Evidence Guide: CPPBDN8001 - Research and evaluate construction materials and methods for complex building design projects

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPPBDN8001 - Research and evaluate construction materials and methods for complex building design projects

What evidence can you provide to prove your understanding of each of the following citeria?

Determine parameters for the building design project.

  1. Client is consulted to determine key business requirements of proposed project that will impact on building materials and methods.
  2. Size, breadth and complexity of the building project and the impact on building materials and methods are discussed and clarified with client and with planning authorities.
  3. Impact of building site characteristics on potential materials and methods of construction is discussed and clarified with client, planning authorities and other project professionals.
Client is consulted to determine key business requirements of proposed project that will impact on building materials and methods.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Size, breadth and complexity of the building project and the impact on building materials and methods are discussed and clarified with client and with planning authorities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Impact of building site characteristics on potential materials and methods of construction is discussed and clarified with client, planning authorities and other project professionals.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Research alternative solutions.

  1. BCA requirements for use of alternative and deemed-to-satisfy (DTS) solutions are researched and evaluated in relation to the development of design options for project.
  2. Benefits and options for the use of alternative solutions in the development of designs are researched and evaluated.
  3. Comparative analysis is undertaken of alternative and DTS design solutions.
BCA requirements for use of alternative and deemed-to-satisfy (DTS) solutions are researched and evaluated in relation to the development of design options for project.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Benefits and options for the use of alternative solutions in the development of designs are researched and evaluated.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Comparative analysis is undertaken of alternative and DTS design solutions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Research materials and methods for structural elements.

  1. Characteristics and applications of materials used for structural elements are researched and evaluated in relation to type of large and complex project.
  2. Compliance requirements for materials used for structural elements are researched and interpreted.
  3. Construction methods and systems for structural elements are researched and evaluated in relation to types of materials and methods for large and complex building design project.
  4. Research is recorded, filed and regularly updated according to workplace procedures.
Characteristics and applications of materials used for structural elements are researched and evaluated in relation to type of large and complex project.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compliance requirements for materials used for structural elements are researched and interpreted.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construction methods and systems for structural elements are researched and evaluated in relation to types of materials and methods for large and complex building design project.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Research is recorded, filed and regularly updated according to workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Research materials and methods for enclosures.

  1. Characteristics and applications of materials used for enclosures are researched and evaluated.
  2. Compliance requirements for materials used for enclosuresare researched and interpreted for type of large and complex building design project.
  3. Construction methods and systems for enclosures are researched and evaluated.
  4. Research is recorded, filed and regularly updated according to workplace procedures.
Characteristics and applications of materials used for enclosures are researched and evaluated.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compliance requirements for materials used for enclosuresare researched and interpreted for type of large and complex building design project.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construction methods and systems for enclosures are researched and evaluated.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Research is recorded, filed and regularly updated according to workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Research systems and components for services.

  1. Components and systems for services are researched and evaluated.
  2. Broad compliance requirements for services are researched and interpreted for different types of large and complex building design projects.
  3. Installation methods for services are researched in relation to different types of components, systems and design projects.
  4. Research is recorded, filed and regularly updated according to workplace procedures.
Components and systems for services are researched and evaluated.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Broad compliance requirements for services are researched and interpreted for different types of large and complex building design projects.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation methods for services are researched in relation to different types of components, systems and design projects.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Research is recorded, filed and regularly updated according to workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Determine parameters for the building design project.

1.1.

Client is consulted to determine key business requirements of proposed project that will impact on building materials and methods.

1.2.

Size, breadth and complexity of the building project and the impact on building materials and methods are discussed and clarified with client and with planning authorities.

1.3.

Impact of building site characteristics on potential materials and methods of construction is discussed and clarified with client, planning authorities and other project professionals.

2.

Research alternative solutions.

2.1.

BCA requirements for use of alternative and deemed-to-satisfy (DTS) solutions are researched and evaluated in relation to the development of design options for project.

2.2.

Benefits and options for the use of alternative solutions in the development of designs are researched and evaluated.

2.3.

Comparative analysis is undertaken of alternative and DTS design solutions.

3.

Research materials and methods for structural elements.

3.1.

Characteristics and applications of materials used for structural elements are researched and evaluated in relation to type of large and complex project.

3.2.

Compliance requirements for materials used for structural elements are researched and interpreted.

3.3.

Construction methods and systems for structural elements are researched and evaluated in relation to types of materials and methods for large and complex building design project.

3.4.

Research is recorded, filed and regularly updated according to workplace procedures.

4.

Research materials and methods for enclosures.

4.1.

Characteristics and applications of materials used for enclosures are researched and evaluated.

4.2.

Compliance requirements for materials used for enclosuresare researched and interpreted for type of large and complex building design project.

4.3.

Construction methods and systems for enclosures are researched and evaluated.

4.4.

Research is recorded, filed and regularly updated according to workplace procedures.

5.

Research systems and components for services.

5.1.

Components and systems for services are researched and evaluated.

5.2.

Broad compliance requirements for services are researched and interpreted for different types of large and complex building design projects.

5.3.

Installation methods for services are researched in relation to different types of components, systems and design projects.

5.4.

Research is recorded, filed and regularly updated according to workplace procedures.

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Determine parameters for the building design project.

1.1.

