The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Interact with supply chain stakeholders to design prefabricated timber building systems
|
|
Communicate with the developer during the design process to ensure that prefabricated timber building system is fully fit for purpose and meets client functional requirements Completed |
Evidence:
|
Use Building Information Modelling (BIM) system or similar and conduct further collaborative analysis with the fabricator, builder, component suppliers and regulators to achieve a design configuration that allows for lean processes during all stages of timber building system life cycle, meets regulations and does not complicate other design considerations Completed |
Evidence:
|
Ensure that the design accounts for fabrication capabilities Completed |
Evidence:
|
Implement a continuous improvement process during the design life of prefabricated timber building system to report, record and resolve issues Completed |
Evidence:
|
Determine design solutions and specifications for structural compliance
|
|
Identify the National Construction Code (NCC) Performance Requirements for structural robustness, which the prefabricated timber building system and its components need to satisfy Completed |
Evidence:
|
Discuss structural design actions with appropriate stakeholders to ensure that the prefabricated timber building system meets the minimum NCC structural requirements and performs without risks when used as intended through its design life Completed |
Evidence:
|
Obtain experimental and observational data for the strength of materials, structural components, connections or assemblies to determine design values, and consult with appropriate engineers to indicate the actual robustness and reliability of the physical building system Completed |
Evidence:
|
Contribute to the design verification for structural compliance and process documentation according to the NCC, standards and codes to facilitate design certification and approvals Completed |
Evidence:
|
Determine durability requirements for the materials of prefabricated timber building system according to the nominated design life and planned maintenance, and ensure that they are specified in design documentation for prefabricators Completed |
Evidence:
|
Determine design solutions and specifications for safety compliance
|
|
Determine early in the design process hazards to health and safety during all stages of prefabricated timber building system life cycle according to the workplace health and safety laws, regulations and the NCC Completed |
Evidence:
|
Determine and apply health and safety design control measures according to standards, codes and technical guides to eliminate or minimise health and safety risks during all stages of prefabricated timber building system life cycle Completed |
Evidence:
|
Verify design documentation and ensure that health and safety provisions are specified for all stages of prefabricated timber building system life cycle according to standards, codes and technical guides Completed |
Evidence:
|
Verify design documentation and ensure that detailed maintenance provisions are specified for all components of the prefabricated timber building system being designed according to its intended functions Completed |
Evidence:
|
Determine design solutions and specifications for services
|
|
Identify the NCC Performance Requirements for fire resistance and acoustic and thermal properties, which the prefabricated timber building system and its components need to satisfy Completed |
Evidence:
|
Verify design documentation and ensure that intended materials, separations, insulations, fire warnings and fire-fighting management systems are specified for the required fire, acoustic, thermal and waterproofing performance according to standards, codes and technical guides Completed |
Evidence:
|
Use design control actions to mitigate any possible effects of transportation, handling, on-site installation or maintenance on the integrity of intended connections, insulations or materials Completed |
Evidence:
|
Determine early in the design phase where points of entry are required in the prefabricated timber building system, components and materials for services installation Completed |
Evidence:
|
Verify design documentation and ensure that installation and connections provisions are specified for each service according to standards, codes and technical guides Completed |
Evidence:
|
Ensure that all tolerances for the prefabricated timber building system and its components are specified in the design specifications according to standards to facilitate off-site manufacture and on-site installation Completed |
Evidence:
|
Verify and ensure that approval and compliance certification for installation of services, partitions and floor elements are performed to the appropriate standards for thermal, acoustic and fire performance and according to local requirements before on-site installation Completed |
Evidence:
|
Determine design solutions and specifications for transportation and on-site installation
|
|
Determine maximum dimensions and weight for the building system being designed to meet restrictions provided by vehicles, lifting plants, road configuration around the construction site and local regulations Completed |
Evidence:
|
Ensure that lifting requirements are specified for all stages of the prefabricated timber building system life cycle in the design documentation, and they are according to the NCC to facilitate and maintain prefabricated timber building system integrity and adequate performance Completed |
Evidence:
|
Determine the effects of cargo restraints and exposure to acceleration forces on the strength (structural attributes) of prefabricated timber building system during transportation, and use design control actions to allow for the forces applied Completed |
Evidence:
|
Verify the design and ensure that necessary restraint conditions during transport and residual risks to the prefabricated timber building systems resulting from transportation are specified Completed |
Evidence:
|
Ensure that the sequence for the installation of prefabricated timber building systems and components is specified in design documentation Completed |
Evidence:
|