The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for slicing
|
|
Applicable Occupational Health and Safety (OHS), environmental, legislative and organisational requirements relevant to produce veneer from prepared flitches are identified and followed Completed |
Evidence:
|
Work order is reviewed and checked with appropriate personnel Completed |
Evidence:
|
Type and quantity of timber species to be sliced is acquired from the storage location Completed |
Evidence:
|
Equipment is selected appropriate to work requirements and checked for operational effectiveness in line with manufacturer's recommendations Completed |
Evidence:
|
Veneer peeling or slicing process and thickness is planned in line with site procedures Completed |
Evidence:
|
Communication with others is established and maintained in line with OHS requirements Completed |
Evidence:
|
Slice veneer
|
|
Size and condition of prepared flitches is checked as acceptable and flitches then loaded into the slicer Completed |
Evidence:
|
Flitches are placed to maximise available veneer and waste product removed Completed |
Evidence:
|
Veneer slicing process is set and commenced to optimise veneer recovery in line with site procedures Completed |
Evidence:
|
Machine speed and control of veneer cut are constantly adjusted to suit the flitch characteristics in line with site procedures Completed |
Evidence:
|
Material with defects and reject flitch and backing-boards are disposed of in line with site procedures and environmental requirements Completed |
Evidence:
|
Processing and equipment faults are recorded and reported to the appropriate personnel Completed |
Evidence:
|
Conduct operator maintenance
|
|
Equipment lock-out procedures are followed in line with OHS legislation and site procedures Completed |
Evidence:
|
Cutting blades are checked for blunt or damaged condition in line with site procedures Completed |
Evidence:
|
Cutting blades are removed and replaced in line with manufacturer's recommendations Completed |
Evidence:
|
Machine area is kept clear of dust, off-cuts and debris in line with OHS requirements Completed |
Evidence:
|