Client is consulted to determine key business requirements of proposed project that will impact on building materials and methods.

1.2.

Size, breadth and complexity of the building project and the impact on building materials and methods are discussed and clarified with client and with planning authorities.

1.3.

Impact of building site characteristics on potential materials and methods of construction is discussed and clarified with client, planning authorities and other project professionals.

2.

Research alternative solutions.

2.1.

BCA requirements for use of alternative and deemed-to-satisfy (DTS) solutions are researched and evaluated in relation to the development of design options for project.

2.2.

Benefits and options for the use of alternative solutions in the development of designs are researched and evaluated.

2.3.

Comparative analysis is undertaken of alternative and DTS design solutions.

3.

Research materials and methods for structural elements.

3.1.

Characteristics and applications of materials used for structural elements are researched and evaluated in relation to type of large and complex project.

3.2.

Compliance requirements for materials used for structural elements are researched and interpreted.

3.3.

Construction methods and systems for structural elements are researched and evaluated in relation to types of materials and methods for large and complex building design project.

3.4.

Research is recorded, filed and regularly updated according to workplace procedures.

4.

Research materials and methods for enclosures.

4.1.

Characteristics and applications of materials used for enclosures are researched and evaluated.

4.2.

Compliance requirements for materials used for enclosuresare researched and interpreted for type of large and complex building design project.

4.3.

Construction methods and systems for enclosures are researched and evaluated.

4.4.

Research is recorded, filed and regularly updated according to workplace procedures.

5.

Research systems and components for services.

5.1.

Components and systems for services are researched and evaluated.

5.2.

Broad compliance requirements for services are researched and interpreted for different types of large and complex building design projects.

5.3.

Installation methods for services are researched in relation to different types of components, systems and design projects.

5.4.

Research is recorded, filed and regularly updated according to workplace procedures.

A person demonstrating competency in this unit must satisfy the requirements of the elements, performance criteria, foundation skills and range of conditions of this unit.

The person must also develop a body of current research findings suitable for application to:

one building design project of three storeys or more for a Class 2, 3 or 9 building

one building design project of four storeys or more for a Class 5, 6, 7 or 8 building.

In doing the above, the person must:

evaluate characteristics and applications of materials for structural elements and building envelope

evaluate construction methods and systems applicable to structural elements and building envelope

evaluate components and systems for building services

systematically document and store research findings.

A person demonstrating competency in this unit must demonstrate knowledge of:

compliance requirements relating to construction materials and methods for the projects specified in the performance evidence, including:

Australian standards

National Construction Code (NCC) deemed-to-satisfy (DTS) requirements for construction Type A buildings

NCC alternative solution requirements for construction Type A buildings

Building Acts

environmental and sustainability requirements, including:

Australian standards

techniques for carbon dioxide reduction, including specification of materials, glue and paint

energy efficiency

fire resistance levels

legislation

town planning and other planning body requirements

hazards of construction materials and methods

planning authority compliance requirements for the use of building materials and methods relating to large and complex buildings and including alternative solutions

organisational scope of business and client demographics, including:

geographic areas of operation

trends in client design preferences

types of building design projects that form the core business of the organisation

sources of reliable information on past, current and emerging uses of construction materials and methods

sustainable construction materials and methods.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Key business requirements of project must include:

characteristics and needs of occupants of proposed building

cost constraints

purpose for building development project, including whether the usage (classification) of the building is to be changed

timeframe for project commencement and completion.

Other project professionals must include at least three of the following:

access consultant

acoustics engineer or professional

bushfire management professional

construction contractor

civil engineer

energy efficiency expert

fire systems designer or engineer

hydraulic engineer

landscape designer

lighting specialist

mechanical services engineer

work health and safety (WHS) expert

plumbing and drainage professional

quantity surveyor

service contractor

soil testing or geo-technical engineer or expert

structural engineer

surveyor.

Characteristics of materials must include:

acoustic properties

aesthetic properties

availability

carbon dioxide reduction, including materials, glues and paints

cost

defects

durability

fire resistance properties

green roofs

health and safety issues

interaction with other materials

limitations due to manufacturing process

structural safety

sustainability features, such as energy efficiency

thermal properties

tolerance

transport, storage and handling requirements.

Applications of materials used for structural elements must include:

aesthetic properties

coatings required

compatibility with other elements

fixings required

structural application

substructural application

use in specific construction methods or systems.

Compliance requirements must include:

Australian standards

legislation

NCC

performance requirements specified by client

quality standards specified by client.

Materials used for structural elements must include:

bricks

clay

composite materials

concrete

glass

masonry

metals

new and emerging materials

stone

tilt up concrete panels

timber and timber products.

Structural elements must include:

footings, including:

concrete pad

piles

post and concrete

strip

floors, including:

bearers and joists

pier and beam

slabs, including:

raft

suspended

waffle

walls, including:

concrete

frame

post and beam

solid masonry

roofs, including:

conventional

truss.

Applications of materials used for enclosures must include:

cladding

flashing

lining

roofing

waterproofing.

Materials used for enclosures must include:

composite materials

new and emerging materials

plaster and plasterboard

slate

terracotta

timber and timber products.

Services must include:

electricity

fire suppression

gas

heating, ventilation and air conditioning (HVAC)

telecommunications

water.