NTISthis.com

Evidence Guide: FPPSTM3A - Shutdown and store steam boiler

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FPPSTM3A - Shutdown and store steam boiler

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare boiler for controlled shutdown.

  1. Maintenance/rectification requirements are identified and reported in accordance with Standard Operating Procedures (SOP).
  2. Appropriate isolations/lock-outs are initiated.
  3. Boiler and ancillary plant are shutdown in compliance with SOP.
  4. Work is completed within OH&S, SOP, environmental and safe working requirements and practices.
Maintenance/rectification requirements are identified and reported in accordance with Standard Operating Procedures (SOP).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate isolations/lock-outs are initiated.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler and ancillary plant are shutdown in compliance with SOP.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is completed within OH&S, SOP, environmental and safe working requirements and practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct boiler inspection/maintenance.

  1. Boiler is prepared for inspection in accordance with SOP.
  2. Condition of boiler is established to ensure safe removal of equipment.
  3. Hydrostatic test is conducted in accordance with SOP and monitoring requirements.
  4. Inspections and maintenance is carried out according to SOP and statutory requirements.
  5. Internal/external cleaning of boiler and fittings are undertaken.
  6. Work is completed within OH&S, SOP, environmental and safe working requirements and practices.
Boiler is prepared for inspection in accordance with SOP.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Condition of boiler is established to ensure safe removal of equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hydrostatic test is conducted in accordance with SOP and monitoring requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspections and maintenance is carried out according to SOP and statutory requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Internal/external cleaning of boiler and fittings are undertaken.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is completed within OH&S, SOP, environmental and safe working requirements and practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Store boiler in shutdown mode.

  1. Storage time and condition of storage are established.
  2. Boiler is stored in a safe condition for access in accordance with manufacturer's specifications and SOP.
  3. Stored boiler water and chemicals are analysed and handled in accordance with SOP when boiler is stored for extended periods.
  4. Work is completed within OH&S, SOP, environmental and safe working requirements and practices.
Storage time and condition of storage are established.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Boiler is stored in a safe condition for access in accordance with manufacturer's specifications and SOP.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stored boiler water and chemicals are analysed and handled in accordance with SOP when boiler is stored for extended periods.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is completed within OH&S, SOP, environmental and safe working requirements and practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Respond to crash/emergency shutdowns.

  1. Crash is responded to immediately in accordance with SOP.
  2. Emergency conditions are complied with in accordance with legislative and enterprise procedures.
  3. Cause of crash is identified and located where possible.
  4. Immediate safety of personnel and plant is ensured in compliance with SOP.
  5. Continuing plant operation is monitored and maintained in safe working conditions and customers are notified.
  6. Relevant personnel are notified to rectify and make plant ready for restart.
  7. Work is completed within OH&S, SOP, environmental and safe working requirements and practices.
Crash is responded to immediately in accordance with SOP.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Emergency conditions are complied with in accordance with legislative and enterprise procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cause of crash is identified and located where possible.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Immediate safety of personnel and plant is ensured in compliance with SOP.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Continuing plant operation is monitored and maintained in safe working conditions and customers are notified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant personnel are notified to rectify and make plant ready for restart.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is completed within OH&S, SOP, environmental and safe working requirements and practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Explains and implements isolation and access procedures.

Describes plant layout and status identification.

Explains purpose and operation of plant and systems.

Reads and interprets instruments, gauges and data recording equipment.

Conducts pre-operational checks.

Starts up and operates boiler system.

Explains causes and effects of shutdowns.

Describes shutdown responses and procedures.

Implements boiler store/bank procedures.

Reads and interprets specifications and customer orders.

Reports and documents information.

Uses effective verbal and written communication.

Explains boiler water treatment system and reasons for treatment.

Explains statutory responsibilities.

Responds to shutdowns immediately and appropriately as per SOP.

Maintains compliance with all OH&S requirements.

Demonstrates ability to safely store/bank boiler, if applicable, and maintains status according to SOP.

Boiler is consistently set-up and/or re-started within specified time.

Conducts all pre-start checks and procedures.

Handles and/or rectifies start up problems in accordance with SOP or site agreements.

Maintains documentation requirements.

Works within OH&S, SOP, environment and safe working requirements and practices.

Explains and implements isolation and access procedures.

Describes plant layout and status identification.

Explains purpose and operation of plant and systems.

Reads and interprets instruments, gauges and data recording equipment.

Conducts pre-operational checks.

Starts up and operates boiler system.

