Evidence Guide: CPPWMT4056 - Implement landfill rehabilitation plans

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPPWMT4056 - Implement landfill rehabilitation plans

What evidence can you provide to prove your understanding of each of the following citeria?

Organise site rehabilitation.

  1. Environmental management and site development plans are reviewed to identify rehabilitation requirements.
  2. Hazards and risks are identified and managed, or reported according to organisational and compliance requirements.
  3. Supervisory processes, checks and measures are implemented to ensure work is completed within time available.
  4. Required plant, equipment, tools and materials are identified and accessed according to organisational requirements.
  5. Safety barriers and signage are erected at work site to ensure safety of surrounding personnel and public, according to organisational requirements and compliance requirements.
Environmental management and site development plans are reviewed to identify rehabilitation requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards and risks are identified and managed, or reported according to organisational and compliance requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervisory processes, checks and measures are implemented to ensure work is completed within time available.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required plant, equipment, tools and materials are identified and accessed according to organisational requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety barriers and signage are erected at work site to ensure safety of surrounding personnel and public, according to organisational requirements and compliance requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recontour rehabilitation area.

  1. Area is recontoured so that it blends into surrounding environment or conforms to rehabilitation plan according to organisational and compliance requirements.
  2. Dust is minimised using approved earthmoving techniques according to organisational and compliance requirements.
  3. Final landform is checked to ensure it replicates surrounding environment and conforms to rehabilitation requirements.
  4. Catchment construction is determined by site and weather conditions according to rehabilitation requirements.
Area is recontoured so that it blends into surrounding environment or conforms to rehabilitation plan according to organisational and compliance requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dust is minimised using approved earthmoving techniques according to organisational and compliance requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final landform is checked to ensure it replicates surrounding environment and conforms to rehabilitation requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Catchment construction is determined by site and weather conditions according to rehabilitation requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Profile soil.

  1. Soil profile is constructed to stabilise contamination of materials, soil and surrounding areas according to rehabilitation requirements.
  2. Materials for sub-soil are selected and used, taking vegetation requirements into account according to rehabilitation requirements
  3. Construction of soil profile horizon is checked to ensure it emulates surrounding environment and conforms to rehabilitation requirements.
  4. Landform construction is checked for completion prior to final soil layer placement according to rehabilitation requirements.
  5. Soil horizon construction is checked to ensure it follows land contour to reduce water flow down slope and increase water storage capabilities.
  6. Nutrients are added to soil according to rehabilitation plan and compliance requirements.
Soil profile is constructed to stabilise contamination of materials, soil and surrounding areas according to rehabilitation requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials for sub-soil are selected and used, taking vegetation requirements into account according to rehabilitation requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construction of soil profile horizon is checked to ensure it emulates surrounding environment and conforms to rehabilitation requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Landform construction is checked for completion prior to final soil layer placement according to rehabilitation requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Soil horizon construction is checked to ensure it follows land contour to reduce water flow down slope and increase water storage capabilities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Nutrients are added to soil according to rehabilitation plan and compliance requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct drains and berms.

  1. Drain and berm locations are pegged and constructed in appropriate locations and angles to ensure control of water flow, according to rehabilitation requirements.
  2. Drain mechanisms are placed at required dimensions and appropriate catchment locations are provided for sediment according to rehabilitation requirements.
  3. Erosion is controlled by placing appropriate drain mechanisms to reduce water flow speed according to rehabilitation requirements.
  4. Erosion is reduced by placing berms at intervals according to rehabilitation requirements.
Drain and berm locations are pegged and constructed in appropriate locations and angles to ensure control of water flow, according to rehabilitation requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drain mechanisms are placed at required dimensions and appropriate catchment locations are provided for sediment according to rehabilitation requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erosion is controlled by placing appropriate drain mechanisms to reduce water flow speed according to rehabilitation requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erosion is reduced by placing berms at intervals according to rehabilitation requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plant flora.

