The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare projection system for screening
|
|
Clean the projection system, as required, prior to screening and ensure that all sprocket guides, rollers pads and film gates are clean and free of dust Completed |
Evidence:
|
Ensure that there is no oil on the film path Completed |
Evidence:
|
Power up the projector, lamp and other projection equipment in sufficient time before screening Completed |
Evidence:
|
Adjust the tension devices on film transport system to ensure that film runs through smoothly, without tearing Completed |
Evidence:
|
Seat the film on film transport system so that it is lying smooth and flat Completed |
Evidence:
|
Lace film onto the projector
|
|
Feed the film from transport system to projector, ensuring film is aligned and lying smoothly and flat in guide rollers Completed |
Evidence:
|
Adjust rollers, as required, so that film is fed evenly Completed |
Evidence:
|
Prepare projector correctly for threading Completed |
Evidence:
|
Create correct loops above and below film gate to ensure the smooth and even running of the film through the film gate Completed |
Evidence:
|
Thread film so that it is lying flat across film gate, sound drum and all other sprockets, guides, rollers and pads Completed |
Evidence:
|
Set gate tension at a minimum to provide a steady image on the screen Completed |
Evidence:
|
Check the film path by inching knob or short run of film, ensuring that film runs smoothly Completed |
Evidence:
|
Thread film so that it runs smoothly onto take-up spool Completed |
Evidence:
|
Ensure that projection room conditions are safe at all times and refer problems to appropriate colleagues Completed |
Evidence:
|