NTISthis.com

Evidence Guide: DEFCA325 - Prepare and operate a field water point

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

DEFCA325 - Prepare and operate a field water point

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare and plan for water acquisition

  1. Requirement is received, understood and confirmed with higher authority as necessary.
  2. Resource availability and serviceability is identified and constraints are determined.
  3. An analysis of the area is conducted from available data to identify potential water sources.
  4. Site surveys, risk and environmental assessments are conducted.
  5. Field water-point plan is developed in accordance with survey, water quality and quantity, resources, risks and environmental considerations.
  6. Problems that cannot be resolved locally are referred to higher authority for resolution.
  7. Competence of team members is confirmed and monitored.
  8. Team is briefed in accordance with standard procedures.
  9. Liaison with outside agencies is undertaken as required.
  10. Work health and safety (WHS) requirements and recognised safety precautions are applied throughout the operation in accordance with standard procedures.
Requirement is received, understood and confirmed with higher authority as necessary.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resource availability and serviceability is identified and constraints are determined.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

An analysis of the area is conducted from available data to identify potential water sources.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site surveys, risk and environmental assessments are conducted.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Field water-point plan is developed in accordance with survey, water quality and quantity, resources, risks and environmental considerations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Problems that cannot be resolved locally are referred to higher authority for resolution.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Competence of team members is confirmed and monitored.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Team is briefed in accordance with standard procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Liaison with outside agencies is undertaken as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work health and safety (WHS) requirements and recognised safety precautions are applied throughout the operation in accordance with standard procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct a field water-point

  1. Team is directed and supervised in accordance with plan.
  2. Support from outside agencies is organised and directed.
  3. Local utility assets are located and marked to prevent damage.
  4. Routes in and out of waterpoints are established.
  5. Structures are designed and constructed/established.
  6. Technical advice is provided to the chain of command and/or support agencies.
  7. All unexpected situations that require a quick and decisive response are recognised and responded to in accordance with operational requirements and standard procedures.
Team is directed and supervised in accordance with plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Support from outside agencies is organised and directed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Local utility assets are located and marked to prevent damage.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Routes in and out of waterpoints are established.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Structures are designed and constructed/established.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Technical advice is provided to the chain of command and/or support agencies.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All unexpected situations that require a quick and decisive response are recognised and responded to in accordance with operational requirements and standard procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate and maintain a field water-point

  1. Potable water is produced, stored and distributed in accordance with standard procedures.
  2. Waterpoint team is supervised.
  3. All unexpected situations that require a response are recognised and responded to in accordance with operational requirements and standard procedures.
  4. Reports and data are provided to higher authority in accordance with standard procedures.
Potable water is produced, stored and distributed in accordance with standard procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Waterpoint team is supervised.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All unexpected situations that require a response are recognised and responded to in accordance with operational requirements and standard procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Reports and data are provided to higher authority in accordance with standard procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Refurbish site and finalise activity

  1. Site is refurbished in accordance with environmental requirements.
  2. Chemicals and waste are disposed of in accordance with environmental requirements and standard procedures.
  3. Equipment, tools and materials are recovered, cleaned and maintained.
  4. Equipment, tools and materials are either stored or redeployed to another site in accordance with standard procedures.
  5. Documentation is completed in accordance with standard procedures.
Site is refurbished in accordance with environmental requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Chemicals and waste are disposed of in accordance with environmental requirements and standard procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment, tools and materials are recovered, cleaned and maintained.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment, tools and materials are either stored or redeployed to another site in accordance with standard procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is completed in accordance with standard procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessment must confirm the ability to construct at least three types of field structures included in the Range Statement using a variety of materials and expedient construction methods. At least one above and one below ground structure should be constructed.

Assessment must also confirm the ability to:

interpret job instructions and plans, and layout a site

prepare materials and equipment for construction

apply appropriate expedient construction methods and procedures to the construction including accurate measuring and levelling

use standard processes to handle and place materials

complete the construction of field structures to the specified standard

work in a team and interactively communicate with others

Consistency in performance

Competency should be demonstrated under field conditions over a time frame that allows for constructing and maintaining a number of field structures utilising expedient construction methods and a variety of materials.

Context of and specific resources for assessment

Context of assessment

Competency should be assessed in the workplace or in a simulated workplace environment.Competency should be assessed in a field environment.

Specific resources for assessment

Access to:

construction materials relevant to the task

hand tools, power tools, plant and other equipment appropriate to the construction process

suitable training areas for construction.

Required Skills and Knowledge

This describes the essential skills and knowledge and their level, required for this unit.

Required Skills

analyse instructions

command and control skills

conduct and quality assure water analysis

conduct risk assessment

conduct tactical and technical reconnaissance – waterpoint

design and prepare chemical storage

liaison skills

manage fuel/chemical spill containment

manage the storage of water

prepare and issue instructions and orders

provide advice

select and maintain routes

supervise the construction of improvised water towers

use MSDS

Required Knowledge

design and construction requirements of improvised water towers

environmental compliance certificate

environmental considerations:

chemical storage/MSDS

fuel/chemical spill containment

legal responsibilities

pathology report of water samples

relevant legislation and procedures in relation to environmental requirements

relevant WHS regulations/requirements, equipment, material and personal safety requirements

requirements of a technical reconnaissance of a waterpoint

water analysis and storage requirements

Range Statement

The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.

Site survey may include:

access

access to local resources

availability of storage

collecting and testing water samples

ease of distribution

security of site

site diagram

site reference points

water flow rates

water quality

volume of water (yield)

Field waterpoint may include:

access roads

accommodation

chemicals

communications equipment

drainage

filling points

fuel

generator and lighting

hardstanding

pumps and pipes

signage

storage facilities

testing facilities – field and laboratory (pathology)

water desalination equipment

water purification equipment

Standard procedures may include:

Australian Standards

job guides, pamphlets and other publications

manufacturers’ handbooks, industry specifications and technical instructions

material safety data sheets (MSDS)

WHS regulations

organisational policies and procedures

relevant local government bylaws

relevant state/territory or federal legislation or regulations

water quality requirements

written and verbal orders and job instructions

Local utility assets may include:

electricity

gas pipelines

water

Structures may include:

storage tanks

water towers

Potable water is clear of:

bacterial levels that are within medical standards

colour

odour

poisons

plant algae

PH in accordance with WHS standards

salinity

turbidity

Supervising a waterpoint team may include:

accurately recording relevant information

calibrating, servicing, operating and maintaining water treatment and testing equipment

collecting and testing water samples

completing maintenance activities in accordance with standard procedures

storing, handling and applying chemicals in accordance with WHS requirements and standard procedures

Documentation may include:

construction documentation

distribution records

environmental compliance

equipment documentation

maintenance records

water testing records