The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Locate a supply of water
|
|
A water supply within a designated area is located Completed |
Evidence:
|
Water is collected and tested for compliance with quality standards in accordance with standard procedures Completed |
Evidence:
|
Water sources are assessed for suitability to be used for collection, treatment and storage Completed |
Evidence:
|
The suitabilityof the water as a source of supply is determined and if approved, the site is prepared Completed |
Evidence:
|
Prepare a field water-point
|
|
Personal protective equipment is selected and worn in accordance with standard procedures Completed |
Evidence:
|
Equipment, tools and materials are selected and checked for serviceability and any faults are reported to the supervisor Completed |
Evidence:
|
Local utility assets such as water, electricity and gas pipelines are located and marked to prevent damage, and liaison is undertaken with local authorities as required Completed |
Evidence:
|
Water-point chemicals are correctly handled, prepared, tested and stored in accordance with standard procedures and any faults are reported to the supervisor Completed |
Evidence:
|
When mechanical excavation equipment is required, contact with appropriate agencies is established and maintained to facilitate construction activities Completed |
Evidence:
|
Manual or mechanical equipment is used, where required, to construct the water-point and to compact/backfill the site in accordance with standard procedures Completed |
Evidence:
|
Structures such as water towers and storage tanks are constructed/established, as required, in accordance with standard procedures Completed |
Evidence:
|
Field water supply equipment and accessories are assembled, operated and maintained in accordance with standard procedures Completed |
Evidence:
|
Operate a water-point to produce potable water
|
|
Potable water is produced, stored and distributed in accordance with standard procedures Completed |
Evidence:
|
Water treatment and testing equipment is calibrated, serviced, operated and maintained in accordance with standard procedures Completed |
Evidence:
|
Water samples are collected and tested in accordance with standard procedures Completed |
Evidence:
|
Chemicals are used in accordance with standard procedures Completed |
Evidence:
|
Information related to chemical supply, usage and disposal is recorded in accordance with standard procedures Completed |
Evidence:
|
Process and performance data is collected, recorded, maintained and reported in accordance with standard procedures Completed |
Evidence:
|
Equipment is inspected and maintained in accordance with manufacturer's instructions and standard procedures Completed |
Evidence:
|
Refurbish water-point site
|
|
Work site is restored to normal, when required, in accordance with standard procedures Completed |
Evidence:
|
Chemicals are disposed of in accordance with standard procedures Completed |
Evidence:
|