NTISthis.com

Evidence Guide: FWPHAR4202 - Coordinate log recovery (hook tender)

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FWPHAR4202 - Coordinate log recovery (hook tender)

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for hook tender operations

  1. Review work plan and where appropriate check with appropriate personnel.
  2. Identify required type and quantity of cable recovery equipment and assess for safety and environmental protection practices.
  3. Select appropriate equipment and check for operational effectiveness in line with manufacturer's recommendations
  4. Plan cable operation activities in line with workplace health and safety (WHS) procedures and work plan.
Review work plan and where appropriate check with appropriate personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify required type and quantity of cable recovery equipment and assess for safety and environmental protection practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select appropriate equipment and check for operational effectiveness in line with manufacturer's recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan cable operation activities in line with workplace health and safety (WHS) procedures and work plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan cable system layout

  1. Obtain and evaluate information to plan cable system layout and inspect site for hazards and factors affecting harvesting operations.
  2. Provide personnel with information about landing location and size, hauling boundaries, access routes and construction requirements.
  3. Consider code of practice, site topography, minimising system design additions and select cable system type to optimise log extraction rate.
  4. Identify general requirements for anchor points, backline and intermediate supports and provide instruction to fallers.
Obtain and evaluate information to plan cable system layout and inspect site for hazards and factors affecting harvesting operations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide personnel with information about landing location and size, hauling boundaries, access routes and construction requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Consider code of practice, site topography, minimising system design additions and select cable system type to optimise log extraction rate.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify general requirements for anchor points, backline and intermediate supports and provide instruction to fallers.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate yarder and cable system set up

  1. Select rope sizes for lines in line with code of practice, yarder capacity and system design.
  2. Select components and rigging to meet code of practice requirements and system design.
  3. Inspect and install components and lines.
  4. Direct and assist personnel to layout lines, select anchors and position mobile backstops.
  5. Assess felled trees for location, size and obstructions; plan recovery extraction sequence to minimise line shifts, log and environmental damage.
  6. Select support trees and provide directions for rigging.
  7. Check unloaded and loaded system performance and calculate loads to ensure they are within system and equipment capacity.
  8. Monitor operations, change and communicate procedures or system design to improve safety and payload efficiency.
Select rope sizes for lines in line with code of practice, yarder capacity and system design.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select components and rigging to meet code of practice requirements and system design.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and install components and lines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Direct and assist personnel to layout lines, select anchors and position mobile backstops.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess felled trees for location, size and obstructions; plan recovery extraction sequence to minimise line shifts, log and environmental damage.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select support trees and provide directions for rigging.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check unloaded and loaded system performance and calculate loads to ensure they are within system and equipment capacity.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor operations, change and communicate procedures or system design to improve safety and payload efficiency.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate rigging of spars, towers and trees

  1. Check cable system plans and determine operational requirements for tower, spars and support trees.
  2. Ensure rigging of spars, towers and trees complies with code of practice.
  3. Check and select spars or support trees to be rigged, guylines and anchor points.
  4. Select rigging and rope sizes to meet load.
  5. Provide directions to check components for wear, failure or missing parts prior to rigging; identify faults and take corrective action.
  6. Coordinate rigging on machine towers to prepare, assemble and fit operational lines, prior to raising, in line with system design.
  7. Identify climbing and pass line equipment.
  8. Coordinate guyline positioning and rigging within location angle requirements to provide minimal difference in length and tension.
  9. Check system components for size, safe working load, layout, position, safety straps, joins, lead angles and operating angles.
Check cable system plans and determine operational requirements for tower, spars and support trees.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure rigging of spars, towers and trees complies with code of practice.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check and select spars or support trees to be rigged, guylines and anchor points.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select rigging and rope sizes to meet load.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide directions to check components for wear, failure or missing parts prior to rigging; identify faults and take corrective action.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate rigging on machine towers to prepare, assemble and fit operational lines, prior to raising, in line with system design.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify climbing and pass line equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate guyline positioning and rigging within location angle requirements to provide minimal difference in length and tension.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check system components for size, safe working load, layout, position, safety straps, joins, lead angles and operating angles.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate line shifts and rigging modifications

