Evidence Guide: FWPHAR4203 - Design log landings and snig tracks

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FWPHAR4203 - Design log landings and snig tracks

What evidence can you provide to prove your understanding of each of the following citeria?

Plan landing and recovery requirements

  1. Analyse workplace health and safety (WHS) and regulatory requirements, standards and codes of practice for the design, construction and operation of landings and snig tracks.
  2. Obtain and assess information on logging methods, topography and environmental management considerations for site.
  3. Identify landing location and construction requirements from harvest plan and inspect site to assess factors affecting operations.
  4. Identify timeframe for use of site and likely weather conditions.
  5. Calculate and document log extraction methods and storage requirements for landings, roads, tracks, equipment placement, falling and recovery rates and delivery schedules.
Analyse workplace health and safety (WHS) and regulatory requirements, standards and codes of practice for the design, construction and operation of landings and snig tracks.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and assess information on logging methods, topography and environmental management considerations for site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify landing location and construction requirements from harvest plan and inspect site to assess factors affecting operations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify timeframe for use of site and likely weather conditions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Calculate and document log extraction methods and storage requirements for landings, roads, tracks, equipment placement, falling and recovery rates and delivery schedules.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design landing and snig tracks

  1. Calculate specific landing site size and level to meet operational requirements, optimise construction time and minimise environmental damage.
  2. Plan number and location of snig tracks to optimise track clearing and construction time, log handling capacity and minimise environmental damage.
  3. Locate track and road entry points to landing in line with harvest plan, log handling procedures, vehicle and equipment access, turning and loading space requirements.
  4. Design landing and track to provide for available equipment and access for construction.
  5. Plan and document restoration of land on completion of operations.
  6. Document landing design and track locations in line with regulation.
  7. Record design and development process and report to appropriate personnel.
Calculate specific landing site size and level to meet operational requirements, optimise construction time and minimise environmental damage.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan number and location of snig tracks to optimise track clearing and construction time, log handling capacity and minimise environmental damage.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate track and road entry points to landing in line with harvest plan, log handling procedures, vehicle and equipment access, turning and loading space requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design landing and track to provide for available equipment and access for construction.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and document restoration of land on completion of operations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document landing design and track locations in line with regulation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record design and development process and report to appropriate personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate landing and track development

  1. Communicate landing and snig track design and construction plan to site personnel to enable preparation.
  2. Develop operational procedures for tracks and landings with site personnel.
  3. Provide technical assistance to site personnel for construction of landing and tracks.
  4. Monitor construction of landing and tracks; review and modify design to account for unexpected ground, water, vegetation or other environmental conditions.
Communicate landing and snig track design and construction plan to site personnel to enable preparation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop operational procedures for tracks and landings with site personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide technical assistance to site personnel for construction of landing and tracks.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor construction of landing and tracks; review and modify design to account for unexpected ground, water, vegetation or other environmental conditions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

Elements describe the essential outcomes.

PERFORMANCE CRITERIA

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1. Plan landing and recovery requirements

1.1 Analyse workplace health and safety (WHS) and regulatory requirements, standards and codes of practice for the design, construction and operation of landings and snig tracks.

1.2 Obtain and assess information on logging methods, topography and environmental management considerations for site.

1.3 Identify landing location and construction requirements from harvest plan and inspect site to assess factors affecting operations.

1.4 Identify timeframe for use of site and likely weather conditions.

1.5 Calculate and document log extraction methods and storage requirements for landings, roads, tracks, equipment placement, falling and recovery rates and delivery schedules.

2. Design landing and snig tracks

2.1 Calculate specific landing site size and level to meet operational requirements, optimise construction time and minimise environmental damage.

2.2 Plan number and location of snig tracks to optimise track clearing and construction time, log handling capacity and minimise environmental damage.

2.3 Locate track and road entry points to landing in line with harvest plan, log handling procedures, vehicle and equipment access, turning and loading space requirements.

