NTISthis.com

Evidence Guide: CUELGT04C - Operate floor electrics

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CUELGT04C - Operate floor electrics

What evidence can you provide to prove your understanding of each of the following citeria?

Participate in technical or creative run-through.

  1. Set floor electrics in accordance with performance requirements.
  2. Integrate the operation of floor electrics into the run-through and communicate relevant information to performers.
  3. Plot, record, rehearse and execute cues on direction from the appropriate personnel.
  4. Set back-up systems for use in the event of an equipment malfunction and test to ensure that they are in working order.
  5. Implement changes to cueing and modify and cue sheets accurately as required.
Set floor electrics in accordance with performance requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Integrate the operation of floor electrics into the run-through and communicate relevant information to performers.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plot, record, rehearse and execute cues on direction from the appropriate personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set back-up systems for use in the event of an equipment malfunction and test to ensure that they are in working order.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement changes to cueing and modify and cue sheets accurately as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for floor electrics operation.

  1. Identify, implement and document changes to floor electrics operation as required.
  2. Check communications equipment to ensure that it is in working order.
  3. Check consumables are adequate for the performance.
  4. Place floor electrics equipment in stand-by position for the start of the performance in accordance with safety and performance requirements.
  5. Identify equipment requiring warm-up and turn on at the appropriate time.
  6. Check all floor electrics components to ensure that they are operating to specifications.
  7. Identify any problems or faults promptly, take safe and appropriate action to rectify or report to relevant personnel.
  8. Isolate smoke detectors and check changes to air conditioning as required.
  9. Check that all cables are run safely and neatly.
Identify, implement and document changes to floor electrics operation as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check communications equipment to ensure that it is in working order.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check consumables are adequate for the performance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place floor electrics equipment in stand-by position for the start of the performance in accordance with safety and performance requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify equipment requiring warm-up and turn on at the appropriate time.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check all floor electrics components to ensure that they are operating to specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify any problems or faults promptly, take safe and appropriate action to rectify or report to relevant personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Isolate smoke detectors and check changes to air conditioning as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check that all cables are run safely and neatly.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate floor electrics.

  1. Execute floor electrics changes on cue in accordance with the running sheet, stage manager's directions and the requirements of the performance and/or venue.
  2. Check cables to ensure correct setting.
  3. Make modifications to floor electrics cues when required, to cater for unexpected contingencies and inform appropriate personnel.
  4. Identify any problems or faults promptly, take safe and appropriate action to rectify or report to relevant personnel.
  5. Use back-up systems correctly when required.
Execute floor electrics changes on cue in accordance with the running sheet, stage manager's directions and the requirements of the performance and/or venue.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check cables to ensure correct setting.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make modifications to floor electrics cues when required, to cater for unexpected contingencies and inform appropriate personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify any problems or faults promptly, take safe and appropriate action to rectify or report to relevant personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use back-up systems correctly when required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down and disassemble floor electrics equipment.

  1. Turn off power to all floor electrics elements or set to standby as required by the production.
  2. Reset smoke detectors and air-conditioning as required.
  3. Prepare and position all floor electrics elements correctly for the next performance as required, or return equipment to stand-by.
  4. Make accurate updates on cue sheets and other documentation and file in accordance with enterprise procedures.
Turn off power to all floor electrics elements or set to standby as required by the production.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Reset smoke detectors and air-conditioning as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare and position all floor electrics elements correctly for the next performance as required, or return equipment to stand-by.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make accurate updates on cue sheets and other documentation and file in accordance with enterprise procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The following evidence is critical to the judgement of competence in this unit:

knowledge of electricity as it relates to floor electrics

applying safe procedures for working with electricity

communicating effectively with colleagues and customers within the range of situations defined for the job role.

Context of and specific resources for assessment

The assessment context must provide for:

demonstration of skills in operating floor electrics for an actual performance on more than one occasion

demonstration of skills in multiple performance contexts and with different types of floor electrics

involvement of and interaction with a team to reflect the collaborative nature of the technical production process

use of industry-current equipment.

Method of assessment

Assessment may incorporate a range of methods to assess performance and the application of essential underpinning knowledge, and might include:

direct observation of a performance where the candidate is responsible for the operation of floor electrics

oral or written questioning to assess knowledge of equipment types and features and safety issues

case studies or problem solving exercises to assess the candidate's ability to respond to different operational situations and contexts

review of portfolios of evidence and third party workplace reports of on-the job performance by the candidate.

Assessment methods should closely reflect workplace demands and the needs of particular groups (eg people with disabilities, and people who may have literacy or numeracy difficulties such as speakers of languages other than English, remote communities and those with interrupted schooling).

Assessment of this unit requires access to:

a venue that has the capacity for floor electrics operation

floor electrics equipment and consumables

cueing and other production documentation from which floor electrics are operated

a production on which the candidate can work.

Required Skills and Knowledge

Required skills:

effective communication skills to liaise with other team members prior to and during a performance.

Required knowledge:

major types of floor electrics equipment and their uses in different production contexts

lighting terminology particularly in relation to the operation of floor electrics

operation features and functions of a range of floor electrics

occupational health and safety requirements particularly in relation to the operation of floor electrics

relationship of floor electrics to other lighting and staging effects.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant personnel may include:

designer

director

head of department

stage manager

supervisor

other specialist staff.

Consumables may include:

gaffer tape

gel

lamp stock

PVC tape.