  1. Anticipate line shifts and prepare required rigging in advance.
  2. Diagnose limitations of system design or positioning and plan modifications in line with code of practice.
  3. Monitor operations; change and communicate procedures to improve safety and payload efficiency.
  4. Locate new support trees, anchor points and mobile tail anchor position; assign riggers to prepare and rig in line with system requirements.
  5. Record and report breakout processes and equipment faults in line with site procedures.
Anticipate line shifts and prepare required rigging in advance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Diagnose limitations of system design or positioning and plan modifications in line with code of practice.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor operations; change and communicate procedures to improve safety and payload efficiency.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate new support trees, anchor points and mobile tail anchor position; assign riggers to prepare and rig in line with system requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record and report breakout processes and equipment faults in line with site procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1. Prepare for hook tender operations

1.1 Review work plan and where appropriate check with appropriate personnel.

1.2 Identify required type and quantity of cable recovery equipment and assess for safety and environmental protection practices.

1.3 Select appropriate equipment and check for operational effectiveness in line with manufacturer's recommendations

1.4 Plan cable operation activities in line with workplace health and safety (WHS) procedures and work plan.

2. Plan cable system layout

2.1 Obtain and evaluate information to plan cable system layout and inspect site for hazards and factors affecting harvesting operations.

2.2 Provide personnel with information about landing location and size, hauling boundaries, access routes and construction requirements.

2.3 Consider code of practice, site topography, minimising system design additions and select cable system type to optimise log extraction rate.

2.4 Identify general requirements for anchor points, backline and intermediate supports and provide instruction to fallers.

3. Coordinate yarder and cable system set up

3.1 Select rope sizes for lines in line with code of practice, yarder capacity and system design.

3.2 Select components and rigging to meet code of practice requirements and system design.

3.3 Inspect and install components and lines.

3.4 Direct and assist personnel to layout lines, select anchors and position mobile backstops.

3.5 Assess felled trees for location, size and obstructions; plan recovery extraction sequence to minimise line shifts, log and environmental damage.

3.6 Select support trees and provide directions for rigging.

3.7 Check unloaded and loaded system performance and calculate loads to ensure they are within system and equipment capacity.

3.8 Monitor operations, change and communicate procedures or system design to improve safety and payload efficiency.

4. Coordinate rigging of spars, towers and trees

4.1 Check cable system plans and determine operational requirements for tower, spars and support trees.

4.2 Ensure rigging of spars, towers and trees complies with code of practice.

4.3 Check and select spars or support trees to be rigged, guylines and anchor points.

4.4 Select rigging and rope sizes to meet load.

4.5 Provide directions to check components for wear, failure or missing parts prior to rigging; identify faults and take corrective action.

4.6 Coordinate rigging on machine towers to prepare, assemble and fit operational lines, prior to raising, in line with system design.

4.7 Identify climbing and pass line equipment.

4.8 Coordinate guyline positioning and rigging within location angle requirements to provide minimal difference in length and tension.

4.9 Check system components for size, safe working load, layout, position, safety straps, joins, lead angles and operating angles.

5. Coordinate line shifts and rigging modifications

5.1 Anticipate line shifts and prepare required rigging in advance.

5.2 Diagnose limitations of system design or positioning and plan modifications in line with code of practice.

5.3 Monitor operations; change and communicate procedures to improve safety and payload efficiency.

5.4 Locate new support trees, anchor points and mobile tail anchor position; assign riggers to prepare and rig in line with system requirements.

5.5 Record and report breakout processes and equipment faults in line with site procedures.

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1. Prepare for hook tender operations

1.1 Review work plan and where appropriate check with appropriate personnel.

1.2 Identify required type and quantity of cable recovery equipment and assess for safety and environmental protection practices.

1.3 Select appropriate equipment and check for operational effectiveness in line with manufacturer's recommendations

1.4 Plan cable operation activities in line with workplace health and safety (WHS) procedures and work plan.

2. Plan cable system layout

2.1 Obtain and evaluate information to plan cable system layout and inspect site for hazards and factors affecting harvesting operations.

