Evidence Guide: DEFPE005A - Assist in the construction and operation of a non-permanent inland pipeline system

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

DEFPE005A - Assist in the construction and operation of a non-permanent inland pipeline system

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for construction

  1. Instructions for the installation, including schematic diagrams, are received and confirmed with supervisor
  2. Equipment is selected and inspected for serviceability prior to construction
  3. Safety equipment is set-up prior to commencement of construction
  4. Work health and safety (WHS) requirements and recognised safety precautions are applied throughout the operation in accordance with standard procedures
  5. Environmentally sustainable work practices are identified, assessed and implemented where feasible
Instructions for the installation, including schematic diagrams, are received and confirmed with supervisor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is selected and inspected for serviceability prior to construction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety equipment is set-up prior to commencement of construction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work health and safety (WHS) requirements and recognised safety precautions are applied throughout the operation in accordance with standard procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmentally sustainable work practices are identified, assessed and implemented where feasible

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct an inland pipeline distribution system

  1. Inland pipeline distribution system is constructed in accordance with instructions and workplace procedures
  2. Pipeline is earthed in accordance with workplace procedures to prevent static discharge
  3. Inland pipeline distribution system is tested in accordance with instructions and workplace procedures
  4. Problems encountered during construction or testing are reported to supervisor
Inland pipeline distribution system is constructed in accordance with instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pipeline is earthed in accordance with workplace procedures to prevent static discharge

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inland pipeline distribution system is tested in accordance with instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Problems encountered during construction or testing are reported to supervisor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Transfer liquid using an inland pipeline distribution system

  1. Individual tasks are received and confirmed with supervisor
  2. Pumping equipment is configured for transfer operations in accordance with workplace procedures
  3. Fuel is tested for product contamination and results are recorded
  4. Contaminated product is quarantined and reported to supervisor
  5. Communication is maintained with team members and supervisor throughout fuel transfer operations
  6. Fuel transfer is conducted in accordance with supervisor's instructions
  7. Pipeline is pigged as directed by supervisor
  8. Fuel transfer process is monitored and faults are rectified or reported in accordance with workplace procedures
  9. Emergencies/incidents are responded to in accordance with emergency response plans
  10. Fuel transfer equipment is shut down on completion of transfer operations in accordance with manufacturer's instructions
  11. Documentation is completed in accordance with workplace procedures
Individual tasks are received and confirmed with supervisor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pumping equipment is configured for transfer operations in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fuel is tested for product contamination and results are recorded

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Contaminated product is quarantined and reported to supervisor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication is maintained with team members and supervisor throughout fuel transfer operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fuel transfer is conducted in accordance with supervisor's instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pipeline is pigged as directed by supervisor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fuel transfer process is monitored and faults are rectified or reported in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Emergencies/incidents are responded to in accordance with emergency response plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fuel transfer equipment is shut down on completion of transfer operations in accordance with manufacturer's instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is completed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain an inland pipeline distribution system

  1. Pipeline and pumping equipment is inspected and results are reported to appropriate personnel in accordance with workplace procedures
  2. Pipeline and pumping equipment is maintained in accordance with manufacturers' instructions and workplace maintenance procedures
  3. Minor repairs within scope of own responsibilities are carried out when required
  4. Maintenance and repair tasks are recorded and reported in accordance with workplace procedures
Pipeline and pumping equipment is inspected and results are reported to appropriate personnel in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pipeline and pumping equipment is maintained in accordance with manufacturers' instructions and workplace maintenance procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Minor repairs within scope of own responsibilities are carried out when required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance and repair tasks are recorded and reported in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recover equipment

  1. Inland pipeline distribution system is decommissioned in accordance with instructions and workplace procedures
  2. Equipment is recovered and inspected in accordance with workplace procedures
  3. Site is refurbished in accordance with organisational environmental policies and procedures
Inland pipeline distribution system is decommissioned in accordance with instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is recovered and inspected in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is refurbished in accordance with organisational environmental policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessment must confirm the ability to:

construct a pipeline system which is greater than 1 km in length and utilises a minimum of two pumps.

Consistency in performance

Competency should be demonstrated over time to ensure the candidate is assessed across a wide variety of situations within the workplace.

Context of and specific resources for assessment

Context of assessment

Competency should be assessed in the workplace or a simulated environment.

Specific resources for assessment

Access is required to:

fuel pipelines, pumping equipment and suitable fuel products

safety equipment and personal protective equipment

specific workplace operating procedures and publications.

Required Skills and Knowledge

This describes the essential skills and knowledge and their level, required for this unit.

Required Skills

control fuel spills and fires

interpret fuel markings and panels

interpret technical diagrams and publications

operate communications equipment

operate fuel transfer systems

Required Knowledge

characteristics and capabilities of fuel pipelines and pumping equipment

communication procedures

dangerous goods handling procedures

first aid

fuel testing procedures

functions and responsibilities of team members

hazard control methods associated with fuel products

maintenance procedures for fuel transfer systems

relevant WHS and pollution control legislation and policies

Range Statement

The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.

Non-permanent inland pipeline distribution system may include:

Filters

Fittings

Metres

Pipes

Pumps

Schematic diagrams may include:

Pigging system

Pipelines

Pumps

Safety equipment

Valves

Equipment may include:

150 mm/100 mm fuel equipment including:

fittings

fuel metering equipment

pipelines and hoses

pumps

valves

Pigging system

Safety equipment may include:

Emergency spill kits

Fire extinguishers

First aid kits

Personal protective equipment including:

eye protection

hearing protection

high visibility clothing

gloves

safety headwear and footwear

Workplace procedures may include:

Australian Standards

Briefs

Duty statements

Fire orders

Legislative requirements

Manufacturers' handbooks, industry specifications and technical instructions

WHS regulations

Organisational policies and procedures

Pollution control plan

Procedure manuals

Relevant state/territory or federal legislation

Standard Operating Procedures

Technical procedures

Written or verbal instructions

Testing distribution system may include:

Conducting pressure testing

Ensuring a closed system

Ensuring installation conforms to schematic diagram

Pressing the line with air

Security of all components, fittings and fasteners

Testing fuel for product contamination must include:

Appearance

Particulate

Water

Communication methods may include:

Hand signals

Radio communications

Emergencies/incidents may include:

Exposure to toxic fumes and substances

Fuel fires and explosions

Fuel spills, leaks and ruptures

Minor repairs may include:

Emergency repairs to hoses

Decommissioning may include:

Deconstructing the system

Pigging the pipeline