The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for construction
|
|
Appropriate personal protective equipment is selected and worn in accordance with OH&S requirements Completed |
Evidence:
|
Tools and equipment required for the job are selected, checked for serviceability and any faults are reported to the supervisor Completed |
Evidence:
|
The road/track line is laid out and cleared of vegetation and obstructions in accordance with standard procedures and job instructions Completed |
Evidence:
|
Construct road/track sub-base
|
|
Soil is removed manually or with the assistance of plant support to establish a base of suitable width, slope and stability Completed |
Evidence:
|
Soil and waste removal is coordinated with plant operators and dumped or stored in accordance with standard procedures Completed |
Evidence:
|
Soil is compacted or stabilised chemically or mechanically with the assistance of plant support Completed |
Evidence:
|
Provision for drainage and crossing points is progressively made in accordance with standard procedures Completed |
Evidence:
|
Construct road/track surface and drainage
|
|
Road/track base and other surface materials such as pierced steel plank (PSP) and locally won expedient materials are transferred, spread, compacted and laid/fixed to meet the planned road/track design in accordance with standard procedures Completed |
Evidence:
|
Drains are provided and water run-off is established Completed |
Evidence:
|
Construct crossings
|
|
Road/track surface is cut and prepared at crossing point using appropriate compaction Completed |
Evidence:
|
Culverts are installed as required in accordance with the predicted volume of water Completed |
Evidence:
|
Pipes or cords are placed and correctly backfilled and compacted Completed |
Evidence:
|
Maintain road/track and refurbish work site
|
|
Condition of road/track is monitored in relation to volume of traffic, loads and expected future requirements Completed |
Evidence:
|
Damage likely to lead to safety or environmental issues is identified and repaired or immediately reported to supervisor Completed |
Evidence:
|
Normal wear and tear damage repair is planned and carried out with minimal disruption to other activities Completed |
Evidence:
|
Ineffective drainage is identified and modified as required Completed |
Evidence:
|