The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for assembly
|
|
Review construction plans and work order and where required clarify with appropriate personnel. Completed |
Evidence:
|
Identify and obtain type and quantity of material and nail plates to be assembled. Completed |
Evidence:
|
Select appropriate tools and equipment and check for operational effectiveness in line with manufacturer's recommendations. Completed |
Evidence:
|
Identify and prepare set-up jigs required for construction. Completed |
Evidence:
|
Assemble materials
|
|
Select timber components from pre-cut material in line with cutting list. Completed |
Evidence:
|
Reject material with defects and dispose of in line with environmental protection practices. Completed |
Evidence:
|
Use equipment in line with organisational safety procedures, manufacturer’s instructions environmental protection practices. Completed |
Evidence:
|
Identify allowable number and position of joins from construction plan. Completed |
Evidence:
|
Position and clamp components in jigs ready for joining with allowable faults, joins and grain in line with construction standards and grading rules. Completed |
Evidence:
|
Staple components to maintain temporary alignment during assembly. Completed |
Evidence:
|
Install nail plates
|
|
Position material and nail plate press over joints. Completed |
Evidence:
|
Position nail plates on joints and install in line with construction plan. Completed |
Evidence:
|
Repair or dispose of substandard and damaged nail plates in line with environmental protection practices. Completed |
Evidence:
|
Correct assembly faults in line with organisational procedures Completed |
Evidence:
|
Identify routine processing and equipment faults and resolve or report to appropriate personnel. Completed |
Evidence:
|
Prepare material for despatch and report outcomes
|
|
Check finished material for quality and label in line with work order. Completed |
Evidence:
|
Remove components from jigs and safely stack in designated location. Completed |
Evidence:
|
Strap, pack and label finished material ready for transportation. Completed |
Evidence:
|
Avoid wastage of strapping and packaging materials and maximise use of recycled materials. Completed |
Evidence:
|
Complete production and quality records and report in line with organisational procedures. Completed |
Evidence:
|