NTISthis.com

Evidence Guide: ICASAS515A - Manage the testing process

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICASAS515A - Manage the testing process

What evidence can you provide to prove your understanding of each of the following citeria?

Develop test schedule

  1. Determine testing requirements and objectives
  2. Review test plan, where available
  3. Develop testing timeline and allocate resources
  4. Document test objectives and schedule according to test procedures and distribute to appropriate person
  5. Obtain feedback and incorporate relevant changes
Determine testing requirements and objectives

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review test plan, where available

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop testing timeline and allocate resources

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document test objectives and schedule according to test procedures and distribute to appropriate person

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain feedback and incorporate relevant changes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete test procedures

  1. Copy necessary code into the testing environment
  2. Allocate and manage personnel carrying out the testing process
  3. Administer alterations or changes to the code
  4. Integrate code into production environment
Copy necessary code into the testing environment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Allocate and manage personnel carrying out the testing process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Administer alterations or changes to the code

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Integrate code into production environment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review the completeness and accuracy of the system

  1. Administer full system test to ensure suitability of the system
  2. Document outcomes of system test for use in subsequent development phases
  3. Evaluate results of system test to determine acceptability of system
Administer full system test to ensure suitability of the system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document outcomes of system test for use in subsequent development phases

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate results of system test to determine acceptability of system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the ability to:

develop a test schedule

manage the procedure

review and accept or reject a pre-implemented system based on test outcomes.

Context of and specific resources for assessment

Assessment must ensure access to:

appropriate learning and assessment support when required

modified equipment for people with special needs

human resources

requirements and design documentation

test plan

test hardware and environments (testing to be carried out on the same platform as the completed system, with scheduled testing to be on the production platform and the production environment required as part of test preparation)

system or application suitable for testing.

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:

direct observation of candidate developing a test schedule

verbal or written questioning to assess candidate’s knowledge of:

entire system requirements, both development and implementation

testing process

evaluation of candidate’s documented test outcomes:

confirming functionality

addressing any software issues.

Guidance information for assessment

Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, where appropriate.

Assessment processes and techniques must be culturally appropriate, and suitable to the communication skill level, language, literacy and numeracy capacity of the candidate and the work being performed.

Indigenous people and other people from a non-English speaking background may need additional support.

In cases where practical assessment is used it should be combined with targeted questioning to assess required knowledge.

Required Skills and Knowledge

Required skills

communication skills to:

liaise with colleagues and staff

negotiate with team members

present information

literacy skills to analyse and evaluate information

planning and organisational skills to:

estimate scope, time, cost and quality

scope communications and risk management

problem-solving skills to develop strategic initiatives and review procedures and documentation used in the system test

research skills to identify, analyse and evaluate:

broad features of system testing

best practice in system testing

technical skills to use application software to analyse, evaluate and present information.

Required knowledge

automated test tools, with detailed knowledge of some features and processes

organisational procedures

system requirements, with detailed knowledge of the particular system requirements and features

system or application being tested

testing techniques.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Resources may include:

personal computer (PC)

staff

time

software.

Appropriate person may include:

authorised business representative

client

supervisor.

Testing environment may include:

dedicated network

live network

testing network

development network

production network.