NTISthis.com

Evidence Guide: FWPTMM4203 - Install and commission CNC software

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FWPTMM4203 - Install and commission CNC software

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for software installation

  1. Diagnose program format and operational purpose and identify specified applications.
  2. Check specifications for intended operating conditions.
  3. Check program instructions for compliance with specifications.
  4. Counter set software timers to specification.
Diagnose program format and operational purpose and identify specified applications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check specifications for intended operating conditions.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check program instructions for compliance with specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Counter set software timers to specification.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install automatic process machine control programs

  1. Select appropriate program loading technique.
  2. Connect external loading devices correctly to automatic process machine control system.
  3. Place machine control system in correct operational mode to accept program loading.
  4. Download program in line with manufacturer's recommended procedure.
  5. Check during and after downloading to ensure accurate and complete data transfer.
  6. Disconnect external program loading devices and connections from process and machine control system.
Select appropriate program loading technique.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect external loading devices correctly to automatic process machine control system.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place machine control system in correct operational mode to accept program loading.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Download program in line with manufacturer's recommended procedure.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check during and after downloading to ensure accurate and complete data transfer.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Disconnect external program loading devices and connections from process and machine control system.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission automatic process and machine control program

  1. Monitor operation of equipment using the program for accuracy and safe performance.
  2. Measure and check outputs for compliance with specifications.
  3. Check external inputs for compliance with specifications.
  4. Check total operation for compliance with specifications and resolve any issues.
  5. Identify location for storage of program master copy and store accordingly.
  6. Record installation and commissioning process and problems and report to appropriate personnel.
Monitor operation of equipment using the program for accuracy and safe performance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure and check outputs for compliance with specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check external inputs for compliance with specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check total operation for compliance with specifications and resolve any issues.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify location for storage of program master copy and store accordingly.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record installation and commissioning process and problems and report to appropriate personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1. Prepare for software installation

1.1 Diagnose program format and operational purpose and identify specified applications.

1.2 Check specifications for intended operating conditions.

1.3 Check program instructions for compliance with specifications.

1.4 Counter set software timers to specification.

2. Install automatic process machine control programs

2.1 Select appropriate program loading technique.

2.2 Connect external loading devices correctly to automatic process machine control system.

2.3 Place machine control system in correct operational mode to accept program loading.

2.4 Download program in line with manufacturer's recommended procedure.

2.5 Check during and after downloading to ensure accurate and complete data transfer.

2.6 Disconnect external program loading devices and connections from process and machine control system.

3. Commission automatic process and machine control program

3.1 Monitor operation of equipment using the program for accuracy and safe performance.

3.2 Measure and check outputs for compliance with specifications.

3.3 Check external inputs for compliance with specifications.

3.4 Check total operation for compliance with specifications and resolve any issues.

3.5 Identify location for storage of program master copy and store accordingly.

3.6 Record installation and commissioning process and problems and report to appropriate personnel.

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1. Prepare for software installation

1.1 Diagnose program format and operational purpose and identify specified applications.

1.2 Check specifications for intended operating conditions.

1.3 Check program instructions for compliance with specifications.

1.4 Counter set software timers to specification.

2. Install automatic process machine control programs

2.1 Select appropriate program loading technique.

2.2 Connect external loading devices correctly to automatic process machine control system.

2.3 Place machine control system in correct operational mode to accept program loading.

2.4 Download program in line with manufacturer's recommended procedure.

2.5 Check during and after downloading to ensure accurate and complete data transfer.

2.6 Disconnect external program loading devices and connections from process and machine control system.

3. Commission automatic process and machine control program

3.1 Monitor operation of equipment using the program for accuracy and safe performance.

3.2 Measure and check outputs for compliance with specifications.

3.3 Check external inputs for compliance with specifications.

3.4 Check total operation for compliance with specifications and resolve any issues.

3.5 Identify location for storage of program master copy and store accordingly.

3.6 Record installation and commissioning process and problems and report to appropriate personnel.

A person demonstrating competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit. If a specific volume or frequency is not stated below, then evidence must be provided that the following requirements have been performed on at least one occasion:

install and commission computer numerically controlled (CNC) software in CNC sizing machines and/or CNC machining and processing centres

check that machine is operating safely and in line with its intended purpose and program

complete a detailed and accurate report, for each installation, on the installation and commissioning process and problems encountered.

A person competent in this unit must be able to demonstrate knowledge of:

for the CNC software:

program format and operational purpose

system functions and capabilities

methods to install

methods to commission machinery to operational specification

requirements for safe storage of program master copy

for the machine being commissioned:

operational purpose and sizing specifications

methods to monitor the operation of commissioned machines and check calibration

organisational procedures for recording and reporting on installation and commissioning processes and problems.

Range Statement

Not Applicable