Australian standards applicable to the building design

federal, state or territory and local authority legislation and regulations applicable to the building design

National Construction Code.