NTISthis.com

Evidence Guide: ICASAS516A - Perform stress and load tests on integrated platforms

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

ICASAS516A - Perform stress and load tests on integrated platforms

What evidence can you provide to prove your understanding of each of the following citeria?

Create test plan

  1. Determine scope, objectives and specific tests in order to place load on the system, including expected results and performance impact
  2. Determine and document standards for acceptance and compliance with client
  3. Determine and document clear responsibilities and contact points with third-party suppliers for support
  4. Identify testing resources and tools from a range of available sources
  5. Identify and record base-system loads or level of activity against which the test will be measured
  6. Identify processes or steps in test, including automated testing
  7. Assemble test-plan documentation and distribute to appropriate person
Determine scope, objectives and specific tests in order to place load on the system, including expected results and performance impact

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine and document standards for acceptance and compliance with client

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine and document clear responsibilities and contact points with third-party suppliers for support

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify testing resources and tools from a range of available sources

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and record base-system loads or level of activity against which the test will be measured

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify processes or steps in test, including automated testing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble test-plan documentation and distribute to appropriate person

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake test

  1. Implement test plan according to test plan sequencing
  2. Confirm that each technology component operates correctly within integrated platform
  3. Confirm that integrated platform operates to project and industry standards
  4. Undertake documentation of testing outcomes to meet project standards
  5. Detect faults
Implement test plan according to test plan sequencing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm that each technology component operates correctly within integrated platform

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm that integrated platform operates to project and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake documentation of testing outcomes to meet project standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Detect faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Diagnose and resolve faults

  1. Identify and document faults according to project plan
  2. Diagnose faults and take corrective action
  3. Manage problem-resolution processes according to project procedures
  4. Enforce compliance standards with third-party suppliers, as skills required
Identify and document faults according to project plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Diagnose faults and take corrective action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manage problem-resolution processes according to project procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Enforce compliance standards with third-party suppliers, as skills required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Update documentation

  1. Update appropriate project and system documentation to record and present test findings to development staff for their attention, if test is unsuccessful
Update appropriate project and system documentation to record and present test findings to development staff for their attention, if test is unsuccessful

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the ability to:

test the system's ability to cope with expected high levels of data volume while meeting the predetermined performance standards

identify problems and fault-resolution strategies that may occur during stress testing

ensure system operates in the manner expected under expected conditions

ensure supporting material, such as procedures and forms, is accurate and suitable for the purpose intended

determine that stated conditions reflect the upper limits expected by client

ensure there are no unacceptable reductions in service

ensure individual elements and the overall system provide the desired result or functionality

ensure documentation is available and accurate.

Context of and specific resources for assessment

Assessment must ensure access to:

business requirements

project documentation, including templates, standards, specifications and client user and technical manuals

business rules and expected loads

base tools

technical components of system, including software, hardware and network

staffing resources, including development, operations and client user representatives

system or application suitable for testing

appropriate learning and assessment support when required

modified equipment for people with special needs.

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:

direct observation of candidate preparing for test, and recording and investigating discrepancies and corrections after test

verbal or written questioning of skills and knowledge for identifying acceptance criteria and developing test plans

evaluation of candidate’s documented record of test results and recommended solutions.

Guidance information for assessment

Holistic assessment with other units to the industry sector, workplace and job role is recommended, where appropriate.

Assessment processes and techniques must be culturally appropriate, and suitable to the communication skill level, language, literacy and numeracy capacity of the candidate and the work being performed.

Indigenous people and other people from a non-English speaking background may need additional support.

In cases where practical assessment is used it should be combined with targeted questioning to assess required knowledge.

Required Skills and Knowledge

Required skills

analytical skills to analyse, diagnose, and evaluate the development of new criteria, knowledge and procedures

communication skills to:

gain consensus on concepts and clarify responsibilities

negotiate with client, third-party suppliers and technical staff

present information

literacy skills to:

develop procedures

interpret technical specifications, standards documents and related documentation

update documentation

planning and organisational skills to:

determine responsibilities and contact points with third-party suppliers for support

determine specific tests in order to place load on the system, and determine expected results and performance impact

estimate project scope and objectives

technical skills to:

conduct tests

diagnose faults.

Required knowledge

automated test tools, with detailed knowledge of features and processes in some areas

organisational requirements relating to stress and load testing

program design and performance

system or application requirements and performance

testing techniques, with detailed knowledge of features and processes in some areas.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

System may include:

application service provider (ASP)

applications

databases

gateways

internet service provider (ISP)

operating system

servers.

Client may include:

external organisation

individual

internal department

internal employee.

Appropriate person may include:

authorised business representative

client

supervisor.

Component may include:

databases

networks

servers

software integration.

Project plan may include:

parties and their responsibilities

planning and preparation that begins in the design phase, and runs concurrently with design, code and implementation

project budget

project objectives

project scope

schedule.