The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare the boiler for operation
|
|
Health and safety hazards / maintenance requirements are identified and reported to appropriate personnel according to workplace reporting procedures Completed |
Evidence:
|
The boiler is purged according to workplace procedure Completed |
Evidence:
|
Services are confirmed and available Completed |
Evidence:
|
Pre-operational checks are conducted to confirm operational status of boiler and related equipment Completed |
Evidence:
|
Start and monitor boiler operation
|
|
2.1 The boiler is started and brought on line safely according to workplace procedures and manufacturer's specifications Completed |
Evidence:
|
2.2 Plant is operated within limits of manufacturer's specifications to meet workplace requirements Completed |
Evidence:
|
Equipment is monitored to confirm operating condition Completed |
Evidence:
|
Water quality is tested and adjusted as required Completed |
Evidence:
|
Sluice water is circulated to remove ash from boiler according to duty requirements Completed |
Evidence:
|
The workplace meets housekeeping standards Completed |
Evidence:
|
Analyse and respond to abnormal performance
|
|
Operating data and plant operating conditions are analysed to identify causes of abnormal performance Completed |
Evidence:
|
Corrective action is taken in accordance with workplace procedures in response to Hazards, out-of-specification test results and/or plant performance Completed |
Evidence:
|
3.3 Emergency procedures are implemented as required according to workplace procedures and manufacturer's recommendations Completed |
Evidence:
|
Handover boiler operations
|
|
Workplace records are maintained in accordance with statutory requirements and workplace procedures Completed |
Evidence:
|
Handover is carried out according to workplace procedure Completed |
Evidence:
|
Boiler operators are aware of boiler status and related equipment at completion of handover Completed |
Evidence:
|
Carry out an operational shutdown
|
|
5.1 The boiler is shut down according to workplace procedures and manufacturer's recommendations Completed |
Evidence:
|
Maintenance requirements are identified and reported according to workplace reporting procedure Completed |
Evidence:
|
Shutdown the boiler and prepare for an internal inspection
|
|
6.1 The boiler is shut down according to workplace procedures and manufacturer's recommendations Completed |
Evidence:
|
6.2 The boiler is cleaned internally and externally according to workplace procedures and manufacturer's recommendations Completed |
Evidence:
|
Valves and fittings are removed in preparation for maintenance Completed |
Evidence:
|
Store boiler in shutdown mode
|
|
7.1 The boiler is stored in the appropriate storage mode according to workplace procedures and manufacturer's recommendations Completed |
Evidence:
|
Record information
|
|
Workplace information is recorded according to workplace recording requirements Completed |
Evidence:
|