The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for pressing.
|
|
Review and check work order with appropriate personnel. Completed |
Evidence:
|
Identify hazards and control risk in the work area according to workplace requirements. Completed |
Evidence:
|
Select type and quantity of chips, flakes or fibre to be pressed, from storage location. Completed |
Evidence:
|
Conduct pre-start checks on equipment in line with manufacturer’s recommendations and site requirements. Completed |
Evidence:
|
Plan pressing process in line with site procedures. Completed |
Evidence:
|
Communicate plan with relevant personnel as required, to ensure safety and production requirements are met, in line with site procedures. Completed |
Evidence:
|
Form, press, test and transfer finished boards.
|
|
Set and adjust press pressures, temperatures and product parameters according to production requirements. Completed |
Evidence:
|
Check operational condition and set-up of former to confirm mat condition. Completed |
Evidence:
|
Check forming equipment for defects and position to load press in line with standard operating procedures. Completed |
Evidence:
|
Press boards while monitoring and adjusting board position, feed rate, mat condition and press condition. Completed |
Evidence:
|
Plan size changes and line speeds to meet production schedules. Completed |
Evidence:
|
Regularly assess pressed board and thickness changes and make necessary changes to former, press set-up and blending requirements. Completed |
Evidence:
|
Test board samples to confirm adherence to industry standard and reject defective boards. Completed |
Evidence:
|
Dispose of defective boards in line with site procedures and environmental requirements. Completed |
Evidence:
|
Transfer finished boards for further processing in line with site requirements. Completed |
Evidence:
|
Shut down, clean equipment and record information.
|
|
Shut down equipment in coordination with designated stop time and other line operators, in line with site procedures. Completed |
Evidence:
|
Separate and remove board and forming equipment from press using unloading equipment. Completed |
Evidence:
|
Strip and clean blending equipment, press and handling equipment in line with standard operating procedures. Completed |
Evidence:
|
Clear foreign material, dust and debris from machine area in line with workplace requirements. Completed |
Evidence:
|
Record and report pressing process and equipment faults to appropriate personnel. Completed |
Evidence:
|