The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to perform precision survey.
|
|
Task objectives are defined. Completed |
Evidence:
|
Skills and knowledge are updated to accommodate changes in design and set out survey. Completed |
Evidence:
|
Set up precise levelling and reduce the results of a precise levelling run.
|
|
Pertinent standards are identified, considered and adhered to according to precision surveyingproject specifications. Completed |
Evidence:
|
Organisational documented and undocumented practices are adhered to. Completed |
Evidence:
|
OHS requirements are planned for and adhered to. Completed |
Evidence:
|
Constructional features of the equipment and thespecialised attachments necessary to achieve the requirements of precise levelling are determined. Completed |
Evidence:
|
Accuracy specifications as set out in the survey precision instructions or the manufacturer specifications for tolerances relevant to precise levelling are determined. Completed |
Evidence:
|
Precise levelling run of an accuracy consistent with the current relevant accuracy standard is carried out and results are calculated and recorded according to organisational guidelines. Completed |
Evidence:
|
Apply specialised techniques used for precise setting out and industrial surveys.
|
|
Applications of specialised surveying techniques used for precise setting out and optical tooling are determined. Completed |
Evidence:
|
Applications of specialised instruments and instrument attachments used for precise setting out are determined. Completed |
Evidence:
|
Remote measuring systems to be used in the industrial measurement are determined. Completed |
Evidence:
|
Set out and observations using instruments and attachments suitable for precise setting out are conducted. Completed |
Evidence:
|
Detect and monitor deflection and deformation of structures.
|
|
Survey methods used to check horizontal movement of engineering structures and instruments used to monitor verticality of tall structures are determined. Completed |
Evidence:
|
Survey methods used to check vertical movement due to settlement of engineering structures caused by tunnelling and mining are determined. Completed |
Evidence:
|
Precision survey of an accuracy that will detect and monitor deformation or deflection of an engineering structure is carried out. Completed |
Evidence:
|
Document results.
|
|
Results of the survey are presented to relevant personnel according to organisational guidelines. Completed |
Evidence:
|
Required documentation is completed promptly, accurately and according to organisational guidelines. Completed |
Evidence:
|
Spatial data is archived according to project specifications. Completed |
Evidence:
|