NTISthis.com

Evidence Guide: DEFEO805A - Conduct dynamic other calibre proof tests

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

DEFEO805A - Conduct dynamic other calibre proof tests

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for dynamic other calibre proof tests

  1. Stakeholders and test participants are briefed in accordance with organisational policies and procedures, and test plan
  2. Safety systems and procedures are checked and initiated in accordance with organisational policies and procedures, and test plan
  3. Information on resource requirements and availability is obtained and confirmed in accordance with procedures
  4. Information support systems for dynamic other calibre proof tests, including achievable reporting and recording processes are prepared in accordance with resource requirements
  5. Coordination issues with others affected by the tests are negotiated and resolved
  6. Safety traces are constructed when required, in accordance with standard procedures
  7. Work health and safety (WHS) principles and requirements are identified and observed throughout the test process
Stakeholders and test participants are briefed in accordance with organisational policies and procedures, and test plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety systems and procedures are checked and initiated in accordance with organisational policies and procedures, and test plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Information on resource requirements and availability is obtained and confirmed in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Information support systems for dynamic other calibre proof tests, including achievable reporting and recording processes are prepared in accordance with resource requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordination issues with others affected by the tests are negotiated and resolved

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety traces are constructed when required, in accordance with standard procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work health and safety (WHS) principles and requirements are identified and observed throughout the test process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct tests

  1. Dynamic other calibre proof test planners are identified and liaison is effected in accordance with policies and procedures
  2. Test plan is implemented, monitored and amended based on changing circumstances in accordance with methodologies and procedures
  3. Tests are conducted in accordance with testing requirements
  4. Resources are allocated to testing tasks in accordance with test plan and resource availability
  5. Data being generated by tests is recorded in accordance with the agreed methodology
Dynamic other calibre proof test planners are identified and liaison is effected in accordance with policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test plan is implemented, monitored and amended based on changing circumstances in accordance with methodologies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tests are conducted in accordance with testing requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources are allocated to testing tasks in accordance with test plan and resource availability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Data being generated by tests is recorded in accordance with the agreed methodology

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report on test results

  1. Data generated by the test is collected and reported in accordance with policies and procedures
  2. Options and recommendations resulting from the test are provided in a clear and comprehensive format
  3. Post testing reports, statistical reports and other records are produced and maintained in accordance with requirements
Data generated by the test is collected and reported in accordance with policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Options and recommendations resulting from the test are provided in a clear and comprehensive format

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Post testing reports, statistical reports and other records are produced and maintained in accordance with requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for this Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessment must confirm the ability to apply dynamic other calibre proof test methodologies and procedures including the coordination of test resources and the documentation of test results.

Consistency in performance

Competency should be demonstrated in a range of actual or simulated other calibre explosive ordnance proof test contexts.

Context of and specific resources for assessment

Context of assessment

Competency should be assessed in the workplace or in a simulated work environment, in accordance with all relevant legislation and organisational requirements.

Specific resources for assessment

Access is require to

facilities and resources used in conducting other calibre proof tests.

Method of assessment

This unit may be assessed with the following unit:

DEFEO101D Work safely with explosive ordnance.

In a public safety environment assessment is usually conducted via direct observation in a training environment or in the workplace via subject matter supervision and/or mentoring, which is typically recorded in a competency workbook.

Assessment is completed using appropriately qualified assessors who select the most appropriate method of assessment.

Assessment may occur in an operational environment or in an industry-approved simulated work environment. Forms of assessment that are typically used include:

direct observation

interviewing the candidate

journals and workplace documentation

third party reports from supervisors

written or oral questions

Required Skills and Knowledge

This describes the essential skills and knowledge and their level, required for this unit.

Required Skills

allocate resources

apply organisational WHS requirements

apply organisational safety policies and structures

assess risks

communicate effectively with stakeholders

coordinate activities

evaluate information

liaise effectively with stakeholders

write reports

Required Knowledge

dynamic other calibre proof testing methodologies

evaluation processes

organisational WHS requirements

organisational safety policies and structures

reporting procedures

resource allocation procedures

resource requirements

risk assessment

Range Statement

The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.

Stakeholders may include:

Clients or customers (internal and external)

End user/s

General public

Industry

Landowner/s

Organisation's senior management

Other agencies

Other functional areas within the organisation

Project teams

Relevant interest groups

Sponsor/funding bodies

Steering committee members

Supplier/service provider

Unions

Organisations may include:

Defence

Defence contractors and sub-contractors

Defence Materiel Organisation

Defence Science and Technology Organisation

International test agencies

Policies and procedures may include:

Government and organisational policy, guidelines and procedures relating to:

delegation approvals

industrial agreements

procurement guidelines

resourcing

risk management

security

strategic or operational plans

technical and regulatory framework

testing and evaluation

training

Relevant commonwealth, state/territory and local laws affecting organisation's administration such as:

financial management and accounting legislation and regulations

WHS legislation

public sector management acts

Test plans may include:

Acquisition strategies

Budget and financial management strategy

Contract management

Cost estimates

Evaluation criteria

Expected/measurable outcomes

Facilities

Functional performance specifications

Governance strategy

Implementation strategy

Inclusions and exclusions

Information/communication strategy

Intellectual property strategies

Milestones

Objectives

Occupational concept document

People plan including human resource management and human resource development

Performance criteria/indicators

Purpose

Quality assurance

Quality control

Quality standards

Rationale

Required resources

Resource management

Risk management

Roles and responsibilities

Safety criteria

Schedule/timeline

Specific equipment, instrumentation, and/or specialised facilities and required conditions

Task/WBS

Test and evaluation master plan (TEMP) criteria

Test concept document

Testing control mechanisms

Testing deliverables and their acceptance criteria

Information support systems may include:

Computerised systems

Manual systems

Dynamic other calibre proof tests may include:

Proof testing of other calibre explosive ordnance against specified standards

Proof testing of other calibre explosive ordnance beyond 20 mm calibre

Specific field testing which is not a normal component of laboratory testing

Methodologies and procedures may include:

Those established by:

divisions

manufacturer

organisation

Or may be specified by the client

Tests may include :

Person firings with the firer holding the weapon

Proof firings from pre-established fixed facilities

Resources may include:

Budgets

Materials

Personnel

Time

Clear and comprehensive format may include:

Development of new procedures for future activities

Outcomes that can be easily understood

Solutions to problems that were faced during the testing