  1. Seeds, ground covering, plants and trees are planted, protected and maintained according to planting specifications.
  2. Fertiliser is applied according to plant type, soil quality, manufacturer specifications and rehabilitation requirements.
  3. Planting arrangement is checked to ensure it conforms to site contour and pattern specification according to rehabilitation requirements.
Seeds, ground covering, plants and trees are planted, protected and maintained according to planting specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fertiliser is applied according to plant type, soil quality, manufacturer specifications and rehabilitation requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Planting arrangement is checked to ensure it conforms to site contour and pattern specification according to rehabilitation requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise rehabilitation activities.

  1. Landfill site rehabilitation activities are recorded according to organisational and compliance requirements.
Landfill site rehabilitation activities are recorded according to organisational and compliance requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Organise site rehabilitation.

1.1.

Environmental management and site development plans are reviewed to identify rehabilitation requirements.

1.2.

Hazards and risks are identified and managed, or reported according to organisational and compliance requirements.

1.3.

Supervisory processes, checks and measures are implemented to ensure work is completed within time available.

1.4.

Required plant, equipment, tools and materials are identified and accessed according to organisational requirements.

1.5.

Safety barriers and signage are erected at work site to ensure safety of surrounding personnel and public, according to organisational requirements and compliance requirements.

2.

Recontour rehabilitation area.

2.1.

Area is recontoured so that it blends into surrounding environment or conforms to rehabilitation plan according to organisational and compliance requirements.

2.2.

Dust is minimised using approved earthmoving techniques according to organisational and compliance requirements.

2.3.

Final landform is checked to ensure it replicates surrounding environment and conforms to rehabilitation requirements.

2.4.

Catchment construction is determined by site and weather conditions according to rehabilitation requirements.

3.

Profile soil.

3.1.

Soil profile is constructed to stabilise contamination of materials, soil and surrounding areas according to rehabilitation requirements.

3.2.

Materials for sub-soil are selected and used, taking vegetation requirements into account according to rehabilitation requirements

3.3.

Construction of soil profile horizon is checked to ensure it emulates surrounding environment and conforms to rehabilitation requirements.

3.4.

Landform construction is checked for completion prior to final soil layer placement according to rehabilitation requirements.

3.5.

Soil horizon construction is checked to ensure it follows land contour to reduce water flow down slope and increase water storage capabilities.

3.6.

Nutrients are added to soil according to rehabilitation plan and compliance requirements.

4.

Construct drains and berms.

4.1.

Drain and berm locations are pegged and constructed in appropriate locations and angles to ensure control of water flow, according to rehabilitation requirements.

4.2.

Drain mechanisms are placed at required dimensions and appropriate catchment locations are provided for sediment according to rehabilitation requirements.

4.3.

Erosion is controlled by placing appropriate drain mechanisms to reduce water flow speed according to rehabilitation requirements.

4.4.

Erosion is reduced by placing berms at intervals according to rehabilitation requirements.

5.

Plant flora.

5.1.

Seeds, ground covering, plants and trees are planted, protected and maintained according to planting specifications.

5.2.

Fertiliser is applied according to plant type, soil quality, manufacturer specifications and rehabilitation requirements.

5.3.

Planting arrangement is checked to ensure it conforms to site contour and pattern specification according to rehabilitation requirements.

6.

Finalise rehabilitation activities.

6.1.

Landfill site rehabilitation activities are recorded according to organisational and compliance requirements.

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Organise site rehabilitation.

1.1.

Environmental management and site development plans are reviewed to identify rehabilitation requirements.

1.2.

Hazards and risks are identified and managed, or reported according to organisational and compliance requirements.

1.3.

Supervisory processes, checks and measures are implemented to ensure work is completed within time available.

1.4.

Required plant, equipment, tools and materials are identified and accessed according to organisational requirements.

1.5.

Safety barriers and signage are erected at work site to ensure safety of surrounding personnel and public, according to organisational requirements and compliance requirements.

