The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Apply workplace health and safety during on-site installation
|
|
Obtain all workplace health and safety information to ensure that activities are performed safely Completed |
Evidence:
|
Identify workplace and task-specific hazards and report accidents, incidents or near misses during on-site installation according to workplace health and safety requirements to maintain a safe workplace Completed |
Evidence:
|
Identify and use required risk-control and safety measures and equipment according to workplace health and safety requirements Completed |
Evidence:
|
Plan and prepare for installation work
|
|
Obtain and review relevant workplace information, including task instructions, drawings, design specifications, schedules and manufacturer information, and seek clarification if necessary Completed |
Evidence:
|
Confirm installation timeframe and sequence with relevant stakeholders or personnel to meet design specifications and on-site work schedules Completed |
Evidence:
|
Review drawings and design specifications to identify the type, location and quantity requirements for fixings, connections and bracing Completed |
Evidence:
|
Check building structure, slab or floor area and report non-conformance as per workplace processes Completed |
Evidence:
|
Select tools, auxiliary materials and equipment for the installation of prefabricated timber building systems as required, and set up equipment to meet safe work requirements Completed |
Evidence:
|
Obtain information needed to ensure that the inspection, use, maintenance and storage of equipment comply with manufacturer directions Completed |
Evidence:
|
Maintain appropriate ongoing communications and briefings with key stakeholders, including feedback and timeline reviews, for the duration of the installation Completed |
Evidence:
|
Check prefabricated timber building systems logistics and storage on-site
|
|
Ensure prefabricated timber building systems are delivered on-site in-line with the phase of the construction project and installation Completed |
Evidence:
|
Ensure there is no risk of damage by weather (moisture), traffic or general construction to prefabricated timber building systems and that they are stored as close as practically possible to the construction site when storage is required Completed |
Evidence:
|
Check prefabricated timber building systems, connections and support points for quantity, quality, tolerance compliance and conformance and damage upon delivery, and report issues to the appropriate personnel or according to operational requirements Completed |
Evidence:
|
Install prefabricated timber building systems
|
|
Use tools and equipment safely and correctly according to operational requirements and manufacturer specifications to measure, mark out, level, finish and secure prefabricated timber building systems according to specifications Completed |
Evidence:
|
Assist crane or dogger operators to lift prefabricated timber building systems in the sequential order and apply accurate placement and connection techniques to the required tolerances and specifications Completed |
Evidence:
|
Check corners and walls to ensure they are accurately levelled, plumbed and squared according to specifications and operational requirements Completed |
Evidence:
|
Check prefabricated timber building systems after installation against critical performance metrics and apply sealants as required to ensure compliance with fire, waterproofing and acoustic requirements and with design specifications Completed |
Evidence:
|
Protect prefabricated timber building systems from damage and adverse weather conditions during the installation work and other worksite activities Completed |
Evidence:
|
Complete installation
|
|
Complete installation within the required timeframe and according to on-site work schedules Completed |
Evidence:
|
Maintain and store hand and power tools, equipment and machinery according to operational requirements Completed |
Evidence:
|
Keep work area and access areas free of debris and waste material according to operational requirements Completed |
Evidence:
|
Record any quality checks and changes or variations applied to a prefabricated timber system during the on-site installation work, according to operational requirements and communicate the process Completed |
Evidence:
|