NTISthis.com

Evidence Guide: FWPSAW3254 - Control and monitor automated green mill saw line

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FWPSAW3254 - Control and monitor automated green mill saw line

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to control and monitor green mill automated saw line

  1. Determine job requirements from work order or instructions and, where required, check with appropriate personnel
  2. Review workplace health and safety and environmental protection procedures for work activity
  3. Identify and assess hazards and take actions to mitigate risks related to saw line operations
  4. Confirm emergency procedures and actions to be taken in the event of an emergency situation
Determine job requirements from work order or instructions and, where required, check with appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review workplace health and safety and environmental protection procedures for work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and assess hazards and take actions to mitigate risks related to saw line operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm emergency procedures and actions to be taken in the event of an emergency situation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Configure green mill automated saw line optimising program

  1. Set optimising program to job specifications
  2. Conduct trial runs to check system operation, accuracy and quality of finished work
  3. Complete final adjustments to optimising program
Set optimising program to job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct trial runs to check system operation, accuracy and quality of finished work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete final adjustments to optimising program

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Control and monitor green mill automated saw line

  1. Start up and log onto control and data acquisition system to operate saw line
  2. Feed logs into saw line
  3. Monitor sawing operation through control and data acquisition system and make system adjustments to meet production output, product quality and maximum recovery
  4. Identify and correct minor deviations to normal operating parameters of saw line
  5. Report non-routine processing and equipment problems to relevant personnel
Start up and log onto control and data acquisition system to operate saw line

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Feed logs into saw line

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor sawing operation through control and data acquisition system and make system adjustments to meet production output, product quality and maximum recovery

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and correct minor deviations to normal operating parameters of saw line

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report non-routine processing and equipment problems to relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain process control and data acquisition system for green mill automated saw line

  1. Conduct routine planned inspections of control and data acquisition system according to manufacturer requirements
  2. Report faults and maintenance requirements to relevant personnel
Conduct routine planned inspections of control and data acquisition system according to manufacturer requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report faults and maintenance requirements to relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge