Evidence Guide: CPPSIS5044 - Develop subdivision survey designs for local government approval

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPPSIS5044 - Develop subdivision survey designs for local government approval

What evidence can you provide to prove your understanding of each of the following citeria?

Identify type of service requests.

  1. Client requirements and timelines are established in consultation with appropriate persons.
  2. Client service requirements are assessed to establish if they are within the jurisdiction and ability of relevant authority and any necessity for statutory compliance.
  3. Work is prioritised and recorded, and research is conducted to gather additional information as required according to organisational requirements.
Client requirements and timelines are established in consultation with appropriate persons.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Client service requirements are assessed to establish if they are within the jurisdiction and ability of relevant authority and any necessity for statutory compliance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is prioritised and recorded, and research is conducted to gather additional information as required according to organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct subdivision survey.

  1. Surveying equipment is set up, calibrated and used according to manufacturer specifications and organisational requirements.
  2. Identified components of land to be subdivided are measured and subdivision lots marked according to client service and organisational requirements.
  3. Measured surveying data is reduced according to organisational requirements.
  4. Measurements are validated and recorded according to organisational requirements.
  5. Problems are identified and resolved, and contingencies managed according to organisational requirements.
Surveying equipment is set up, calibrated and used according to manufacturer specifications and organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identified components of land to be subdivided are measured and subdivision lots marked according to client service and organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measured surveying data is reduced according to organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measurements are validated and recorded according to organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Problems are identified and resolved, and contingencies managed according to organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop detailed design submission for local government approval.

  1. Surveying data is used to develop plan according to client service and organisational requirements.
  2. Appropriate persons are consulted to obtain professional advice for input into subdivision submission.
  3. Availability of existing services and costs of supply, including local government and utility authority contributions, are determined.
  4. Engineering aspects in subdivision design are considered and documented according to local government requirements.
  5. Subdivision submission is prepared to incorporate physical constraints and environmental impact of the development according to client service requirements.
Surveying data is used to develop plan according to client service and organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate persons are consulted to obtain professional advice for input into subdivision submission.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Availability of existing services and costs of supply, including local government and utility authority contributions, are determined.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Engineering aspects in subdivision design are considered and documented according to local government requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Subdivision submission is prepared to incorporate physical constraints and environmental impact of the development according to client service requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor approval process.

  1. Local government approval assessment criteria are further examined and advertising and exhibition requirements observed according to organisational requirements.
  2. Outcomes of subdivision submission are reviewed to identify required follow-up actions.
Local government approval assessment criteria are further examined and advertising and exhibition requirements observed according to organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Outcomes of subdivision submission are reviewed to identify required follow-up actions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Advise client of outcomes.

  1. Client is advised of submission outcomes in writing and verbally according to organisational requirements.
  2. Rights of appeal are explained to client where appropriate, and advice is recorded according to organisational requirements.
  3. Documentation is completed and records stored according to organisational requirements.
Client is advised of submission outcomes in writing and verbally according to organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rights of appeal are explained to client where appropriate, and advice is recorded according to organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is completed and records stored according to organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Identify type of service requests.

1.1.

Client requirements and timelines are established in consultation with appropriate persons.

1.2.

Client service requirements are assessed to establish if they are within the jurisdiction and ability of relevant authority and any necessity for statutory compliance.

1.3.

Work is prioritised and recorded, and research is conducted to gather additional information as required according to organisational requirements.

2.

Conduct subdivision survey.

2.1.

Surveying equipment is set up, calibrated and used according to manufacturer specifications and organisational requirements.

2.2.

Identified components of land to be subdivided are measured and subdivision lots marked according to client service and organisational requirements.

2.3.

Measured surveying data is reduced according to organisational requirements.

2.4.

Measurements are validated and recorded according to organisational requirements.

2.5.

Problems are identified and resolved, and contingencies managed according to organisational requirements.

3.

Develop detailed design submission for local government approval.

3.1.

Surveying data is used to develop plan according to client service and organisational requirements.

3.2.

Appropriate persons are consulted to obtain professional advice for input into subdivision submission.

3.3.

Availability of existing services and costs of supply, including local government and utility authority contributions, are determined.

3.4.

Engineering aspects in subdivision design are considered and documented according to local government requirements.

3.5.

Subdivision submission is prepared to incorporate physical constraints and environmental impact of the development according to client service requirements.

4.

Monitor approval process.

4.1.

Local government approval assessment criteria are further examined and advertising and exhibition requirements observed according to organisational requirements.

4.2.

Outcomes of subdivision submission are reviewed to identify required follow-up actions.

5.

Advise client of outcomes.

5.1.

Client is advised of submission outcomes in writing and verbally according to organisational requirements.

5.2.

Rights of appeal are explained to client where appropriate, and advice is recorded according to organisational requirements.

