NTISthis.com

Evidence Guide: CUASTA402 - Install and uninstall specialist staging equipment

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CUASTA402 - Install and uninstall specialist staging equipment

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install specialist staging equipment

  1. Clarify requirements for specialist staging equipment in consultation with relevant personnel and with reference to production documentation
  2. Inspect fly tower and stage at venues to identify modifications that may need to be made to existing grid or infrastructure
  3. Organise modifications in line with own level of responsibility and refer matters that need attention to relevant personnel
  4. Plan installation work, ensuring compliance with safety guidelines and licensing requirements
  5. Anticipate problems that may arise during installation, rehearsal and operational phases and plan accordingly
  6. Obtain approval for a weight loads plan and safe work methods statement
Clarify requirements for specialist staging equipment in consultation with relevant personnel and with reference to production documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect fly tower and stage at venues to identify modifications that may need to be made to existing grid or infrastructure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise modifications in line with own level of responsibility and refer matters that need attention to relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan installation work, ensuring compliance with safety guidelines and licensing requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Anticipate problems that may arise during installation, rehearsal and operational phases and plan accordingly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain approval for a weight loads plan and safe work methods statement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete specialist staging installation

  1. Load counter-weight cradles to fly scenery and other items in line with production requirements
  2. Rig bridles, spreaders or other rigging equipment to create rigging points not covered by existing grids
  3. Install and synchronise chain motors and winches as required
  4. Install brailing lines to manage scenery and other items in grids
  5. Safely install specialist staging elements in a sequence that maximises efficiency of operations and meets production deadlines
  6. Progressively test equipment installed for functionality and adjust installation as required
Load counter-weight cradles to fly scenery and other items in line with production requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rig bridles, spreaders or other rigging equipment to create rigging points not covered by existing grids

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and synchronise chain motors and winches as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install brailing lines to manage scenery and other items in grids

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safely install specialist staging elements in a sequence that maximises efficiency of operations and meets production deadlines

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Progressively test equipment installed for functionality and adjust installation as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete post-show operations

  1. Uninstall specialist staging equipment safely and in a sequence that maximises efficiency of operations
  2. Organise maintenance of equipment as required before storing or transporting
  3. Provide input into post-show debriefing sessions and note aspects of staging operations that could be improved in future productions
  4. Review own work performance and adjust work practices accordingly
Uninstall specialist staging equipment safely and in a sequence that maximises efficiency of operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise maintenance of equipment as required before storing or transporting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide input into post-show debriefing sessions and note aspects of staging operations that could be improved in future productions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review own work performance and adjust work practices accordingly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to install specialist staging equipment

1.1 Clarify requirements for specialist staging equipment in consultation with relevant personnel and with reference to production documentation

1.2 Inspect fly tower and stage at venues to identify modifications that may need to be made to existing grid or infrastructure

1.3 Organise modifications in line with own level of responsibility and refer matters that need attention to relevant personnel

1.4 Plan installation work, ensuring compliance with safety guidelines and licensing requirements

1.5 Anticipate problems that may arise during installation, rehearsal and operational phases and plan accordingly

1.6 Obtain approval for a weight loads plan and safe work methods statement

2. Complete specialist staging installation

2.1 Load counter-weight cradles to fly scenery and other items in line with production requirements

2.2 Rig bridles, spreaders or other rigging equipment to create rigging points not covered by existing grids

2.3 Install and synchronise chain motors and winches as required

2.4 Install brailing lines to manage scenery and other items in grids

2.5 Safely install specialist staging elements in a sequence that maximises efficiency of operations and meets production deadlines

2.6 Progressively test equipment installed for functionality and adjust installation as required

3. Complete post-show operations

3.1 Uninstall specialist staging equipment safely and in a sequence that maximises efficiency of operations

3.2 Organise maintenance of equipment as required before storing or transporting

3.3 Provide input into post-show debriefing sessions and note aspects of staging operations that could be improved in future productions

3.4 Review own work performance and adjust work practices accordingly

Required Skills and Knowledge

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to install specialist staging equipment

1.1 Clarify requirements for specialist staging equipment in consultation with relevant personnel and with reference to production documentation

1.2 Inspect fly tower and stage at venues to identify modifications that may need to be made to existing grid or infrastructure

1.3 Organise modifications in line with own level of responsibility and refer matters that need attention to relevant personnel

1.4 Plan installation work, ensuring compliance with safety guidelines and licensing requirements

1.5 Anticipate problems that may arise during installation, rehearsal and operational phases and plan accordingly

1.6 Obtain approval for a weight loads plan and safe work methods statement

2. Complete specialist staging installation

2.1 Load counter-weight cradles to fly scenery and other items in line with production requirements

2.2 Rig bridles, spreaders or other rigging equipment to create rigging points not covered by existing grids

2.3 Install and synchronise chain motors and winches as required

2.4 Install brailing lines to manage scenery and other items in grids

2.5 Safely install specialist staging elements in a sequence that maximises efficiency of operations and meets production deadlines

2.6 Progressively test equipment installed for functionality and adjust installation as required

3. Complete post-show operations

3.1 Uninstall specialist staging equipment safely and in a sequence that maximises efficiency of operations

3.2 Organise maintenance of equipment as required before storing or transporting

3.3 Provide input into post-show debriefing sessions and note aspects of staging operations that could be improved in future productions

3.4 Review own work performance and adjust work practices accordingly

Evidence of the ability to:

prepare a weight loads plan for at least one production

install and uninstall a range of specialist staging equipment for at least two productions

work collaboratively

follow safe work practices.

Note: If a specific volume or frequency is not stated, then evidence must be provided for each of the above points at least once.

To complete the unit requirements the individual must:

describe hazards associated with installing staging equipment and explain how to minimise them

describe methods of lifting, handling and supporting staging equipment during installation

explain what needs to be included in a safe work methods statement

describe issues and challenges that typically arise in the context of installing specialist staging equipment, along with solutions to address them

describe safety issues that impact on flying systems, including regulations about:

tasks that require a licensed rigger

work that can be undertaken by unlicensed personnel.