2.4 Design landing and track to provide for available equipment and access for construction.

2.5 Plan and document restoration of land on completion of operations.

2.6 Document landing design and track locations in line with regulation.

2.7 Record design and development process and report to appropriate personnel.

3. Coordinate landing and track development

3.1 Communicate landing and snig track design and construction plan to site personnel to enable preparation.

3.2 Develop operational procedures for tracks and landings with site personnel.

3.3 Provide technical assistance to site personnel for construction of landing and tracks.

3.4 Monitor construction of landing and tracks; review and modify design to account for unexpected ground, water, vegetation or other environmental conditions.

Required Skills and Knowledge

ELEMENTS

Elements describe the essential outcomes.

PERFORMANCE CRITERIA

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1. Plan landing and recovery requirements

1.1 Analyse workplace health and safety (WHS) and regulatory requirements, standards and codes of practice for the design, construction and operation of landings and snig tracks.

1.2 Obtain and assess information on logging methods, topography and environmental management considerations for site.

1.3 Identify landing location and construction requirements from harvest plan and inspect site to assess factors affecting operations.

1.4 Identify timeframe for use of site and likely weather conditions.

1.5 Calculate and document log extraction methods and storage requirements for landings, roads, tracks, equipment placement, falling and recovery rates and delivery schedules.

2. Design landing and snig tracks

2.1 Calculate specific landing site size and level to meet operational requirements, optimise construction time and minimise environmental damage.

2.2 Plan number and location of snig tracks to optimise track clearing and construction time, log handling capacity and minimise environmental damage.

2.3 Locate track and road entry points to landing in line with harvest plan, log handling procedures, vehicle and equipment access, turning and loading space requirements.

2.4 Design landing and track to provide for available equipment and access for construction.

2.5 Plan and document restoration of land on completion of operations.

2.6 Document landing design and track locations in line with regulation.

2.7 Record design and development process and report to appropriate personnel.

3. Coordinate landing and track development

3.1 Communicate landing and snig track design and construction plan to site personnel to enable preparation.

3.2 Develop operational procedures for tracks and landings with site personnel.

3.3 Provide technical assistance to site personnel for construction of landing and tracks.

3.4 Monitor construction of landing and tracks; review and modify design to account for unexpected ground, water, vegetation or other environmental conditions.

A person demonstrating competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit. If a specific volume or frequency is not stated below, then evidence must be provided that the following requirements have been performed on at least one occasion:

designing log landings and snig tracks in line with regulatory requirements, the work order and within prescribed organisational tolerances

planning the layout of the landing and snig tracks in line with site conditions

coordinating the development of the landing and snig tracks

design and coordinate the development of these types of snig tracks:

emergency escape routes

equipment access tracks

hauling tracks

vehicular tracks

A person competent in this unit must be able to demonstrate knowledge of:

content and application of applicable commonwealth, state, territory or local government regulations for the design, construction and operation of landings and snig tracks

cable log recovery operations and log extraction methods

key features of these varying environmental conditions and effects on the design and construction of landings and snig tracks:

fallen trees

general forest lean

ground growth

ground hazards and obstacles

ground slope

density of trees

wet and adverse weather conditions

environmental protection practices for forest and forest farm settings:

minimising temporary, short-term, long-term and permanent damage to natural vegetation and landscape

soil and water protection

returning the environment to its original or near to original condition on completion of operations

purpose, features and operational requirements of these types of snig tracks:

emergency escape routes

equipment access tracks

hauling tracks

vehicular tracks

purpose, features and operational requirements of:

landings

vehicles and equipment used on landings and snig tracks

processes for:

designing and coordinating the development of landings and snig tracks

determining the most time and cost effective plan for construction

typical industry chain of command for communication of information, instruction and technical advice

organisational standards, policies and procedures for the design, construction and operation of landings and snig tracks:

workplace health and safety specific to the use of landings and snig tracks

environmental protection

documenting designs for landings and snig tracks

recording and reporting the design and implementation process.