5.3.

Documentation is completed and records stored according to organisational requirements.

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Identify type of service requests.

1.1.

Client requirements and timelines are established in consultation with appropriate persons.

1.2.

Client service requirements are assessed to establish if they are within the jurisdiction and ability of relevant authority and any necessity for statutory compliance.

1.3.

Work is prioritised and recorded, and research is conducted to gather additional information as required according to organisational requirements.

2.

Conduct subdivision survey.

2.1.

Surveying equipment is set up, calibrated and used according to manufacturer specifications and organisational requirements.

2.2.

Identified components of land to be subdivided are measured and subdivision lots marked according to client service and organisational requirements.

2.3.

Measured surveying data is reduced according to organisational requirements.

2.4.

Measurements are validated and recorded according to organisational requirements.

2.5.

Problems are identified and resolved, and contingencies managed according to organisational requirements.

3.

Develop detailed design submission for local government approval.

3.1.

Surveying data is used to develop plan according to client service and organisational requirements.

3.2.

Appropriate persons are consulted to obtain professional advice for input into subdivision submission.

3.3.

Availability of existing services and costs of supply, including local government and utility authority contributions, are determined.

3.4.

Engineering aspects in subdivision design are considered and documented according to local government requirements.

3.5.

Subdivision submission is prepared to incorporate physical constraints and environmental impact of the development according to client service requirements.

4.

Monitor approval process.

4.1.

Local government approval assessment criteria are further examined and advertising and exhibition requirements observed according to organisational requirements.

4.2.

Outcomes of subdivision submission are reviewed to identify required follow-up actions.

5.

Advise client of outcomes.

5.1.

Client is advised of submission outcomes in writing and verbally according to organisational requirements.

5.2.

Rights of appeal are explained to client where appropriate, and advice is recorded according to organisational requirements.

5.3.

Documentation is completed and records stored according to organisational requirements.

A person demonstrating competency in this unit must satisfy the requirements of the elements, performance criteria, foundation skills and range of conditions of this unit. The person must also develop a subdivision survey design for local government approval in response to two different client requests.

While developing the above subdivision survey designs, the person must:

analyse existing plans, drawings, surveying data and photographs to plan service provision

conduct research to obtain information relating to planned subdivisions, including:

boundary dimensions

connections

land title information

local government provisions and restrictions relating to subdivision, zoning, heritage and flooding

services

subdivision plan

title search

topographic features

accurately measure and calculate boundary dimensions and mark subdivision lots

use industry-accepted methods to check and validate measurements and calculations

analyse and comply with land and planning law and local government guidelines for building approvals

communicate clearly with appropriate persons in writing and verbally, to obtain information, clarify service and survey detail, and explain and report submission processes and outcomes

comply with organisational requirements relating to:

completing records and documentation, including field notes

prioritising service requests

recording, storing and filing surveying data

using surveying equipment

working safely and using personal protective equipment (PPE)

comply with relevant legal and statutory requirements and standards to ensure accuracy of survey, field procedures, and submission information

determine availability of existing services and costs of supply

determine survey controls, land dimensions and corners, and locate features, boundaries, surrounds, connections and offsets

identify physical constraints and environmental impacts of planned developments, including those relating to three of the following:

drainage

easements

public reserves

sediment control

sewerage control

monitor local government approval process, including observing advertising and exhibition requirements

perform surveying tasks using one of the following surveying equipment:

global navigation satellite system (GNSS)

total station

prepare clear and concise subdivision survey design submission, with plans that comply with local government approval assessment criteria

use surveying data and other relevant information to produce plans, including contours.

A person demonstrating competency in this unit must demonstrate knowledge of:

accuracy and precision requirements for cadastral surveying data and subdivision survey design

aspects of land and planning law impacting on surveying tasks, including:

common law and old system title

community title

crown land, alienation and native title

environmental protection

residential subdivision provisions

set-back requirements

strata title

Torrens title system

data capture and set-out methodologies used in surveying

data reduction techniques

industry-accepted methods for validating data to identify errors and discrepancies

industry-accepted standards relating to subdivision survey design

land tenure systems appropriate to relevant jurisdiction

legislative, statutory and industry requirements and standards relating to:

cadastral surveying

local government building requirements

methods for determining availability of existing services and costs of supply

methods for setting up and calibrating surveying equipment

organisational policies and procedures relating to:

completing records and documentation

health and safety when using the surveying equipment specified in the performance evidence

prioritising service requests

recording, storing and filing data

possible community issues and repercussions relating to building permits

reference and coordinate systems for surveying data, including Australian Height Datum and Map Grid of Australia

local government approval and submission processes relating to subdivision survey design

road alignment design and associated computations.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Appropriate persons must include at least two of the following:

builder

client

colleague

engineer

local government representative

manager

registered or qualified surveyor

statutory authority representative

town planner.