The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

FWPWPP3220 - Plan and coordinate panel painting

What evidence can you provide to prove your understanding of each of the following citeria?

Plan painting operations

  1. Review and interpret work orders to determine production requirements.
  2. Develop painting schedules and communicate to operators in line with organisational procedures.
  3. Plan and schedule equipment settings and operations.
  4. Plan and prescribe control measures to minimise waste of paint and additives.
  5. Identify, monitor and assess variations in paint mixtures.
Review and interpret work orders to determine production requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop painting schedules and communicate to operators in line with organisational procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and schedule equipment settings and operations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prescribe control measures to minimise waste of paint and additives.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, monitor and assess variations in paint mixtures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate painting operations

  1. Direct operators to load and unload painting equipment.
  2. Coordinate paint application and curing processes and monitor for quality finish and completion rates.
  3. Check paint line performance and interpret data to ensure accuracy and intended coverage.
  4. Modify schedules to ensure optimum and cost effective production outcomes and communicate changes to operators.
  5. Coordinate the disposal of excess paint in line with environmental protection practices.
  6. Direct correct processes for cleaning painting equipment to ensure compliance with organisational safety procedures and environmental protection practices.
  7. Investigate, record and report major processing and equipment faults and resolve or report to appropriate personnel
Direct operators to load and unload painting equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate paint application and curing processes and monitor for quality finish and completion rates.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check paint line performance and interpret data to ensure accuracy and intended coverage.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Modify schedules to ensure optimum and cost effective production outcomes and communicate changes to operators.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate the disposal of excess paint in line with environmental protection practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Direct correct processes for cleaning painting equipment to ensure compliance with organisational safety procedures and environmental protection practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Investigate, record and report major processing and equipment faults and resolve or report to appropriate personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate and modify painting processes.

  1. Monitor and evaluate painting operations and output to determine process improvements.
  2. Analyse systematic problems with plant, equipment, paints and panels for potential to improve painting processes.
  3. Document recommended process improvements, communicate to appropriate personnel and seek approval.
  4. Trial new processes, document outcomes and introduce appropriate system changes.
Monitor and evaluate painting operations and output to determine process improvements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse systematic problems with plant, equipment, paints and panels for potential to improve painting processes.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document recommended process improvements, communicate to appropriate personnel and seek approval.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trial new processes, document outcomes and introduce appropriate system changes.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1. Plan painting operations

1.1 Review and interpret work orders to determine production requirements.

1.2 Develop painting schedules and communicate to operators in line with organisational procedures.

1.3 Plan and schedule equipment settings and operations.

1.4 Plan and prescribe control measures to minimise waste of paint and additives.

1.5 Identify, monitor and assess variations in paint mixtures.

2. Coordinate painting operations

2.1 Direct operators to load and unload painting equipment.

2.2 Coordinate paint application and curing processes and monitor for quality finish and completion rates.

2.3 Check paint line performance and interpret data to ensure accuracy and intended coverage.

2.4 Modify schedules to ensure optimum and cost effective production outcomes and communicate changes to operators.

2.5 Coordinate the disposal of excess paint in line with environmental protection practices.

2.6 Direct correct processes for cleaning painting equipment to ensure compliance with organisational safety procedures and environmental protection practices.

2.7 Investigate, record and report major processing and equipment faults and resolve or report to appropriate personnel

3. Evaluate and modify painting processes.

3.1 Monitor and evaluate painting operations and output to determine process improvements.

3.2 Analyse systematic problems with plant, equipment, paints and panels for potential to improve painting processes.

3.3 Document recommended process improvements, communicate to appropriate personnel and seek approval.

3.4 Trial new processes, document outcomes and introduce appropriate system changes.

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1. Plan painting operations

1.1 Review and interpret work orders to determine production requirements.

1.2 Develop painting schedules and communicate to operators in line with organisational procedures.

1.3 Plan and schedule equipment settings and operations.

1.4 Plan and prescribe control measures to minimise waste of paint and additives.

1.5 Identify, monitor and assess variations in paint mixtures.

2. Coordinate painting operations

2.1 Direct operators to load and unload painting equipment.

2.2 Coordinate paint application and curing processes and monitor for quality finish and completion rates.

2.3 Check paint line performance and interpret data to ensure accuracy and intended coverage.

2.4 Modify schedules to ensure optimum and cost effective production outcomes and communicate changes to operators.

2.5 Coordinate the disposal of excess paint in line with environmental protection practices.

2.6 Direct correct processes for cleaning painting equipment to ensure compliance with organisational safety procedures and environmental protection practices.

2.7 Investigate, record and report major processing and equipment faults and resolve or report to appropriate personnel

3. Evaluate and modify painting processes.

3.1 Monitor and evaluate painting operations and output to determine process improvements.

3.2 Analyse systematic problems with plant, equipment, paints and panels for potential to improve painting processes.

3.3 Document recommended process improvements, communicate to appropriate personnel and seek approval.

3.4 Trial new processes, document outcomes and introduce appropriate system changes.

A person demonstrating competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit. If a specific volume or frequency is not stated below, then evidence must be provided that the following requirements have been performed on at least one occasion:

plan and coordinate panel painting operations for production jobs in line with different work orders for each job

determine, document and communicate painting schedules for each of the above jobs

monitor, assess and modify schedules in response to changing circumstances within each of the above production jobs

complete a detailed report about systematic issues arising across the jobs covering problems with processes, plant, equipment, paints and panels including recommendations for process improvements.

A person competent in this unit must be able to demonstrate knowledge of:

environmental protection practices for painting panels:

reducing water and energy use

cleaning plant, tools and equipment

disposing of hazardous substances

operational capacity of and cleaning requirements for painting production lines:

roller coating lines

spray booths

curtain coating lines

stages in the painting production line process

methods of determining painting schedules to maximise:

equipment and labour use

volume return from paint

efficient handling of panels to be painted

control measures to minimise waste of paint and additives

methods used to:

assess painting processes for quality of outcomes

diagnose and analyse systematic problems with plant, equipment, paints and panels

format, content and use of:

painting schedules

process improvement reports

organisational procedures specific to planning and coordinating panel painting operations:

communication reporting lines for paint operator team members and self

documenting painting schedules and reports

recording and reporting systematic equipment faults.

Range Statement