2.

Recontour rehabilitation area.

2.1.

Area is recontoured so that it blends into surrounding environment or conforms to rehabilitation plan according to organisational and compliance requirements.

2.2.

Dust is minimised using approved earthmoving techniques according to organisational and compliance requirements.

2.3.

Final landform is checked to ensure it replicates surrounding environment and conforms to rehabilitation requirements.

2.4.

Catchment construction is determined by site and weather conditions according to rehabilitation requirements.

3.

Profile soil.

3.1.

Soil profile is constructed to stabilise contamination of materials, soil and surrounding areas according to rehabilitation requirements.

3.2.

Materials for sub-soil are selected and used, taking vegetation requirements into account according to rehabilitation requirements

3.3.

Construction of soil profile horizon is checked to ensure it emulates surrounding environment and conforms to rehabilitation requirements.

3.4.

Landform construction is checked for completion prior to final soil layer placement according to rehabilitation requirements.

3.5.

Soil horizon construction is checked to ensure it follows land contour to reduce water flow down slope and increase water storage capabilities.

3.6.

Nutrients are added to soil according to rehabilitation plan and compliance requirements.

4.

Construct drains and berms.

4.1.

Drain and berm locations are pegged and constructed in appropriate locations and angles to ensure control of water flow, according to rehabilitation requirements.

4.2.

Drain mechanisms are placed at required dimensions and appropriate catchment locations are provided for sediment according to rehabilitation requirements.

4.3.

Erosion is controlled by placing appropriate drain mechanisms to reduce water flow speed according to rehabilitation requirements.

4.4.

Erosion is reduced by placing berms at intervals according to rehabilitation requirements.

5.

Plant flora.

5.1.

Seeds, ground covering, plants and trees are planted, protected and maintained according to planting specifications.

5.2.

Fertiliser is applied according to plant type, soil quality, manufacturer specifications and rehabilitation requirements.

5.3.

Planting arrangement is checked to ensure it conforms to site contour and pattern specification according to rehabilitation requirements.

6.

Finalise rehabilitation activities.

6.1.

Landfill site rehabilitation activities are recorded according to organisational and compliance requirements.

A person demonstrating competency in this unit must satisfy the requirements of the elements, performance criteria, foundation skills and range of conditions of this unit.

The person must also implement two landfill rehabilitation plans.

For each plan, the person must:

identify rehabilitation work requirements, including:

work site specifications and timeframes

potential hazards and risks

required supervisory processes and checks

plant, equipment, tools and materials required for work

commence, monitor and direct the landfill rehabilitation work to comply with rehabilitation plan, organisational and legal and regulatory requirements

recontour the rehabilitation area so that it blends into the surrounding environment and dust is minimised and the catchment construction is appropriate for the site

profile soil to stabilise contamination and ensure it follows contours which reduce water flow down the slope and increase water storage capabilities

construct drains and berms which control and reduce erosion

plant flora using gardening methods in an arrangement that conforms to the contour of the site and pattern specifications as detailed in the rehabilitation plan.

A person demonstrating competency in this unit must demonstrate knowledge of:

environmental issues relating to:

life cycle of products: reduce, reuse and recycle

environmental regulations

renewable energy

gardening methods, including:

flora, soil and nutrient requirements

draining methods

seed and plant varieties

seed and plant planting methods

watering principles

soil dynamics

fertiliser characteristics and application methods

methods for interpreting ground conditions for:

dumping techniques

pushing techniques

mixing and applying fertiliser

planting seedlings by machine and hand

watering

waste containment methods

waste disposal and recovery methods

waste non-conformances

waste resource recovery and management options

waste types, streams and characteristics.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Compliance requirements must include:

commonwealth, state and territory legislation relating to rehabilitating landfill sites, including:

environmental protection

hazardous substances and dangerous goods

client confidentiality and privacy

industry codes

work health and safety

licensing requirements.