2.2 Provide personnel with information about landing location and size, hauling boundaries, access routes and construction requirements.

2.3 Consider code of practice, site topography, minimising system design additions and select cable system type to optimise log extraction rate.

2.4 Identify general requirements for anchor points, backline and intermediate supports and provide instruction to fallers.

3. Coordinate yarder and cable system set up

3.1 Select rope sizes for lines in line with code of practice, yarder capacity and system design.

3.2 Select components and rigging to meet code of practice requirements and system design.

3.3 Inspect and install components and lines.

3.4 Direct and assist personnel to layout lines, select anchors and position mobile backstops.

3.5 Assess felled trees for location, size and obstructions; plan recovery extraction sequence to minimise line shifts, log and environmental damage.

3.6 Select support trees and provide directions for rigging.

3.7 Check unloaded and loaded system performance and calculate loads to ensure they are within system and equipment capacity.

3.8 Monitor operations, change and communicate procedures or system design to improve safety and payload efficiency.

4. Coordinate rigging of spars, towers and trees

4.1 Check cable system plans and determine operational requirements for tower, spars and support trees.

4.2 Ensure rigging of spars, towers and trees complies with code of practice.

4.3 Check and select spars or support trees to be rigged, guylines and anchor points.

4.4 Select rigging and rope sizes to meet load.

4.5 Provide directions to check components for wear, failure or missing parts prior to rigging; identify faults and take corrective action.

4.6 Coordinate rigging on machine towers to prepare, assemble and fit operational lines, prior to raising, in line with system design.

4.7 Identify climbing and pass line equipment.

4.8 Coordinate guyline positioning and rigging within location angle requirements to provide minimal difference in length and tension.

4.9 Check system components for size, safe working load, layout, position, safety straps, joins, lead angles and operating angles.

5. Coordinate line shifts and rigging modifications

5.1 Anticipate line shifts and prepare required rigging in advance.

5.2 Diagnose limitations of system design or positioning and plan modifications in line with code of practice.

5.3 Monitor operations; change and communicate procedures to improve safety and payload efficiency.

5.4 Locate new support trees, anchor points and mobile tail anchor position; assign riggers to prepare and rig in line with system requirements.

5.5 Record and report breakout processes and equipment faults in line with site procedures.

A person demonstrating competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit. If a specific volume or frequency is not stated below, then evidence must be provided that the following requirements have been performed on at least one occasion:

safely and efficiently design, plan and coordinate the establishment of cable recovery systems

follow organisational policies and procedures relevant to coordinating log recovery (hook tender)

coordinate hook tender operations

establish these types of cable recovery systems:

high lead (no skyline)

standing skyline

running skyline

coordinate line shifts

establish these types of lines:

extensions

guylines

haulback lines

mainlines

skylines

strawlines

establish these types of anchors:

block stumps

mobile backstops

tailholds.

A person competent in this unit must be able to demonstrate knowledge of:

content and application of applicable state or territory code of practice for log recovery activities

key features of these varying environmental conditions and effects on the layout, set up and operation of cable systems for log recovery:

fallen trees

general forest lean

ground growth

ground hazards and obstacles

ground slope

density of trees

wet and adverse weather conditions

wind speed and direction

environmental protection practices for forest and forest farm settings:

safe disposal of waste material

cleaning of plant, tools and equipment

soil and water protection

industry standard lengths for logs

operational planning processes for:

designing and coordinating the establishment of cable recovery systems

determining the most time and cost effective method of log recovery

techniques used in cable log recovery:

log extraction methods

rigging techniques

typical industry chain of command for communication of information and instruction

purpose, features and operation of cable logging system and rigging components:

cable systems:

high lead (no skyline)

standing skyline

running skyline

system design additions:

blind leads

bridling

multispans

yarders and anchors:

anchors

block stumps

mobile backstops

tailholds

lines:

extensions

guylines

haulback lines

mainlines

skylines

strawlines

towers

spars and support trees

organisational procedures specific to cable log recovery coordination:

workplace health and safety with particular emphasis on use of equipment

communication reporting lines during set up and operation of cable systems for log recovery

recording and reporting breakout process and equipment faults.

Range Statement

Not Applicable