NTISthis.com

Evidence Guide: FWPHAR3228 - Operate loader

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FWPHAR3228 - Operate loader

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to operate a loader

  1. Review production plan, confirm its targets for felling and processing and assess wood flow requirements to ensure efficient machine operation and overall productivity
  2. Confirm type, size and quantity of logs or slash to be clamped to ensure that loads and machine are in line with safe working requirements and industry standards for operations
  3. Confirm, identify and report health, safety, environmental and heritage risks of operation in line with standard operating procedures and site safety and environmental management plans
  4. Apply risk control measures in line with standard operating procedures, site operational plan, legislative requirements and industry standards to eliminate or minimise risks
  5. Identify emergency plan procedures to follow in the event of an emergency
  6. Use production plan to identify layout of landing or roadside area and access to logs for efficient process and minimum interference with other forestry operations
  7. Assess terrain characteristics to establish machine stability
  8. Carry out pre-operational checks on machine in line with workplace procedures or manufacturers' recommendations to ensure optimal production performance and operational effectiveness
Review production plan, confirm its targets for felling and processing and assess wood flow requirements to ensure efficient machine operation and overall productivity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm type, size and quantity of logs or slash to be clamped to ensure that loads and machine are in line with safe working requirements and industry standards for operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm, identify and report health, safety, environmental and heritage risks of operation in line with standard operating procedures and site safety and environmental management plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply risk control measures in line with standard operating procedures, site operational plan, legislative requirements and industry standards to eliminate or minimise risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify emergency plan procedures to follow in the event of an emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use production plan to identify layout of landing or roadside area and access to logs for efficient process and minimum interference with other forestry operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess terrain characteristics to establish machine stability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out pre-operational checks on machine in line with workplace procedures or manufacturers' recommendations to ensure optimal production performance and operational effectiveness

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate loader to load log trucks and/or sort log stacks

  1. Use industry-accepted warning signs, vehicle-to-vehicle communication systems and procedures to maintain communication and workplace safety during operation
  2. Position loader for stability and safe access to logs/slash, by adjusting the technique in response to terrain conditions
  3. Use machine cabin controls to clamp bunches of logs/slash, and load trucks and/or sort stacks, while ensuring that the bunch size is suited to the log clamp capacity and terrain conditions
  4. Systematically load trucks and/or construct log/slash stacks by using handling techniques to avoid log damage in line with the production plan requirements and ensure safety and stability of truck and/or stacks
  5. Use appropriate techniques to maintain log product separation in the truck when multiple product grades are loaded or in line with the production plan requirements
  6. Drive the machine and manoeuvre log clamp safely and efficiently to avoid logs, machine and environment damage in line with the production plan requirements
  7. Ensure all merchantable product and/or slash from the site is loaded or sorted in line with the production plan requirements
Use industry-accepted warning signs, vehicle-to-vehicle communication systems and procedures to maintain communication and workplace safety during operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position loader for stability and safe access to logs/slash, by adjusting the technique in response to terrain conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use machine cabin controls to clamp bunches of logs/slash, and load trucks and/or sort stacks, while ensuring that the bunch size is suited to the log clamp capacity and terrain conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Systematically load trucks and/or construct log/slash stacks by using handling techniques to avoid log damage in line with the production plan requirements and ensure safety and stability of truck and/or stacks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use appropriate techniques to maintain log product separation in the truck when multiple product grades are loaded or in line with the production plan requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drive the machine and manoeuvre log clamp safely and efficiently to avoid logs, machine and environment damage in line with the production plan requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure all merchantable product and/or slash from the site is loaded or sorted in line with the production plan requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Segregate and stack stems and/or logs

  1. Visually assess and measure products for size, species and quality characteristics at the felling site and during staking at the roadside or landing bay, to ensure they are placed in the appropriate stack and in line with the production plan requirements
  2. Mark and report logs that cannot be clearly and safely assessed in line with the production plan requirements
  3. Position and construct stacks of stems or logs to avoid product damage, provide stability, restrict height for efficient extraction and facilitate safe access and conduct of other landing and machine operations in line with worksite layout and production plan requirements
  4. Maintain stack separation and identification to ensure products are correctly presented on roadside and/or landing bay for an optimum transport and logistics cycle time in line with industry standards and production plan requirements
  5. Clean area of all debris resulting from loader operation in line with resource management policies
Visually assess and measure products for size, species and quality characteristics at the felling site and during staking at the roadside or landing bay, to ensure they are placed in the appropriate stack and in line with the production plan requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mark and report logs that cannot be clearly and safely assessed in line with the production plan requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position and construct stacks of stems or logs to avoid product damage, provide stability, restrict height for efficient extraction and facilitate safe access and conduct of other landing and machine operations in line with worksite layout and production plan requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain stack separation and identification to ensure products are correctly presented on roadside and/or landing bay for an optimum transport and logistics cycle time in line with industry standards and production plan requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean area of all debris resulting from loader operation in line with resource management policies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out machine operator maintenance

  1. Park, shut-down, de-energise and isolate loader in line with workplace procedures or manufacturers' recommendations
  2. Clean, check and carry out routine maintenance tasks on loader to maintain optimum operational performance
  3. Identify and report machine faults, malfunctions or problems in line with workplace procedures or manufacturers' recommendations
  4. Clean work area and dispose of or recycle waste materials in line with site environmental management plan
  5. Record loader operations and maintenance activities
Park, shut-down, de-energise and isolate loader in line with workplace procedures or manufacturers' recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check and carry out routine maintenance tasks on loader to maintain optimum operational performance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and report machine faults, malfunctions or problems in line with workplace procedures or manufacturers' recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean work area and dispose of or recycle waste materials in line with site environmental management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record loader operations and maintenance activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge