Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CUASTA302 - Install staging elements

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install staging elements

  1. Confirm staging installation requirements in consultation with relevant personnel and with reference to stage plans and other documentation
  2. Take account of bump-in schedule when preparing venue and applying stage plans to venue layout
  3. Where there is an existing stage, communicate modifications clearly to relevant personnel and implement as required
  4. Install equipment and necessary structures in consultation with relevant personnel
  5. Comply with safety guidelines and licensing requirements when pre-rigging equipment
Confirm staging installation requirements in consultation with relevant personnel and with reference to stage plans and other documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take account of bump-in schedule when preparing venue and applying stage plans to venue layout

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Where there is an existing stage, communicate modifications clearly to relevant personnel and implement as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install equipment and necessary structures in consultation with relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Comply with safety guidelines and licensing requirements when pre-rigging equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete staging installation tasks

  1. Mark out ground plans on stage according to design specifications and venue requirements
  2. Install staging elements according to production requirements and in the agreed sequence
  3. Follow safe work practices at all times and comply with equipment manufacturer instructions during the installation process
  4. Use appropriate equipment to assist with staging installation
  5. Complete work tasks within production or event deadlines
Mark out ground plans on stage according to design specifications and venue requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install staging elements according to production requirements and in the agreed sequence

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Follow safe work practices at all times and comply with equipment manufacturer instructions during the installation process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use appropriate equipment to assist with staging installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work tasks within production or event deadlines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check staging elements after installation

  1. Check each staging element to ensure operational standards for performance are achieved and that all safety requirements have been met
  2. Identify problems with staging elements, take appropriate action to rectify or refer to relevant personnel for action
  3. Identify modifications required to improve suitability for performance and take appropriate action
  4. Complete and distribute workplace documentation as required
Check each staging element to ensure operational standards for performance are achieved and that all safety requirements have been met

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify problems with staging elements, take appropriate action to rectify or refer to relevant personnel for action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify modifications required to improve suitability for performance and take appropriate action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and distribute workplace documentation as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to install staging elements

1.1 Confirm staging installation requirements in consultation with relevant personnel and with reference to stage plans and other documentation

1.2 Take account of bump-in schedule when preparing venue and applying stage plans to venue layout

1.3 Where there is an existing stage, communicate modifications clearly to relevant personnel and implement as required

1.4 Install equipment and necessary structures in consultation with relevant personnel

1.5 Comply with safety guidelines and licensing requirements when pre-rigging equipment

2. Complete staging installation tasks

2.1 Mark out ground plans on stage according to design specifications and venue requirements

2.2 Install staging elements according to production requirements and in the agreed sequence

2.3 Follow safe work practices at all times and comply with equipment manufacturer instructions during the installation process

2.4 Use appropriate equipment to assist with staging installation

2.5 Complete work tasks within production or event deadlines

3. Check staging elements after installation

3.1 Check each staging element to ensure operational standards for performance are achieved and that all safety requirements have been met

3.2 Identify problems with staging elements, take appropriate action to rectify or refer to relevant personnel for action

3.3 Identify modifications required to improve suitability for performance and take appropriate action

3.4 Complete and distribute workplace documentation as required

Required Skills and Knowledge

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to install staging elements

1.1 Confirm staging installation requirements in consultation with relevant personnel and with reference to stage plans and other documentation

1.2 Take account of bump-in schedule when preparing venue and applying stage plans to venue layout

1.3 Where there is an existing stage, communicate modifications clearly to relevant personnel and implement as required

1.4 Install equipment and necessary structures in consultation with relevant personnel

1.5 Comply with safety guidelines and licensing requirements when pre-rigging equipment

2. Complete staging installation tasks

2.1 Mark out ground plans on stage according to design specifications and venue requirements

2.2 Install staging elements according to production requirements and in the agreed sequence

2.3 Follow safe work practices at all times and comply with equipment manufacturer instructions during the installation process

2.4 Use appropriate equipment to assist with staging installation

2.5 Complete work tasks within production or event deadlines

3. Check staging elements after installation

3.1 Check each staging element to ensure operational standards for performance are achieved and that all safety requirements have been met

3.2 Identify problems with staging elements, take appropriate action to rectify or refer to relevant personnel for action

3.3 Identify modifications required to improve suitability for performance and take appropriate action

3.4 Complete and distribute workplace documentation as required

Evidence of the ability to:

install staging elements for at least two productions

follow safety procedures

work collaboratively

meet work deadlines.

Note: If a specific volume or frequency is not stated, then evidence must be provided for each of the above points at least once.

To complete the unit requirements the individual must:

in the context of testing staging elements after installation, describe:

the different types of control desks that operate stage machinery

how to work out the load capacity of stage machinery

how to manoeuvre loads safely and efficiently

explain how to handle scenic elements during installation

describe or demonstrate signals to be employed when using stage machinery

describe how the following apply to the process of installing staging elements:

moving loads safely

safe manual-handling techniques

using ladders

working at heights

describe safety procedures to be followed in the event of emergencies involving lifting, revolving or trucking