Evidence Guide: FNSIGN403 - Estimate jobs

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FNSIGN403 - Estimate jobs

What evidence can you provide to prove your understanding of each of the following citeria?

Estimate time requirements for jobs

  1. Calculate time estimates for job requirements based on industry times, staff estimates, standard service or repair times, relevant specifications and subcontracted work time
  2. Estimate repair times and consider whether repair is a viable option
  3. Incorporate turnaround times for work completed by subcontractor into total time estimates
Calculate time estimates for job requirements based on industry times, staff estimates, standard service or repair times, relevant specifications and subcontracted work time

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Estimate repair times and consider whether repair is a viable option

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Incorporate turnaround times for work completed by subcontractor into total time estimates

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine availability and source of parts or materials

  1. Ascertain viability of replacement compared to repair to meet appropriate standards and legal requirements where appropriate
  2. Determine parts or materials requirements to ensure cost constraints are met
  3. Determine availability of parts or materials and consumables where required
Ascertain viability of replacement compared to repair to meet appropriate standards and legal requirements where appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine parts or materials requirements to ensure cost constraints are met

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine availability of parts or materials and consumables where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify subcontract repair work costs for incorporation into total estimated cost

  1. Document estimate appropriately
  2. Document relevant repair requirements, scope of works, procedures and costs in logical order
  3. Document repair requirements in detail whenever possible
  4. Note potential variations on estimate
Document estimate appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document relevant repair requirements, scope of works, procedures and costs in logical order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document repair requirements in detail whenever possible

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Note potential variations on estimate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Estimate total job costs

  1. Give external repairers or service providers clear outline of work and time requirements of job
  2. Cost parts, materials and consumables according to industry and/or organisation pricing standards
  3. Document and agree on job cost estimate with repairers or external service providers
  4. Approve repair or total loss settlement in accordance with organisational procedures and legislation
  5. Document final estimate and contract conditions
  6. Prepare variations estimate if required
Give external repairers or service providers clear outline of work and time requirements of job

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cost parts, materials and consumables according to industry and/or organisation pricing standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document and agree on job cost estimate with repairers or external service providers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approve repair or total loss settlement in accordance with organisational procedures and legislation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document final estimate and contract conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare variations estimate if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Estimate time requirements for jobs

1.1 Calculate time estimates for job requirements based on industry times, staff estimates, standard service or repair times, relevant specifications and subcontracted work time

1.2 Estimate repair times and consider whether repair is a viable option

1.3 Incorporate turnaround times for work completed by subcontractor into total time estimates

2. Determine availability and source of parts or materials

2.1 Ascertain viability of replacement compared to repair to meet appropriate standards and legal requirements where appropriate

2.2 Determine parts or materials requirements to ensure cost constraints are met

2.3 Determine availability of parts or materials and consumables where required

3. Identify subcontract repair work costs for incorporation into total estimated cost

3.1 Document estimate appropriately

3.2 Document relevant repair requirements, scope of works, procedures and costs in logical order

3.3 Document repair requirements in detail whenever possible

3.4 Note potential variations on estimate

4. Estimate total job costs

4.1 Give external repairers or service providers clear outline of work and time requirements of job

4.2 Cost parts, materials and consumables according to industry and/or organisation pricing standards

4.3 Document and agree on job cost estimate with repairers or external service providers

4.4 Approve repair or total loss settlement in accordance with organisational procedures and legislation

4.5 Document final estimate and contract conditions

4.6 Prepare variations estimate if required

Required Skills and Knowledge

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Estimate time requirements for jobs

1.1 Calculate time estimates for job requirements based on industry times, staff estimates, standard service or repair times, relevant specifications and subcontracted work time

1.2 Estimate repair times and consider whether repair is a viable option

1.3 Incorporate turnaround times for work completed by subcontractor into total time estimates

2. Determine availability and source of parts or materials

2.1 Ascertain viability of replacement compared to repair to meet appropriate standards and legal requirements where appropriate

2.2 Determine parts or materials requirements to ensure cost constraints are met

2.3 Determine availability of parts or materials and consumables where required

3. Identify subcontract repair work costs for incorporation into total estimated cost

3.1 Document estimate appropriately

3.2 Document relevant repair requirements, scope of works, procedures and costs in logical order

3.3 Document repair requirements in detail whenever possible

3.4 Note potential variations on estimate

4. Estimate total job costs

4.1 Give external repairers or service providers clear outline of work and time requirements of job

4.2 Cost parts, materials and consumables according to industry and/or organisation pricing standards

4.3 Document and agree on job cost estimate with repairers or external service providers

4.4 Approve repair or total loss settlement in accordance with organisational procedures and legislation

4.5 Document final estimate and contract conditions

4.6 Prepare variations estimate if required

Evidence of the ability to:

accurately estimate time required for service and repair jobs by collating information relevant to specifications, industry standard service and repair timeframes, and staff estimates

determine availability and source of parts and materials

estimate total job costs incorporating costs relating to subcontractors, materials and parts

document relevant repair requirements, scope of works, procedures and costs in a logical order.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

describe relevant compliance requirements

describe contract law relating to insurance repairs

explain estimating principles

explain sale-contracting principles

describe processes to access subcontractors, materials and parts

outline effective negotiation techniques

describe key areas of technical knowledge of vehicles and/or buildings used in estimating jobs.