Evidence Guide: CPPBDN5015 - Produce compliant client-approved working drawings for non-residential buildings

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPPBDN5015 - Produce compliant client-approved working drawings for non-residential buildings

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and administer working drawing production for small-scale commercial or industrial building design project.

  1. Working drawings required by construction contractors and for building approval applications are confirmed with nominated personnel.
  2. Compliance requirements to be addressed in working drawings are confirmed with nominated personnel.
  3. Timelines and methodologies for producing working drawings are established and followed.
  4. Drawings required from technical experts are specified, commissioned and obtained.
Working drawings required by construction contractors and for building approval applications are confirmed with nominated personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compliance requirements to be addressed in working drawings are confirmed with nominated personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timelines and methodologies for producing working drawings are established and followed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drawings required from technical experts are specified, commissioned and obtained.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare working drawings.

  1. Project design drawings and documentation are analysed and information required for working drawings is extracted.
  2. Construction details requiring clarification are resolved through research or consultation.
  3. Draft working drawings are prepared and notations added according to project and workplace requirements.
  4. Working drawingsare checked and finalised in consultation with colleagues or nominated personnel as required.
Project design drawings and documentation are analysed and information required for working drawings is extracted.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construction details requiring clarification are resolved through research or consultation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Draft working drawings are prepared and notations added according to project and workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Working drawingsare checked and finalised in consultation with colleagues or nominated personnel as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Submit and support building approval application.

  1. Documentation requirements for building approval applicationsare obtained from nominated personnel.
  2. Documentation for building approval application is prepared, checked for compliance with requirements, and confirmed with client.
  3. Progress of application through building approval process is monitored and requests for clarification or changes are addressed in consultation with client.
  4. Decision on building approval application is obtained and filed with final design project documentation according to workplace procedures.
  5. Client is notified of decision on building approval application and copies of documentation are provided.
Documentation requirements for building approval applicationsare obtained from nominated personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation for building approval application is prepared, checked for compliance with requirements, and confirmed with client.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Progress of application through building approval process is monitored and requests for clarification or changes are addressed in consultation with client.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Decision on building approval application is obtained and filed with final design project documentation according to workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Client is notified of decision on building approval application and copies of documentation are provided.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Plan and administer working drawing production for small-scale commercial or industrial building design project.

1.1.

Working drawings required by construction contractors and for building approval applications are confirmed with nominated personnel.

1.2.

Compliance requirements to be addressed in working drawings are confirmed with nominated personnel.

1.3.

Timelines and methodologies for producing working drawings are established and followed.

1.4.

Drawings required from technical experts are specified, commissioned and obtained.

2.

Prepare working drawings.

2.1.

Project design drawings and documentation are analysed and information required for working drawings is extracted.

2.2.

Construction details requiring clarification are resolved through research or consultation.

2.3.

Draft working drawings are prepared and notations added according to project and workplace requirements.

2.4.

Working drawingsare checked and finalised in consultation with colleagues or nominated personnel as required.

3.

Submit and support building approval application.

3.1.

Documentation requirements for building approval applicationsare obtained from nominated personnel.

3.2.

Documentation for building approval application is prepared, checked for compliance with requirements, and confirmed with client.

3.3.

Progress of application through building approval process is monitored and requests for clarification or changes are addressed in consultation with client.

3.4.

Decision on building approval application is obtained and filed with final design project documentation according to workplace procedures.

3.5.

Client is notified of decision on building approval application and copies of documentation are provided.

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Plan and administer working drawing production for small-scale commercial or industrial building design project.

1.1.

Working drawings required by construction contractors and for building approval applications are confirmed with nominated personnel.

1.2.

Compliance requirements to be addressed in working drawings are confirmed with nominated personnel.

1.3.

Timelines and methodologies for producing working drawings are established and followed.

1.4.

Drawings required from technical experts are specified, commissioned and obtained.

2.

Prepare working drawings.

2.1.

Project design drawings and documentation are analysed and information required for working drawings is extracted.

2.2.

Construction details requiring clarification are resolved through research or consultation.

2.3.

Draft working drawings are prepared and notations added according to project and workplace requirements.

2.4.

Working drawingsare checked and finalised in consultation with colleagues or nominated personnel as required.

3.

Submit and support building approval application.

3.1.

Documentation requirements for building approval applicationsare obtained from nominated personnel.

3.2.

Documentation for building approval application is prepared, checked for compliance with requirements, and confirmed with client.

3.3.

Progress of application through building approval process is monitored and requests for clarification or changes are addressed in consultation with client.

3.4.

Decision on building approval application is obtained and filed with final design project documentation according to workplace procedures.

3.5.

Client is notified of decision on building approval application and copies of documentation are provided.

A person demonstrating competency in this unit must satisfy the requirements of the elements, performance criteria, foundation skills and range of conditions of this unit.

The person must also prepare and organise complete and compliant sets of working drawings for three projects (except construction Type A buildings), each of a maximum area of 2000 square metres and involving different classes of commercial buildings as defined in the Building Code of Australia (BCA) section of the National Construction Code (NCC), consisting of:

one project incorporating Classes 2, 5, 6 and 7a

one project incorporating Class 3 or 9c (aged care facility)

one project incorporating Classes 7b and 8.

In doing the above, the person must:

confirm working drawing requirements for building approval application and contractors’ use

consult with technical experts to clarify details for working drawings, as required

use design tools to prepare and organise complete and compliant sets of working drawings according to project timeframes and local authority requirements

finalise building approval for a range of small-scale building design projects, including processing of final drawings and documentation, and notify clients.

A person demonstrating competency in this unit must demonstrate knowledge of:

structural engineering principles sufficient to interpret and apply the requirements of the NCC

principles of design, including sustainable design

building approval processes

building designers’ duty of care to ensure quality and safety of designs

types of construction materials and methods specified in designs for the above building design projects

implications of changes to designs, including compliance issues, costs and client satisfaction with outcomes

legislation, codes and standards, including drawing standards, that apply to small-scale building design projects specified in the performance evidence

organisational scope of business, service levels and fees relating to drawing process.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Working drawings must include:

area analyses

elevations

in situ concrete detailing

joinery details

location of neighbouring buildings

plans for:

ceilings

floor finishes

floors

footings

lighting

services

sites

projections

room details

sections

two and three-dimensional drawings and sketches.

Nominated personnel must include:

construction contractors and subcontractors

representatives from:

local council departments

federal, state or territory government departments

regulatory authorities in country of project location.

Compliance requirements must include:

Australian standards, including standards for drawings

National Construction Code (NCC)

legislation, regulations and by-laws.

Technical expertsmust include at least one of the following:

construction contractor

landscape designer

service contractor

structural engineer

surveyor.

Working drawingsmust be checked for:

accuracy

completeness

compliance with requirements, including building approval requirements

consistency of presentation

cross-referencing

titles and reference numbers

version control.

Documentation requirements for building approval applications must include:

contract administration documentation

reports, such as:

access

conservation

energy rating

fire safety

soil analysis

plans for:

demolition

cut and fill

excavation

risk assessments

working drawings.