The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for assembly
|
|
Review work order and construction plans and where required check with appropriate personnel. Completed |
Evidence:
|
Identify and obtain type and quantity of assembly material and hardware. Completed |
Evidence:
|
Select appropriate personal protective and other equipment and check for operational effectiveness. Completed |
Evidence:
|
Identify and prepare setup jigs required for construction. Completed |
Evidence:
|
Set up components
|
|
Select timber components from pre-cut material in line with cutting list. Completed |
Evidence:
|
Reject material with defects and dipose of these in line with environmental protection practices. Completed |
Evidence:
|
Use equipment in line with organisational safety procedures, manufacturer’s instructions and environmental protection practices. Completed |
Evidence:
|
Position and clamp components in jigs ready for joining with allowable faults, joins and grain in line with construction standards and grading rules. Completed |
Evidence:
|
Nail components to maintain temporary alignment during assembly. Completed |
Evidence:
|
Install assembly hardware
|
|
Position and install hardware on joints in line with construction plan. Completed |
Evidence:
|
Nail or staple temporary bracing to product in line with construction standards. Completed |
Evidence:
|
Correct assembly faults in line with organisational procedures. Completed |
Evidence:
|
Prepare products for despatch and report
|
|
Check finished product for quality and label in line with work order. Completed |
Evidence:
|
Remove components from jigs and safely stack in designated location. Completed |
Evidence:
|
Strap, pack, label and pre-sling finished products ready for transportation. Completed |
Evidence:
|
Avoid wastage of strapping and packaging materials and maximise use of recycled materials. Completed |
Evidence:
|
Record and report production outcomes and equipment faults to appropriate personnel. Completed |