NTISthis.com

Evidence Guide: DEFEO503C - Conduct explosive ordnance packaging inspection

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

DEFEO503C - Conduct explosive ordnance packaging inspection

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for Inspection

  1. Requirement for explosive ordnance packaging inspection is identified from work requests/instructions and is confirmed
  2. WHS requirements, including those contained in organisational procedures, are applied throughout the operation
  3. Technical references, tools and equipment required for the inspection are identified, acquired and prepared in accordance with organisation procedures
  4. Packaging is acquired, identified and accounted for, and moved or pre-positioned in preparation for inspection
Requirement for explosive ordnance packaging inspection is identified from work requests/instructions and is confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS requirements, including those contained in organisational procedures, are applied throughout the operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Technical references, tools and equipment required for the inspection are identified, acquired and prepared in accordance with organisation procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Packaging is acquired, identified and accounted for, and moved or pre-positioned in preparation for inspection

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect explosive ordnance

  1. Packaging is inspected in a logical set sequence to ensure that defects or damage are not overlooked in accordance with organisation policy and procedures, and technical specifications
  2. Damage or other defects are identified and recorded in accordance with organisation procedures
Packaging is inspected in a logical set sequence to ensure that defects or damage are not overlooked in accordance with organisation policy and procedures, and technical specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Damage or other defects are identified and recorded in accordance with organisation procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out post inspection procedures

  1. Packaging is processed in accordance with organisation procedures
  2. Documentation and records are maintained in accordance with statutory, organisation and workshop requirements
Packaging is processed in accordance with organisation procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation and records are maintained in accordance with statutory, organisation and workshop requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessment must confirm the ability to comply with:

organisational safety requirements

appropriate legislative and regulatory requirements.

Assessment must also confirm the ability to work safely within a workshop environment and to:

identify packaging

identify labelling and marking

process explosive ordnance packaging

maintain documentation

Consistency in performance

Competency should be demonstrated in a range of actual or simulated reconditioning contexts.

Context of and specific resources for assessment

Context of assessment

Competency should be assessed in the workplace or in a simulated work environment, in accordance with all relevant legislation and organisational requirements.

Specific resources for assessment

Access is required to:

facilities and resources used in the reconditioning of explosive ordnance packaging.

Method of assessment

In a public safety environment assessment is usually conducted via direct observation in a training environment or in the workplace via subject matter supervision and/or mentoring, which is typically recorded in a competency workbook.

Assessment is completed using appropriately qualified assessors who select the most appropriate method of assessment.

Assessment may occur in an operational environment or in an industry-approved simulated work environment. Forms of assessment that are typically used include:

direct observation

interviewing the candidate

journals and workplace documentation

third party reports from supervisors

written or oral questions

Required Skills and Knowledge

This describes the essential skills and knowledge and their level, required for this unit.

Required Skills

apply WHS requirements

communicate orally and in writing

identify faults, markings and labels

maintain documentation

process explosive ordnance packaging

read, access, interpret and apply technical instructions and drawings related to packaging inspections

Required Knowledge

characteristics and limitations of packaging to be inspected

inspection procedures

organisational documentation requirements

organisational WHS requirements

Range Statement

The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.

Packaging inspections may be conducted:

As part of a work program

On direction

On receipt

Prior to maintenance

Prior to or post any activity

Organisation may include:

Defence organisation

Enterprises that work with explosive ordnance

Other government departments or instrumentalities that work with explosive ordnance

Technical references may include:

Technical drawings

Technical reference pamphlets

Orders and instructions

Other publications

Packaging may be constructed from:

Aluminium

Bakelite

Cardboard

Fibreglass

Plastic

Polystyrene

Rubber

Steel

Tin

Wood

Inspections may include:

Closing devices

Desiccant indicators

Handles

Hinges

Internal/external fitments

Internal packaging

Labels such as:

free from explosives certification

warning labels

security seals

special markings

hazard labels

contents labels

un serial number

shipping labels

fraction label

model/mark of packaging

Pressure release valves

Seals

Inspection may result in packaging being:

Passed for use

Recommended for sentencing

Rejected

Explosive ordnance defects or damage may include:

Corrosion

Dents

Fire damage

Holes

Non-compliance with technical specifications

Tears

Processing may include:

Disposal

Rejection

Retention for return or maintenance

Documentation and records may include:

Receipt and issue records

Timesheets

Work records