Explains causes and effects of shutdowns.

Describes shutdown responses and procedures.

Implements boiler store/bank procedures.

Reads and interprets specifications and customer orders.

Reports and documents information.

Uses effective verbal and written communication.

Explains boiler water treatment system and reasons for treatment.

Explains statutory responsibilities.

Responds to shutdowns immediately and appropriately as per SOP.

Maintains compliance with all OH&S requirements.

Demonstrates ability to safely store/bank boiler, if applicable, and maintains status according to SOP.

Boiler is consistently set-up and/or re-started within specified time.

Conducts all pre-start checks and procedures.

Handles and/or rectifies start up problems in accordance with SOP or site agreements.

Maintains documentation requirements.

Works within OH&S, SOP, environment and safe working requirements and practices.

Required Skills and Knowledge

Not applicable.

Range Statement

The competencies described in this group of units relate to those functions inclusive of the following boiler types:

Please note:

A single Range Statement has been prepared to cover all Units in Steam Generation. The actual context/conditions for each Unit would be drawn from the mill's customised version of this Range Statement.

. fire tube

. saturated boiler

. water tube

. super heated

and may be operated in conjunction with other steam driven plant and operations including:

. paper making machines

. turbines

. digesters

. heating plant

Materials/supplies:

. chemicals

. coal

. oil

. gas

. additives

. air

. water

. wood waste

. steam

. recovery process products

. power

Equipment:

Equipment appropriate to steam generation processes and may include the following:

. boiler and auxiliary plant

. boiler heating systems

. fuel and fuel delivery system plant

. dust removal and combustion waste

. fuel management system

. extraction systems

. water distribution systems

. compressed air systems

. steam temperature control plant

. chemical dosing system

. water treatment system

. flare detection equipment

. hand and power tools

Legislation, policy and procedures:

. OH&S

. environmental and statutory legislation

. enterprise policies and procedures

. Standard Operating Procedures (SOP)

. appropriate boiler/pressure vessel operator certification

Documentation/procedures/reports:

. SOP

. job sheets

. grade specifications

. manufacturer's specifications

. maintenance logs

. statutory requirements

. Materials Safety Data Sheets (MSDS)

. operator's log

. process and instrument diagrams

Maintenance:

. as per site agreement

. maintenance schedules

. maintenance systems

Sampling/testing: [excludes FPPSTM3A]

. feed water quality

. assessments of process operations

Technology:

. fully automated, semi automated, manually operated plant and equipment

. enter/extract computer data, electronic screens and alarms, analogue and digital instrumentation

Communication channels:

. internal/external customers and suppliers

. statutory authorities

. team members

. maintenance/services co-ordinators

. maintenance services

The competencies described in this group of units relate to those functions inclusive of the following boiler types:

Please note:

A single Range Statement has been prepared to cover all Units in Steam Generation. The actual context/conditions for each Unit would be drawn from the mill's customised version of this Range Statement.

. fire tube

. saturated boiler

. water tube

. super heated

and may be operated in conjunction with other steam driven plant and operations including:

. paper making machines

. turbines

. digesters

. heating plant

Materials/supplies:

. chemicals

. coal

. oil

. gas

. additives

. air

. water

. wood waste

. steam

. recovery process products

. power

Equipment:

Equipment appropriate to steam generation processes and may include the following:

. boiler and auxiliary plant

. boiler heating systems

. fuel and fuel delivery system plant

. dust removal and combustion waste

. fuel management system

. extraction systems

. water distribution systems

. compressed air systems

. steam temperature control plant

. chemical dosing system

. water treatment system

. flare detection equipment

. hand and power tools

Legislation, policy and procedures:

. OH&S

. environmental and statutory legislation

. enterprise policies and procedures

. Standard Operating Procedures (SOP)

. appropriate boiler/pressure vessel operator certification

Documentation/procedures/reports:

. SOP

. job sheets

. grade specifications

. manufacturer's specifications

. maintenance logs

. statutory requirements

. Materials Safety Data Sheets (MSDS)

. operator's log

. process and instrument diagrams

Maintenance:

. as per site agreement

. maintenance schedules

. maintenance systems

Sampling/testing: [excludes FPPSTM3A]

. feed water quality

. assessments of process operations

Technology:

. fully automated, semi automated, manually operated plant and equipment

. enter/extract computer data, electronic screens and alarms, analogue and digital instrumentation

Communication channels:

. internal/external customers and suppliers

. statutory authorities

. team members

. maintenance/services co-ordinators

. maintenance services